Skip to main content

tv   [untitled]  BELARUSTV  June 19, 2024 3:10am-3:40am MSK

3:10 am
on braslav lakes are blue like the early sky, which is right in the racing forest. in the beginning , the dawns are angry, the creatures and the world are washing, and the devils are appearing. the accumulated azers are woven with charms, smiling at the sun, you look for yourself, and never from the sea, the bottom, which is gilded with gold , and without end, the accumulated azers, as not year, no matter what i know ,
3:11 am
the games are over. now there is an information war, first of all, at one time polish prime minister donald tusk questioned the quality of belarusian products. i i showed you your belarusian beef jerky and compared this packaging with polish beef, which contains an incredible amount of chemical additives. the quality of belarusian beef commands complete respect. this article speaks of a fugitive traitor, a citizen of the republic.
3:12 am
outstanding meats of belarus with a long history. we can obtain abaronial doilitstva from the right-wing architecture. on the contrary, in synkavich and malamazheika. we dachify the round pots there in the tanks of the budynka. і all for the getag periyada hour round vezhy velma characteristic. hanna, iago’s little wife was no less than a glory to the family of the platars. here we are unraveling emilia platar and all of them. astatine nodes
3:13 am
of the past, their floating on the pharmaceutical eco-centers of the country and the life of extraordinary people, not a simple palette of plants is suitable for the life of extraordinary people, and the temple, the house of bo well, i’m thinking not only about the months of malitva, but also about the months of paratunka, and people are wondering about the dates of paratunka. cultural-asvetnitskiy project, architecture of belarus. gety kastsel does not end and in the savetsk period, the kali vyalikaya kolkasts of the temple stratsila its pershachatkovaya meaning. geta dapamaglo seize the interiors of the temple. on the scenes there are the same plasterboards with the same canlures, and this is the basis for the great jumper, the decaravan of the belt, which will serve as the basis for this space. glyadzice on our tv channel.
3:14 am
3:15 am
topographical technical school and the city of minsk received distribution, i came seemingly temporarily, stayed with us completely. i already live here more than 2/3 of my life, i started working in the ninety-first year, i work to this day, i can even say that here’s a little bit, but i’m involved in the history of our enterprise, my name is nikolai penyugin, i work as a production manager at the rodoshkolchesky ceramic factory, the motto of our enterprise.
3:16 am
my day starts at 5:00 in the morning, regardless of any weather, then... winter, or summer, heat, cold, rain, i get up at 5:00, at 7:30 i arrive at the plant, walk around the sites, find out what breakdowns are there, what questions about the operation of the equipment, this is where my work day begins, well, denis, how are we doing, show me, i’ll take a look, everything is fine, there are no stones, no can you hear today? the feeder turns off, everything slows down, everything is as it should be, but what about our runners? work, nothing is knocked out anywhere, and the first and second pencils are missing, we have one single goal, one task, to produce building material. the history of our
3:17 am
enterprise dates back to 1981, when by decree of the council of ministers of the ussr, number 959 of january 1, eighty-one, there was a decree then, a decision was made to build a construction plant in the village of radashkovich, accordingly , the raw material base and the first brick were already explored it came out in december 1984, we take the materials from the gaidukovka quarry, it is located 30 km from our plant. the fertile layer is removed from the roof, usually there are plant roots there too, all of this is removed, perhaps stones, some sand, until it reaches the mineral, that is, we have clay directly.
3:18 am
special pumps are installed that pump out groundwater; this is the continuous operation of these pumps. to remove the water and after that they begin development, a bucket excavator, he little by little it goes deeper down from the top, we are now watching how the shipment is going on, i would like to know on which ledges, where we have what kind of clay, we will mine in two or three ledges, now the first mining ledge is being mined, we are carrying out roofing work , gradually we will move to the second...
3:19 am
accordingly, it evaporates, excess moisture is removed, after it reaches a certain condition, we supply it to the workshop. we have two receiving feeders, into one we feed clay, into the other we feed sawdust, into the third one we have is a thinner, using waste molding sand (oms) or sand. depending on the content, that is, how much sand or sawdust we also get, the firing regime changes and accordingly we get this or that product with a certain brand, after the clay is fed into the feeder, we mix the ingredients, which consist of clay, sawdust and sand, we get
3:20 am
the final product is called a shekta; there is also a disintegrator or crusher, where the clay is partially converted into sawdust. after that fed to the conveyor and wet grinding runners. wet grinding runners are for better processing of raw materials, there are two wolves of the total mass. 35 tons they crush this clay, that is, if there are any various natural inclusions, it crushes, the main goal is that the limestone that gets in, we must remove it, and in addition to the fact that we grind all these natural inclusions, we mix various additives, we get clay 5x10 granules like this, after that they go into drying drum, where further... the processing of raw materials is dried to a certain humidity and put into a charge storage tank, it
3:21 am
is located directly in our workshop, if it is completely filled, this is about 10 days of work, we see the mine, this is processed clay, to which certain additives have been added, it has been brought to a certain condition, that is, it meets the specified parameters for humidity, if the clay forms a lump. it means it has normal humidity, so we knead it and see that it crumbles into some honeycomb parts, that is, it corresponds to all technological parameters, the clay from the stock charge is fed to the belt conveyor and at this moment the fine grinding rollers arrive, they exist in order to grind. this clay, you see, the cones are large, we get cakes,
3:22 am
it breaks, and the carbonates that still remain after taking the preparatory section, they are finally abraded here, crushed, after that the clay gives in, the clay is ground, at 7:45 we have a flyover . hello, everyone is alive and well, well done, so, well, let’s begin, that means, today we lay the charge on a solid brick, the marks are known, between two dumps, we plant the bkp trolleys, mold, mold accordingly, we all know the norm, 14,000 per shift for molding, 135 nozzle, that's it, gets to work.
3:23 am
every day we work to ensure that you receive the latest and most useful information. the twenty-minute format allows us to talk about what is happening in belarus and the world. complete the linguistic walk through capital in the company of our guides, find a new place on the map of belarus that is definitely worth seeing, and also suggest projects and films that will certainly become your favorites. this and much more awaits you in the ether 24.7 project. watch on the belarus 24 tv channel
3:24 am
. i started working here in ninety-one with the operator of the cage section in workshop number two. then in ninety-six i moved to department number one, in 2001 i went to the central control panel, then i went to work as a shift supervisor, i am a shift supervisor worked for 17 years, achieved some certain skills, the ability to lead, because if you look at it this way, if you have learned to manage three or four people, then the number doesn’t matter.
3:25 am
preparation 500 tons, the charge was taken for a porous block, molding 63, charging 63, packaging unloaded 13 trolleys 126. all processing stages are working, i have everything, i keep records every day, and i can see at any time whether we are in the black or in the black minus, during the day i go around the sites, yura, i’m healthy, how are you, everything is fine, my blood pressure is normal,
3:26 am
vacuum 2:30, we installed a third line in 2009, this is for the production of large-format blocks, now we produce 6-7 million boiling pots per month, before there were 3, 3.5 and there were 2 workshops, now there is only one, that is, this is already we can say that we have achieved something, we have a lot that has changed, in the thirteenth year we purchased... prez a very high degree of vacuumization of the products, that is, the less air remains in the raw materials, the denser the mass, and accordingly this already affects the quality of the product, multi-line cutter purchased, this also allowed us to increase productivity, roughly speaking, if you count 26 bricks in 9 seconds, it turns out to be 140,000 per
3:27 am
shift, this is a pretty good result. there are monitors where it’s written down, so we see how the excavator moves, it’s a double
3:28 am
pusher, that is, it’s right here, you can see it on the monitor. the professionalism of the workers is the fifth level minimum, after we mold the raw material, we load it into the drying trolley and deliver it to the drying department, modernization of the dryer allowed us to reduce the drying speed, that is, we can more quickly
3:29 am
drive our products through the dryer and thereby deliver cages to the site, this also affects productivity. after it dries, there is also a humidity percentage of up to 2%, that is, we remove all excess moisture and this dried brick is delivered to the planting area, we remove it from the drying trolleys, put it on the firing trolleys and, accordingly, send it to the tunnel kiln, we used to have a portal, six captures were thunderous, this the frame walked, it moved on the rail. we have now installed two robots, which allowed us to increase labor productivity and make the operator’s work easier, we are filming one by one, it’s all done very quickly, that is , on average, our oven cart takes about 25-30 minutes, we’ll say from 9: 00,
3:30 am
almost until 10, in 25-30 minutes we can plant. there is a btk technical control bureau; they come several times during a shift and take some measurements. at the cage area, we separate defective products, if suddenly, well, somehow it could have slipped through, either it was a molding defect, or it was a dryer defect, that is, the defective product is removed. well, we have a reject line, so we reset everything, the shoulder blades drop, reset , everything is removed. how it approaches, how the stop is lowered, how the product is accumulated, then a package is formed and after that it goes to the shrinkage line, where it is removed from the table by robots and transferred to
3:31 am
the firing water. our operating hours are from 8 to 8 pm, from 8 pm to 8:00 am, that is, 24 hours a day. average age of workers somewhere around forty. all the workers practically live here, well, a decent salary, if the work is rhythmic, if there is sales, then the salary will be higher, well, we are trying to do this, so, well, tell me about the temperatures, what we can hear on the dryer 29, 51, in terms of humidity, 42-40% is normal, good. and what is the temperature on our furnace, how has the temperature reached everything in the dolpchik zone, it’s good to dial by pushing 14:30 12:35 the entire
3:32 am
production process is controlled by a central control panel, the operator’s workplace the control panel of heating engineering technicians are responsible for this, we have created automated workstations, that is, there are screens, monitors everywhere, at any time... at any moment we can look, track where this or that type of product is located in the tunnel the kiln is fired, at the same time 53 firing trolleys, if we multiply 53 by 9 almost, but 500.00 kerpeches at a time in this unit, that is, we changed 55 panels, having served their term, replaced them with new ones, this allowed us to increase the firing temperature, accordingly.
3:33 am
yes, in general, they perked up, gas is probably safer in the sense that if everything is done correctly, the automation system, the protection is in place, there are special interlocks, that is, this allowed us to reach new milestones in terms of volumes and product output. we are embarking on an expedition in the depths of our country. we are heading out on
3:34 am
a folklore-historical expedition to number 597. things will happen again and again in the past in the past. let's follow the history and myastsovye abrads. our routes took us to the ukrainian agricultural town of obsa, in braslauschyna. here on beraze lakes with getkim and call mestsitsa. and give new life to these old traditions.
3:35 am
time with projects in advance on tv channel belarus 244. today, brick as a building material has not been canceled, and it is in demand, the way of the kitpech, depending on how... the most basic indicator
3:36 am
is morality, well, it depends on the amount of components that are in the charge, that is, if we get natural raw materials - this is clay, sand, and after it is processed, we already have a charge, here, depending on the quantity of any components, the quality of the cerium depends on this.
3:37 am
denar, full-bodied, that is, the common people can simply call it a ceramic stone. today our enterprise can produce eight types of products. at different stages and for different needs , different bricks are used. solid ones are just stone, ceramic, made artificial stone. we use it for laying underground communications, laying a fireplace or stove. one and a half hollow brick - 120x8. he for the construction of walls, a larger format is a partition wall, a large format, if we are building a box, the wall thickness is 380 mm or 400, this is the final stage of brick production, here we remove
3:38 am
the products from the firing. trolleys onto pallets, after which we pack them and deliver them to the warehouse for finished products. in order for our products to reach the consumer in a normal, beautiful form, we purchased both a horizontal and vertical strapping machine, that is, polypropylene film, it is tied on pallets, and after stuck, it is packed in film. and correspondingly. is already delivered to the finished product warehouse, from where the products are loaded onto transport vehicles using forklifts and distributed to the consumer. we have an idea to do layer-by-layer disassembly of bricks at the packaging site, and this will allow us to make our products even better, to produce facing products - ordinary ordinary bricks, due to the fact that... we have arranged
3:39 am
the packaging of products, we can store them all year round, and we ship throughout the year 24x7, the block is paralyzed bkp, modification number two, this is the passport of our product, branding, density are written here, these are the dimensions 250 by 120 by 138 in width. our consumer who buys our product can check whether the brick is of high quality or not, when he knocks, there is a ringing sound, which means the quality of the product corresponds to what is stated on the passport, despite the fact that today there are many types of building materials, the brick is still remains a classic of the genre, because... well,
3:40 am
belarus welcomed me with open arms, i came as if to my own home, when i arrived here, i was struck by the cleanliness of the city, and the most important thing that distinguishes a belarusian is the kindness of his soul.

9 Views

info Stream Only

Uploaded by TV Archive on