Skip to main content

tv   [untitled]    February 6, 2024 10:00pm-10:30pm IRST

10:00 pm
it can strengthen it, upgrade it and bring it to a stable and reliable capacity, mr. engineer , if you allow us to keep the discussion here , let's say goodbye to the viewers of channel one . stay with us on the news channel. in tonight's special news talk, we were reviewing the achievements that were unveiled in the past days and today in the field of industry. mr. engineer eslami , head of the atomic energy organization and vice president are our guests . only 3 countries are manufacturers of this product and iran is now one of the four countries that have the technical knowledge it has the building. is that right, mr. engineer? yes, it is . it is exclusive, it is not sold
10:01 pm
to any country, neither klouf nor they sell this heating device to any country. it is a committed work of scientists with 4 years of hard work by our colleagues , whose average age is 35 years old . they are in shahid ahmadi roshan complex. in netensez, this work was done as a group work where all disciplines and in fact the departments in the field of engineering and construction technology worked together as a unit and were able to achieve this very strategic phenomenon in a completely creative way. in the rich process we always want to measure the quality of the product
10:02 pm
. if we install this in the process itself, we will always be informed online about the current situation, or if we want to provide a laboratory service in the laboratory, we can provide laboratory services, especially in stable isotopes, which today has a wide range for we started our activity now. let's measure and see what is the actual condition of that isotope. it is also used for that, and not only in the nuclear industry, but in other industries, especially petrochemicals, they also use such a spectrometer. they need to be able to detect this with high accuracy and instantly and you know what situation you are in. this device can also do this.
10:03 pm
the dollar of this device means, you see, if we calculate with current rates, the number is, for example, over 100 billion tomans, the price of the book, which they do not sell to us , but well, with a creative research work, our colleagues were able to, with an intensive work, that is, i say , four years on purpose, this number i say 4 years that this steady step of hope and continuous work. and
10:04 pm
hoping that with god's grace, this team will be able to work continuously for 4 years at least 12-13 days working hours and hours, in fact, the workshop and in fact the different departments that support these from the supply of raw materials to the processing and then being able to assemble the hardware and software of the database that it must have is a big job and in terms of items. the classification of items that are used in the enrichment industry is at the top of the table in terms of being strategic, which means that it is the last point of sensitivity, which was obtained by the grace of god, and we are now able to reproduce this production line for our own units. that we need to be able to take and establish in other industries we can support those who need it.
10:05 pm
we want to talk in different areas tonight and in different areas where we had nuclear achievements that were unveiled, one of the achievements that was unveiled in the past few days was a radio-data system that was used in the field of agriculture last year. different types of radiation with different capacities were unveiled, and one of them had a sub-field, which is again breaking the monopoly of our experts. a report has been prepared. let's see the report . we will deal with this issue. and or disinfecting medical equipment, these are the applications of different radiation systems that in the past years with expert efforts. nuclear industry produced, we are a producer of date pulp, most of our products have a shelf life of two to three months, with the help we got from the north west of the country, now our products are being processed, the shelf life of our products has increased to one year compared to before. irradiation of products and equipment
10:06 pm
against the radiation of the source of radioactive radiation are placed in controlled conditions and this causes changes in the properties or the destruction of pests and microbes. can be a spring that should be replaced every few years by special experts. a process that was not carried out in previous years due to sanctions in iran. basically, this is the heart of the radiation system. this means that it must be a radioactive source that will come and irradiate our food or medical equipment. but the sanctions became an opportunity for iran to provide specialized services in the nuclear industry. an opportunity to train an expert in the process of changing the source of irradiation systems. alhamdulillah, thanks to god's grace , we have the ability to go even to other countries under the supervision of the agency and load the eyes of let's do their radio active systems. the loading and recharging of tehran
10:07 pm
's gamma has the effect of reducing the time period used for irradiating aklam, which had reached 9 and a half minutes for each stage in recent days, to two and a half minutes, according to the nuclear industry development document. the establishment of 12 radiation zones in the country has been targeted to provide services to various industries. mohammad qasim kiaei of sed and sima news agency, well, we saw the report together, mr. engineer , the production of radiation systems for different products in different capacities, in addition to the replacement of springs. it was one of the achievements that we had in the last few months. it was just a few days ago, on the first day of 12th of february, you again unveiled a comprehensive system of agricultural issues in bandarbas
10:08 pm
. for which a special solution should be considered, the one that is now in this report. there was a discussion about gamma radiation with ashiya, there was a microwave oven, dear people , we are very behind on this issue, which means that this work could have started many years ago . the issue of livelihood is in fact your national economy when you irradiate the heavy waste that you produce now. well, we made this issue with special attention to bring nuclear technology into the life of people. well, we
10:09 pm
designed all the radiation generating systems that were envisioned and built them in a knowledge-based network. well, it is natural that when we do this work. this should be our continuous interactions with related organizations so that we can take this very early and make it operational. well, in this process, we needed your participation and these interactions, and we have it. at this point in time, the thing is that we can deploy these and the people of bayan and the relevant activists of bayan will start using the ministry . agriculture has a priority . the ministry of health and medical education has a priority . we have both of them, we work in parallel in the discussion of radiation, so in this situation today, in our studies, where we designed 12 poles for the country
10:10 pm
, now we can almost say the places. we have finalized and identified two of them, i think they have been opened , that's right, one or two points have been opened, yes, now in the so-called. our program is ardabil, isfahan is in the open truth is in khuzestan, in ahvaz, where the spaces have been planned and prepared. now we are working to be able to take the device and install it . in fact, it is the origin of the rumor, which is actually cobalt 60. it was very important for gamma rays that we actually made a significant investment and bought this because we have to invest in our current processes to produce cobalt 60 and it is part of our strategic plans. well, you know, when a radioactive source comes, this is the way it is
10:11 pm
, it loses its activity by itself in the place where it is kept. which we have now with super speed, almost sure, they say super sure , not necessarily fast, so that there are no delays other than avoidable delays, and we can install it cooler, start it up, and let it come into operation . this is a part that it has now. it will be done and i hope that the two or three stations we are working on now , god willing , we will be able to open at least one of them before the end of the year, and the priorities that the ministry of jihad has, which is the immediate priority of potatoes, we can do this and really for people are also a valuable and lasting service but what happened in bandar'ab is a pest called trunk-eating cockroach, which is now a pest. dakhlestan has fallen and this is progressing now, and
10:12 pm
the common pesticides and all the formulas that have not been used are effective. doing creative laboratory work, designing a system, which is a microwave radiation system, it goes around the trunk of the palm tree and the radiation it gives actually destroys the insect. and it prevents it from penetrating further and trying to destroy it, because this causes it to be destroyed and the palm groves are seriously threatened by this damage . here, you can see the result-oriented research
10:13 pm
, the kind cycle that this process is equipped with . from this device, the road to agriculture began and with the answers we receive from him , we can multiply this device and put it at the disposal of all parts of the country that are facing this pest, but there was another point that for the palm groves, it was the chain pest that was a pest in kerman province before. it was different from this plague , our colleagues worked together with plasma and they are following other solutions, so radiation and
10:14 pm
plasma, we worked on all three of them, and we hope that god willing, we will be able to do these things in this direction. with a tighter schedule, with the cooperation of zimdahl's agencies, it should come to a conclusion in these matters there is only one example of the application of the nuclear industry in agriculture, which can help, but one of the discussions and one of the fields we want is medicine. at the beginning of this year, you promised that great works are going to be done in the plasma field, and in the past few months, we have seen the opening there were two centers for the treatment of diabetic wounds using plasma technology. in this context , can you explain what our goals are for the placement of plasma? those who are caught in it face it, well, we will do this we decided to bring 50 centers
10:15 pm
by now. next year will be the fiftieth year of the establishment of the atomic energy organization . we decided to support and start 50 huge clinics, two of which were launched, one in varamin, and one in karaj. karaj is active in varamin, unfortunately. an inconsistency was encountered. it has been interrupted and stopped. we hope that we are also making preparations . negotiations have also taken place with the ministry of health. in health, the second part of the discussion of plasma therapy for therapy it is for the discussion of cancer, which
10:16 pm
is currently being used by professor akbari at the cancer research center of shahid beheshti university of medical sciences . alhamdulillah, it has had very good clinical results. there is a wound , so we will be able to comfort it, god willing, and the better , smoother and simpler our people, dear patients who are affected, can use in this process , we are making progress, and the treatments that have been given have good results so far. i thought you also prepared a report from the interview with the patients who were treated with wounds and how much they prayed and i thank god and all our colleagues that we were able to offer a service that is the result of nuclear technology in a very quick and tangible way. dear people
10:17 pm
, let's do it. we have also used plus in the areas of water purification and leachate. yes, it is true that we have collected almost every leachate in the country . our laboratory results on industrial fosabs are the same we are in the process of negotiating that these will be implemented soon, god willing, one is for one of the big cities for sewage, and one is for a large industrial town for its industrial effluent, both of which have severe environmental problems. it is dedicated to the active people of this field to express and consider this plasma part in their own process so that we can
10:18 pm
reproduce it much more easily and quickly and it is available to the people related to this activity in the country . the power plant and rector's discussion, the first stage of concrete pouring was done in isfahan yesterday let's talk about radiopharmaceuticals . let's talk briefly about radiopharmaceuticals. different radiopharmaceuticals were unveiled last year and it was aimed at meeting people's needs. we can get lutetium or copper 64 psma from copper 64, which was used in various fields, until the radio nuclide that you even unveiled, which is in the form of his research is constantly continuing, that is, even
10:19 pm
the radiopharmaceuticals that are now produced by his research to improve and increase the quality of the situation. we have on our agenda. i have already said to the dear people that on radio daru, the effort of our colleagues is to increase the accuracy of the body in the diagnostic department , and to increase the effectiveness of therapeutic drugs in the radio department. these two important components have a quantitative and qualitative goal. well, we now have 50 radio drugs, which explains one million people a year. they are using these in the diagnostic and treatment sectors in the country, and as a complementary step, the projects that were in research , now there are approximately 20 radiopharmaceuticals in the clinical phase at different stages. and
10:20 pm
we are increasing the diversity of our existing radio medicine . this is the second point. and the third point is that we bring haq until next year with the presence of the honorable president with a program that god willing we will organize the biggest radio center in darviyeh, which is unique in this region of the world , and we will open it now, and it will be a national day of panavari, not later, sooner, we will not reach that date , it will be later next year, i hope that it will be very close to the end of the year. as soon as possible, we will be able to launch this and start using this large capacity, which is 5 to 7 times the current situation, and in this way, this activity report on power
10:21 pm
plants has been prepared, one of the achievements that this thursday you went and unveiled it . let's see the report. we will return to the topics together we have another question to ask mr. engineer about the construction of iran's hormuz nuclear power plant in sirik. it started with the order of the president through video conference and with the presence of the head of the country's atomic energy organization. by the order of mr. president, today we started the operational operation of the site of iran's hormuz nuclear power plant, which consists of four 1250 mw power plants. head of the atomic energy organization of the country. he said: this power plant is one of the mega-projects of national development, which
10:22 pm
will be built in the high power class of 1200 megawatts in an area of ​​500 hectares. eslami said that the reactors of this power plant produce electricity of the pw type, or water the style is under pressure, which is a new generation power plant with a very high level of safety. this program is one of the defined programs emphasized by the supreme leader. in the organization development document in the horizon of 1420, which is a program that we must reach this capacity by 1420, a part of 20 thousand megabytes of this program , god willing, according to the adjustments and coordinations that have been made, can be implemented according to its schedule. according to islami, all stages of design, construction and commissioning of iran's fourth nuclear power plant by it is implemented by domestic specialists of the country. we saw the report together. mr. engineer regarding this power plant can you explain? i think
10:23 pm
it is from the big power plant. it's true? yes, you see, we emphasized the issue of 20,000 megawatts for the first time in november 2006 by the oppressed leadership. they often pay attention to the discussion . alternative energies of fusidic fuels were emphasized. we would create a mechanism for this. well, first of all, we addressed this issue in the strategic document and targeted this 20,000 megawatts, with a gap in revising the number of 20,000 megawatts. so, this task is the next program in the budget law. we saw it in note 15, which now becomes note seven and in 1403 the continuation of the supreme energy council with the presence
10:24 pm
of mr. president, there is a resolution in paragraph 16, which is emphasized and assigned to the atomic energy organization for 20,000 megawatts. lands have been identified and the operations of these 20,000 megawatt projects , each in one stage, is a normal international power plant activity, there are 5 events . the second event is the beginning of the concrete pouring operation, which is called the first concrete. the second event is actually a process
10:25 pm
the equipment is installed and refueled , which becomes the third and fourth, in fact, criticalization and the start of electricity production and network feeding. electricity and the event will be the fifth. in fact , after 60-70 years, for example, the power plant will be decommissioned. we are now in iran, hormoz, which is sirik . we were in the first event for these four reactors. deep speculations must be made. geotechnical studies, studies of environmental conditions based on the detailed characteristics of the area. the implementation of the design of the buildings there, especially the reactor , with its calculation mechanism and safety requirements
10:26 pm
the governors are able to adapt, so we are at this stage for iran, hormuz , and mokran. we left it behind and, god willing , we will start the second event in june. therefore, this is the process where the places are identified, the companies are established, the systems are selected, and the movement and activities will go through these five stages one after the other, god willing, according to the schedule of the nuclear power plant. bushehr 2 s is also going forward, 2 and 3 are fully active, our unit 1 is going forward , which creates some confusion in the circuit .
10:27 pm
atami, you still don't even have a power plant . atomic power plant number one has completed its tenth year of operation and has injected 62 billion kilowatt hours of electricity into the grid, a stable and high-quality electricity that supports the electricity grid in the south of the country with a constant frequency of 50 hz. the second and third units are fully active , and the most important thing about this power plant reopening is that our unit number 2 in the reactor building is currently the construction is progressing , they are currently pouring concrete on the upper level, but the third unit , god willing , we will have the second event in the coming weeks, when the first concreting will begin, which means that these are progressing in a chain. i don't think i should
10:28 pm
get rid of it well. one point that we should pay attention to is that in addition to completing the process of building the power plants that you said are being built, we are training the human resources that are going to work there . it has been a few months since you you unveiled a power plant management simulator and you are training naqba specialist human resources in the field of training. can you also explain the human resources? very important question. see, our current organization will be at least 5 times larger. in this program horizon. therefore, we urgently need to develop our own human resources. let's prepare. because, especially in power plant projects , manpower has not received specialized training.
10:29 pm
in a power plant. if he doesn't have an internship, he can't get the qualification to come and work as a slave in the nuclear power plant. this job itself has been working for at least 4 years. therefore, in the first step , dear people , you have seen the international research training center in isfahan with the capacity we have. we have 3 research reactors in isfahan , which are research reactors and a center, in fact , with the capacity of a midwife, we gave this center the mission to become a center for training nuclear science and technology skills, and this center should play a role, with the participation of the organization's family companies and the scientific educational centers of our country, to train the industry's human resources. let's do a core in this process, this is the first step, and next to that, planning for recruitment
10:30 pm
niroh, which is now considering the activities that we have to coordinate through legal channels and follow the so-called recruitment and at the same time we can give scholarships, which we will give scholarships this year in the entrance examination book after 10 universities in 10 fields. we announced the scholarship for the bachelor's degree in the offices of 500 people for the bachelor's exam, maybe we planned ahead of time, the more important thing is that we are a famous atomic energy high school, which means that many of the olympiad and elite children are graduates of the atomic energy high school. we expanded our schools from in the 13th government, we went from 7 schools to 13 schools and now to 21 schools

11 Views

info Stream Only

Uploaded by TV Archive on