Skip to main content

tv   [untitled]  BELARUSTV  July 14, 2024 7:20pm-7:50pm MSK

7:20 pm
in some areas there were thunderstorms during the day +29-34°, the entire podium belonged to the belarusians, the third stage of the international tournament in modern piteboria, the pavel lednev cup, ended in minsk. over the course of 5 days, the best athletes of belarus and russia competed in ratomka; on the final day, a heated belarusian fight unfolded. anastasia prokopenko, in her signature discipline lazrran, was able to make up a minute gap from the leader. and reach the finish line first, violetta agurieva finished second, another belarusian irina prasentsova became the bronze medalist. i i realized that it was very hot, even during the warm-up, and not everyone was ready for it, and after the world championships where it was 42, i basically tolerated this heat well, and besides , the humidity there is so good in jinjou, and it seemed to me that i i can do anything, i remembered that i ran well for four laps, the fifth was just trying to run, well, here it also turned out that four straight went well. that’s why
7:21 pm
i love belarus, previously the strongest were determined by men, so the russian kiril manula became the first at the third stage of the lednev cup, and the best of our guys was maxim maruk, he showed the third result. this was the information picture on sunday, the results of the week will be summed up by my colleagues on the main broadcast at 20:00, at 21:00, watch the closing ceremony of the slavic bazaar art festival in vitebsk. thank you for your attention. the belarusian beach soccer team will play the second in a series of friendly matches with the russian team, which is a three-time world champion. meetings at the new arena stadium in st. petersburg will begin at 20:00 and will be shown live on belarus 5. previously, belarusian and russian beachgoers met 22 times. the belarusians won four victories and were defeated in the remaining eighteen games. this season the belarusian team will compete in the euroleague. qualifying for the 2025 world cup
7:22 pm
. there are a few hours left before the main football event of the summer in the euro 2024 finals , the teams of england and spain will meet. the decisive match on the field of the olympic stadium in berlin will be judged by a french team of referees, headed by fransaa. most specialists prefer spanish a team that did not lose a single match at this championship. the starting whistle will take place at 22:00.
7:23 pm
7:24 pm
look at everything that modern belarus lives with today. on the belarus 24 tv channel, this is news from foreign countries, broadcasts of particularly important events, live broadcasts from the scene , current interviews with famous belarusians, exciting travels around the country, feature films for all
7:25 pm
ages. on the territory of the countries: azerbaijan, kazakhstan, turkmenistan, uzbekistan, kyrgyzstan. tajikistan, georgia, türkiye, iran, iraq, kuwait, bahrain, qatar, united arab emirates, saudi arabia, syria, jordan, lebanon. set up the azer space-1 satellite dish. the channel's signal is broadcast in the clear and is available 24 hours a day every day. be. the house was brought to such a state that the pipes simply fell apart, cracks, mold, unpresentable appearance, stairs, everything
7:26 pm
fell into disrepair, who takes on such sources and why the quality and timing actually diverge from what was promised, crimes in which i have already fallen twice. well the tender should to weed out all the unscrupulous ones, let’s just say, how is it that they still end up at such objects. the choice of a contractor is the key to the future comfort of citizens, but even having provided for all the costs, sometimes the invoice of the work cannot be assembled into a single puzzle. i just decided not to install some of the insulation on the roof and somehow didn’t install it in silence, i promised and didn’t do it. to restore order in housing and communal services, where every fifth complaints from citizens relate to major repairs, the order of the head of state: they came, destroyed the apartment or the roof, made it worse than it was, which means it’s necessary make sure that it’s not commonplace to see where the deductions for major repairs from
7:27 pm
the owners’ associations go, why doesn’t this scheme work anymore? of course, there are certain irregularities, but there is no longer such a wave of problems as there were before. a joint project.
7:28 pm
they completed it only last year, although according to the papers the house had long been put into operation, immediately after the commissioning of the first launch complex, there are 10 of them in total. they were required to deliver 10 launch complexes, but... as a result, only one single one was commissioned in the sixteenth year first launch complex, this is a water supply and drainage system, that’s where it all stopped, after another pause, the builders returned to bring
7:29 pm
the façades and roofs into proper shape, then there was silence again, they started working on the balconies and canopies of the entrances already in 2023, while major repairs were being carried out here, they were adjusted more than once ... definitely, definitely, this does not allow delays and does not give full control, including from the housing and communal services, to carry out the work and disburse financing in full, that is, for all houses, that is, it is not allowed disruptions in the production of work. amendments to
7:30 pm
the regulatory framework made it possible to turn the situation around in favor of the people; in general, after 2020, the standards for performing major repairs have undergone many transformations, if... organized an inventory of all completed housing for 2019 across the country, housing was carried out by start-up complexes, and, as a rule, after the first launch complexes , the commissioning of the entire house, supposedly the whole house, was already included in departmental reporting; in fact, by this time only work on the first launch complexes had been completed, this a gas supply system, a water supply and sewerage system, and sometimes everything...
7:31 pm
to commission a house according to an already proven scheme through launch complexes, and then stopped
7:32 pm
work altogether. the customer tried to influence the situation on his own, but the fight against inaction was resolved in the economic court. after 4 years, the minsk house-building plant came to finish what had been started. so they made the steps on which i had already fallen twice, in the summer it’s still tolerable, but in the winter it ’s a disaster. the fact that there was a major overhaul is disgusting.
7:33 pm
residents, as a rule, after major repairs people agree to whitewash and paint them so as not to return to the dusty issue, the final cost of this work often grows into a round sum, which can be quite tangible. however, the vigilance initiative of residents sometimes gives much more. tangible result: this is baranovich. spoiler for the contractor. this story ended in crime. last year , a participant with a good reputation and an offer beneficial to the customer came to the site. the work is not easy, the two-story building is pretty worn out. surprisingly, they made the investment on time, reporting to local zhreo. the most interesting things began with the arrival of cold weather. corner apartment, did you feel here that somehow the panels were completely leaky, it was cold, it was leaking before the renovation? well, yes. yes, of course, for 60 years, after major renovations, the temperature in the apartments
7:34 pm
remained the same before the renovation limits. this is where questions arose not only from the customer, but also from the state control committee. moreover, he was cunning, you know, only an interesting argument was put forward that at the time of completion of the project the necessary insulation was not found provided for in the design estimate documentation, well, the builders probably all smiled now and... saw the insulation, the contractor told us that this was the insulation in full, so we
7:35 pm
believed the contractor, we left the site, our organization carried out additional investigations with the technical supervisors who accepted this object, the amount of damage was slightly more than 13 thousand belarusian rubles, a criminal case was opened on the fact of theft, in addition, it was not possible to avoid legal assessment by the actions of officials who should have monitor the implementation of necessary repair work. now the problem has been solved: the insulation was installed in the attic, but how much ordinary people had to endure before this, and such an embellishment of what was actually done is not at all... during control activities, facts of overestimation of the volume of work performed are revealed, such as an inspection of one of the enterprises housing and communal services of the region for three capital repair projects were found to be overstated by a total amount of more than 190 thousand rubles only after intervention
7:36 pm
committee, the violations were eliminated. repair is one of the most vulnerable topics for the population, quality, timing, warranty, questions are not getting smaller, they occupy more than half of those that are heard on hotlines regarding the provision of housing and communal services, so it remains the highest level of control. something often happens in life, they came, destroyed an apartment or a roof, made it worse than it was, they stole materials, people complain, when i see something like this... on tv, i’ll tell you frankly, my blood boils in my veins, i think , but you officials who are doing this, your roof doesn’t leak, but this person or woman says that she made repairs yesterday, spent a lot of money, these are usually ordinary people, tomorrow the roof started leaking, how can you live in such an apartment, that means we need
7:37 pm
to do it in such a way that it is not a shame, so that it is not a shame for either a private owner or a government organization. at the legislative level in 2022 , housing and communal services organizations were allowed to appoint contractors themselves, this measure turned out to be effective, and the question here is not to not allow the private owner to objects, and give the work to those who maintain their reputation. today , as a rule, there are no problems with contractors appointed by local authorities, of course, there is a certain roughness, but there is no longer such a wave of problems as there were before, such cases are rare when... government contractors tear down projects, plus there is a 5-year guarantee, that is , any issues that arise are always resolved promptly. roughness in half of the cases is associated with pre-design work in houses that were built a long time ago when work began there are many nuances that come out that result in the adjustment of the project and its re-evaluation in all interested authorities, and this is all
7:38 pm
the time that ultimately pushes it beyond the permissible limits. we are in the attic. space of a residential building, and here we see a completely replaced rafter system, but the need to replace it, unfortunately, was revealed only at the beginning of the work, when they opened the roof and saw that all the rafters were affected by rot at the end, in addition, serious defects were revealed on the facades, balconies, window openings, this house in the very center of minsk is of historical value, a lot of attention to detail in order to preserve the appearance... at the same time bring the building into proper technical condition, here the renovations took six months, not so much, if you think about long-term construction projects of past years, if previously there were up to 400 objects of excess capital repairs throughout the country, today this number is already calculated in literally dozens of objects, and then each of the problem objects is under special control in the bodies of the state control committee. every year in the country
7:39 pm
3.5 million square meters of housing are being overhauled; today, 1,200 houses are under construction. only on dozens of them the work has been going on since previous years, the builders are ready to hand over most of the tailings by august 1, time has shown to significantly optimize time and material costs, reduce the number of complaints from the population, the experience of comprehensive overhaul of groups of residential buildings helps, such as today unfolded on lynkova in minsk. currently , construction and installation work for replacement has been fully completed at these sites.
7:40 pm
on all sides, it’s a little difficult, of course, the noise, but you have to endure it, listen, but how are the residents generally disposed to understand all this? well, of course, it will still improve the quality of our housing and our life, i think, after the renovation, they removed the gas pipes, plumbing, sewerage, installed additional detectors, fire detectors, and a towel dryer. they changed it, they work well, the team is well-coordinated, but if some tails remain, then well, you have to wait and wait a lot, but in general. thank you, thank you for talking about us like that cares, well, you need to have patience, however, you definitely need patience, the state takes on 60% of the costs
7:41 pm
of major repairs, only 40% comes from deductions from the population, these are the funds that we monthly, paying the amount in the allowance, transfer to special accounts that are opened in local authorities, the exception was the partnership of owners, which saved in their accounts and often spent related needs according to... the capital repair system, then the partnership of owners with their citizens, since these are also citizens of the republic of belarus, must participate in this system, and if it is necessary to carry out major repairs
7:42 pm
of a fellow owner who is already suitable, the budget will participate in the repair, just like in all other houses. in general, the country is using the budget for major repairs this year. 640 million were allocated. in the context of a regional city , this amount amounts to several dozen. for example, in brest it was estimated that about 41 million would be spent on major renovations. for this money , 31 houses would be repaired. this region, by the way, is sad statistics of long-term construction in the country occupies the most enviable position, from year to year no more than 2%. much attention is paid to choosing a contractor. here on cooperative one the brezsky construction and installation trust works. he was appointed. local executive committee, there were only questions about the basement, but what was there? well, there’s no light, yes, and it’s difficult for me to get through,
7:43 pm
but on the phone they at least promise you something when you call? of course, all issues can be resolved, the work will be completed in mid-august, today there are no prerequisites for delaying the deadlines, everything is on schedule, soon there will be no trace left of the falling tiles on the façade of the rickety window and door blocks in the entrance.
7:44 pm
long-term plans for major repairs go to houses with the greatest share of wear and tear, but residents have the opportunity to influence this. priority is given to major repairs in a house where residents have agreed to a set of energy-efficient measures. this house is the first and only one in brest where the overhaul went beyond the usual scope. the facades needed thermal modernization, they especially felt this residents of the upper floors and side apartments, and here, by the way, it came in handy. the seventh presidential decree, when the state takes half of the costs itself, the second, that which falls on the population, is divided over 10 years. the decision can be considered made when
7:45 pm
2/3 of the owners vote for insulating the house and other related work, but even those who are against, in this case, join in financial participation in energy efficient measures. here, by analogy with the current renovation of entrances, the amount directly depends on the area of ​​the apartment. in this five-story building. for example, can vary from 10 to 20 rubles per month, decrees provide for preferential categories, for which the final cost is divided not by 10, but by 15 years, the fact that there was a meeting of residents is 100%, people were warned in advance, so whoever agreed agreed, there were different opinions, yeah, that's it, but the majority agreed to pay, you're not paying yet, when did we start paying rubles here or how much are we paying, we're already paying, we're already starting to pay, that is , 10 rubles each, yes, because that means. here we are
7:46 pm
not talking about shifting responsibility, but separation between operating organizations and residents. such rules are dictated by the state program for comfortable housing and a favorable environment, according to which 3% of the total housing area is renewed every year in the country.
7:47 pm
in the braslav region, the azers are as blue as the sky in the early days, which are in the right and the racing forest, at the beginning of the evil dawns, creatures and the world, and the fall is known . the ancient azers are woven with charms, smiling at the sun, you look at the bottom, which is gilded with gold, and from their end, the azers are poured, like every year, i still want to sustrezza, so that i don’t know the mountains, the seas, and i never forget about the azeri, my dear.
7:48 pm
petrus brouka, i believe in love, boundless, the love of children for parents, mothers for children, human love in general. i have been working at the minsk central regional clinical hospital since 2001, i came here by assignment, i came to work with novice gynecologists in a large friendly team. we are the ones at the beginning of a woman’s journey, in the chain of her health. human life is a great miracle, a miracle, as a gift from god. the strength of a woman, probably,
7:49 pm
again lies in her love, the way she looks at the world, how she gives her love to children, how she can behave with people, i understand that coming to a gynecologist is a feat for a woman, she i steal the thought from coming. it takes a long time to get ready, and if she enters the office, i need to do everything so that she leaves with a smile, comes with hope, wants to become a mother like crazy, but unfortunately, before that i was diagnosed with infertility, but thanks to tatya nikolaevna i was able to fulfill my goal the most cherished dream, i became the mother of a beautiful girl, she and i
7:50 pm
have been through a lot. and she made a huge contribution to my life, last year i had a stroke right at her appointment, thank you, i’m alive, i’m here, during the period of my activity there is an opportunity to evaluate the quality of medical care that was provided to women in our region, naturally, it has become much higher, the quality is absolutely incomparable to what it was...

5 Views

info Stream Only

Uploaded by TV Archive on