Skip to main content

tv   [untitled]  BELARUSTV  February 17, 2024 6:35pm-7:06pm MSK

6:35 pm
as a gift, but knowledgeable people , of whom there are only a few, take it as a gift , ask any friend what sosh filigree is, it’s unlikely that most people even know what we’re talking about, filigree made of wood is not found anywhere else in the world, that is, carvings are there in in russia, their potters are good, i’m not saying there that they are worse than everything there, but they seem to be present in other countries and peoples, but this is not the case anywhere. here one would think about how to preserve rare equipment, pass on knowledge, found a school, but vitaly just smiles sadly, they had experience in recruiting students, after which he firmly i decided that tesla’s workshop will remain only a family affair, the students are not like that - this is a bad idea, because a person comes, you accept his family, it becomes family, you reveal all your secrets to him, you reveal yours to him.
6:36 pm
6:37 pm
no one will see, i can make it, i can break it, i just have to understand that i can do it, everything impossible is possible, maybe, if you haven’t tried, how can you say that it’s impossible, if you haven’t done it, any country is proud of the fact that only she has it, she promotes it as her national brand, on this is building an entire industry. tourists take home souvenirs and boast that they managed... to find a thing that is made only in one place on the planet, but all this could relate to the sosh scania unique belarusian art, whose secrets are kept by a few masters in their workshops, such as the workshop tesla.
6:38 pm
watch everything that modern belarus lives today on the belarus 24 tv channel. this is news from foreign countries, broadcasts of especially important events, live broadcasts from the scene, current interviews with famous belarusians, exciting travels around the country, feature films for all ages. on the territory of the countries
6:39 pm
: azerbaijan, kazakhstan , turkmenistan, uzbekistan, kyrgyzstan, tajikistan, georgia, turkey, iran, iraq, kuwait, bahrain, qatar, united arab emirates, saudi arabia, syria, jordan, lebanon. set up a satellite dish azer space 1 satellite . tv channel signal. belarus 24 and discover belarus. if a repairman sits at an enterprise and does nothing, that’s good, because that all mechanisms are working. right, that means
6:40 pm
he did his job correctly, reliably and efficiently, every employee is either an employee of my workshop, or an employee of some... my name is sergey makhnach, i work as the head of the centralized repair workshop of the lukomolskaya agress branch of ru vitebsk energo, i and the staff of my workshop are engaged in repairing and maintaining in working order all the equipment of lukomalskaya gres, so that our station constantly
6:41 pm
and uninterruptedly supplies electrical energy for the whole country. lukumalskaya gress is the largest thermal power station in the republic of belarus; its construction began in 1964, before which several places were selected. but ours was chosen on the shores of the natural lake lukumalskoye, and construction began in february 1964. the first power unit was put into operation in december 1969, that is, 5 years later. after the war, the industry
6:42 pm
of the soviet union developed very actively and, accordingly, there was not enough electrical power specifically for the construction of production products. accordingly, build everywhere everywhere. electrical stations, the republic of belarus was one of the main ones where heavy engineering would be formed, which required large expenditures of electrical energy, so in order not to transfer it, it was decided to build here here. the construction was very grandiose, and thanks to the lukumal aggression, our city, novolukomal, was formed. there was nothing here before construction began. in general, even when prospectors arrived to excavate the place construction of the station, it was a wasteland, forest, bushes, swampy in places, and a couple of villages, and literally after
6:43 pm
the decision was made, construction began, in 60 years our city has grown, expanded, it is relatively one of the youngest in the republic . many of us believe that the construction of the lukom gress is expanding, because some new facilities are constantly being introduced. the lukomskaya gress itself initially consisted of eight power units. by commissioning a ccgt unit, this is what
6:44 pm
we have as the ninth power unit, yes a combined cycle gas plant with a capacity of 427 mw was commissioned in 2014. our starting boiler room also has a tank with a pump and a battery tank, the same dgu, dgu 5,000 and dgu 2,500, this is the power accordingly. closed loop station. our lake mainly serves for cooling. all the water that goes through the channel is needed to generate waste steam.
6:45 pm
that's it, there are eight power units here, a lot of samples, fittings, all sorts of details, especially and they are here, well, kilometers on... that's right, the pipes are on the left of me on the right of me, so they all have to work and work thanks to the repairmen, the maintenance personnel as one single whole, the output of any one unit leads to a whole chain, until our turbine stops, this is ours a large room, it is divided into two parts, this is the turbine compartment and the boiler compartment, respectively, with the turbine we have it
6:46 pm
, it goes through pipes, turns into steam, there are burners next to it, through which gas is supplied, it is ignited, and accordingly ignition occurs, they stand at many heights, and where the water is heated, passing through all the pipes, the steam island pipeline from which steam with a pressure of 25 mega is 250 atmospheres. with a steam temperature of 445°, this is the first steam that hits the
6:47 pm
turbine blades. steam under pressure rotates this turbine, but the turbine rotates the generator, electricity is generated, well, it is supplied, so to speak, to the wires in the sockets, this is all under the housing, the most important thing is where we rotate, that is, the steam is transferred to the blades, which is happening in... power units operating, for example, 100-150 mw per power unit, they can immediately ramp
6:48 pm
up to 300-31, we have a unified energy system, so our electricity can be said to be everywhere, at the main enterprises, and to a greater extent in all houses , it is possible to distinguish ours from electricity, for example, beloe, because we are all connected to one wire, one cable, in 2014. the 427 mw ccgt unit was put into operation. the ccgt is a steam-gas plant, built together by our chinese comrades. our lukomorsk station is like it worked, it still works, but it was a separate project that added to the increased capacity of the aal station. there is a slightly different principle of electricity generation here. gas that is supplied separately from another hydraulic fracturing unit. comes to us here at the pgo, through live compressors, its pressure increases, and it
6:49 pm
is already supplied to the gas turbine, where this gas is directly burned, due to the combustion pressure the gas turbines rotate, the heart of lukumalskaya gres is the central control panel, the central panel - this is the main brain of control of everything station, all the information that... happens, sometimes even flies out, one might call it that, flows here, and to workplaces to eliminate
6:50 pm
some defects that affect the safety of the operation of the power equipment itself. we introduce you to the architectural memories of belarus, different eras and styles. byzantine architecture, that is. the hour has passed in earnest, yana sur'ezna floated on the old russian style, and that's all that the people of the 19th century know, this is the same project, the russians are working on and extracting such symbolic elements of that old architecture, which would otherwise have already materialized.
6:51 pm
let's look at their history and basic facts. theater, mass theater. were cut out from the issued red tags, and all this hell, it was a white color scheme that worked contrast and madness, emphasized the focus on these elements, a can of 20 hundred years was already planned for our father, there was great size and danish memories with quarters for supratsonika , look at the architecture of belarus on our tv channel. our skin padarozhzha on paless is a sapraudnaya cultural-historical expedition. likhvan likhvanyanya. and all the gety lifan likhvanyanya dazabіў shchykal hell kamtsialya. and all of us are happy, as if i would give the skin kind
6:52 pm
characteristics, i am on the local dialect language here .
6:53 pm
ours is one of the main ones, because all the iron that is located at lukomalska ogres, even that very turbine, or any, any unit, there are all the parts that sooner or later undergo repairs, they wear out during operation, any equipment passes everything is through us, if. will do its job poorly , accordingly, this whole colossus will not work, or if it works, then it will work incorrectly, incorrectly, unsafely, not economically, the composition of my workshop, the repairs carried out, at the moment there are 309 people, of there are 55 of them - managers, specialists, employees,
6:54 pm
foremen, this already includes foremen, senior foremen, my deputies, technicians, and engineers. specialists, that is, the remaining part are workers. the structure of the workshop consists of three departments: boiler department, pipe department department, the third section is the preparatory department. this preparatory department has a very large number of different professions and specialties. these are the crowners, these are the drivers, these are our machine operators, then we have workers, milling operators, general -purpose machine operators, we have welders, and there are elevator operators. there are a lot of specialties, the centralized repair process does not just carry out repairs, it also performs refilling of sliding bearings, that is , a sliding bearing, like ours, for example, it is large, it serves as a support for ours - well, for our turbine , which generates electricity while rotating
6:55 pm
, all the main repairs begin from here, because small parts are also sharpened here, such large bearings, they are repaired, then they are installed, again tested in the metal laboratory, and if everything is fine, everything suits all the parameters, it suits, that is, the geometry , the grade of steel, the tightness of the fit, if everything is good, then it is installed on our turbine and it works quite significantly, well, for a long time, and i myself am a person from production, i think that direct communication with the staff, for example, right? and directly seeing how they do the work, i think this is one of the first immediate tasks, our processing is good, no pores, no words, nothing, that’s all.
6:56 pm
happened very well and efficiently, it seems that there is a small thing there, a small switch has formed on the pipeline, no, it happens sometimes, this is very important, because our station has very supernatural pressure values. by temperature, so even a small whistle, as we call it, can lead to the installation of a power unit, which could lead to an accident, this is the bearing housing, it is already a bearing for installation on the turbine, if you come further here, then here we have a universal one a turning screw cutter on model 165, here the bearing housing for the circus pump is already being processed and manufactured; if this bearing is not there, it will not work. pump, and the church pump is cooling in the system, so the unit simply will not work. any piece of iron, nalukomal gres, which is connected with
6:57 pm
the main auxiliary equipment, is everywhere the hands of the specialists of my workers. at this stage, the milling machine is making a blank key, which will subsequently be installed on one of the shafts, well , either it will be a pump, or it will be something else... well, my first machine that i worked on was this one this one, there were two of them, this was when i was a student, starting with the smallest detail, a pin, a valve, some kind of cuff, which we also do a lot ourselves, finishing large fittings, which are 1,800 in diameter, maybe 1.8 m, our hands are everywhere, a power plant is a very large living mechanism, which... consists, probably, of millions, millions of spare parts, that is, small cogs, therefore, every employee with us, he must first of all
6:58 pm
realize that by producing his own parts with high quality, by producing his parts with high quality, he first of all helps to generate electricity as a whole. god gave wings to some, and wings to others, but it seems like both are flying, but what different trajectories, prospects? 34 trillion, the us national debt mark has been reached, they live at the expense of others. and this is a very important element that the united states will try to preserve at any cost. all politics is based on this now, it’s very nice to talk about
6:59 pm
democracy, to actually make money from human blood. we have different motivations, these people only want money, we are committed to creation. thank you very much to our alexander grigorievich that we have peace, order and that we do not have war. many people don't understand this. the air that you are not you notice when it ends, you begin to realize what you have lost. the markov project is nothing personal. watch on the belarus 24 tv channel . 100 brave guys gathered in our studio. igor aleksandrovich, why do you think the children chose you to talk? first of all, if the children chose, it means they saw me on tv quite often. well , the second thing is that children always like large dimensions. and...
7:00 pm
could you tell me how to walk correctly ? i noticed you have very cute shoes, and high heels? the very first reason why you you can fall, this is when the socks begin to braid one after another, look at the project 100 questions for adults, on the belarus 24 tv channel
7:01 pm
. there has always been a certain number of vacancies, the question arises that some specific specialized institutions, or maybe lyceums, but at this stage we settled on our school number two, that’s where a class of 10-12 people was created who come here, we familiarize them, give them excursions, bring them up to date so that they decide on their specialty, but in i am more sure that some of them will come here for the lukom gress. if something suddenly changes, both minsk and bobruisk, and the sludge reaches beloozersk, because we have one energy system, and if someone, for example, in minsk, on minskaya tes or somewhere else there is not enough electricity, so we connect and replenish it, the children cannot decide, in principle, a vivid example, there i am, i also could not decide where to go on the initial path of my life,
7:02 pm
so it’s small. a push, a little experience, helped me decide on my future fate, then the same water turns into a park, into a turbine, into a turbine in a boiler that spins our turbine, the same thing i want our children to consciously choose their path, a specialist comes to us and gets a job . ..
7:03 pm
the energy system as a whole, we have a very large susferasco, this is the sosnovoy bor health complex and the pioneer camp, procedures that are in very high demand, this is stone massage, this is a spa capsule with wraps or a speleotherapy room. basics the advantages of the pine forest are the presence of mineral water, two wells with mineral
7:04 pm
water. this is drinking water with a mineralization of 6-8 g per liter. initially, the dispensary worked only for scannergo workers. now, not only workers, but everyone who wants to, can get healthy here. the main advantage in health improvement is that we offer procedures every day, seven days a week, even on holidays, so that we can improve the health of our employees at lukomskaya gres, the flagship of the energy industry.
7:05 pm
and here my mother and father, they worked for 32 years at lukomskaya gresa, my father worked in metal laboratories, my mother worked in the accounting department, my father said, well , come on, come here to lukom mud, for any specialty, i decided to try, probably, it was more related to metal processing, so i was accepted here as an apprentice milling machine operator. i received a specialty, then i moved on with the student, that is, i increased my rank, and i realized that i was interested in the sense that from an incomprehensible piece of iron i could make some kind of part that in the future would become somewhere in our power unit, or somewhere on the main hull, this probably played a greater role in why i will go for the lukumal gres, because after all, it’s a flagship.

9 Views

info Stream Only

Uploaded by TV Archive on