Skip to main content

tv   RIK Rossiya 24  RUSSIA24  April 30, 2024 8:30am-9:01am MSK

8:30 am
i understood correctly, the future, yes, yeah, twenty-four, 2124, this is the situation, now i can jump to a century in the future and back, i see everything, space pirates are hunting for us, they were already there when i came here, we need find mom. what a meeting, maybe we can put the children to bed and now is the time to somehow fix everything and it’s time to act somehow, questions, suggestions, objections, give other things you want, 100 years in the future.
8:31 am
now footage from peru in the north of the country a bus fell from a two-hundred-meter cliff into the river. it is known that at least twenty-five people were killed, another 13 people were injured, how many passengers were in the vehicle is still unknown, the bus is designed for 50 people in total, here is a video, now i’ll show you roughly so you can understand from which cliff it collapsed, here is this footage, local police claim that the victims could have been carried away by the current, rescue work is currently underway at the scene of the accident.
8:32 am
a new inpatient department of the ophthalmological hospital was opened in yakutia, it is equipped with the most modern equipment, with during the construction, every little detail was taken into account for patients and staff, creating the most comfortable conditions, the hospital also received a new mobile medical complex, which means doctors will be able to provide assistance to those who cannot get to yakutsk. vitaly prokopyev has the details: more people will be able to see the world in all its colors.
8:33 am
great working conditions, even the sinks here are sensory, firstly, that is, the water comes from straining the hands and an apron that covers it from splashing, this happens according to all the rules of sanpin. also yakut the ophthalmology hospital received another mobile medical complex so that doctors could restore vision to those who cannot get to the city on their own. this mobile ophthalmological complex will very soon set off on its first voyages inside. it is equipped with the latest
8:34 am
technology so that doctors can not only diagnose, but also treat patients; very soon residents of central yakutia will be able to receive the necessary medical care. such as carrying out laser operations, such experience already exists, since 2022 yakut ophthalmologists helped hundreds of residents of remote villages with cataracts and glaucoma. we have received mobile complexity or new advanced equipment for our department. and retraining of our personnel is open.
8:35 am
the national project for tourism and hospitality industry is designed to help develop infrastructure for traveling around russia. irina matyushenko will tell you in the program how exactly and how they are going to attract business. instructions immediately after the advertisement. a credit card is beneficial in any situation. interest-free period 120 days starts every month, and service notifications are free forever. that is why the credit card is the best in the country. apply for a credit card, everything will be the way you want. there are classics that i like more and more every time, classic burgers grant and novelty, grand picant with spicy tomato sauce, which i really want
8:36 am
to repeat, the classics are already waiting, it’s delicious, full stop, selfish, that means it’s already giving me heartburn, it’s burning, we will. extinguish, but i get heartburn from your food, this is easier, heartburn from food, take it extinguishes, fight heartburn pain and heaviness with increased acidity in the stomach, active from the first minutes, extinguishes the zhobu extinguishes, happy birthday, only on the birthday of the megamarket, new balance sneakers with discounts of up to 50%, feel free to look your expenses in the eye, with yota - we return rubles for leftovers minutes and gigs, every month, you can! water where you need it! unipamp - pumping
8:37 am
equipment! start the path to your dream with sber. open a free business account and join the elberbusiness loyalty program, thank you! get it! cashback 10% bonuses for purchases with a sberbusiness card and bonuses for account transactions. sberbusiness. touch the rock star of burger king. water tastes better when cooked on fire. magnet. curd dessert epica flavorite 499. magnet - the price is what you need. this is a corporate event. from a hangover enterum. a new generation enterasorbent removes toxins while preserving beneficial substances. a smart solution against poisoning. what do we bring back from
8:38 am
savito’s travels? a little sea, delicious traditions. monthly cashback 2% rate, more profitable than sber prime! pairs of grand and grand picant at an attractive price, only tasty and dot. holidays in russia are gaining popularity.
8:39 am
traveling around the country is becoming more accessible, more comfortable and safer, thanks to the national project. tourism and hospitality industry, what support a business can receive from the state under this national project, we will tell you in 5 minutes in the program instructions. tourism and the hospitality industry is primarily the development of tourism infrastructure. with the support of the national project, new resorts are being developed, hotels and sanatoriums are being built and renovated, glamping and camping sites are appearing, and of course, business is actively involved in all this, and the state creates favorable conditions for it. tourism corporation of the russian federation'. implements more than 100 investment projects to create tourism infrastructure throughout our country, from the kaliningrad region to the far east and kamchatka. the total investment portfolio exceeds 500 billion rubles. today we suggest that businesses use government support measures. help with financing is one of the most important
8:40 am
points. entrepreneurs across the country can receive preferential loans for construction or reconstruction of tourist facilities. these are multifunctional hotel complexes, water parks and amusement parks. infrastructure for ski resorts, sanatoriums, hotels. the category of the hotel or inn must be at least three stars. room stock from 120 rooms, both for hotels and for... many functional complexes, preferential loans are issued for a period of up to 12 years, at an interest rate of 30% of the current key rate of the bank of russia plus 3%. in current conditions, the interest rate will be 7.8% per annum. this allows us to almost double the return on investment in each investment project related to the development of tourism infrastructure. please note that the project must be highly developed. that is, land documents have been drawn up and a business plan has been developed. if you have everything ready, you can contact an
8:41 am
authorized bank. they evaluate the reliability and financial stability of borrowers. if the bank is ready to approve the loan, it transmits the information to government agencies. the final decision is made government tourism commission. funds can not only be borrowed from a bank. the state may provide additional subsidies, for example, for the construction of modular hotels. which? here is the mechanism: the business must invest at least 50% of the project cost, then the rest of the amount will be invested by the state, while for one room in a modular hotel state aid will amount to no more than one and a half million rubles. preference will be given to projects based on already operating hotels with at least fifty rooms. high chances of subsidy in special economic zones of tourist and recreational type. what needs to be done to get it for... first contact the local administration to find out all the conditions, then develop a project for the future hotel,
8:42 am
indicate where it will be located and other characteristics, and of course, how much it is planned to invest in construction and what subsidy is needed. then you need to draw up an estimate taking into account force majeure, and finally submit an application and a package of documents. if the project has already been implemented and you want to compensate part of the costs, you will need documents about the finances invested in construction. each region has its own. application deadlines and additional criteria. you can also receive a regional subsidy for the development of your project. funds can be allocated for the development of the beach and laying out the route, for the purchase of equipment and for holding events that increase the tourist attractiveness of the region. to create a tourist code for the city, to build modular accommodation facilities and berths. to receive a subsidy, you need to contact the local administration, they will tell you how to apply application. another significant support measure is public-private partnership. business
8:43 am
invests its own funds in tourism infrastructure projects, and the state invests its own. the investor from the state is the russian federation tourism corporation. in addition to material support, the russian tourism corporation will help in reducing administrative barriers, marketing the project, attracting additional investments, interacting with government agencies and much more. if you want to. to cooperate with the corporation, first you should register on the online platform for investors, fill out an investment questionnaire, after assessing it, you can sign an agreement of intent to jointly develop a master plan and implement the project. today, any entrepreneur can go to the information portal turism of the russian federation, get acquainted with existing investment lots and finance the development of tourism infrastructure, or leave a request for support of their own project. the corporation's experts promptly contact the person who left a request to help with forming a questionnaire, preparing the necessary documentation and applications for
8:44 am
additional funding, if necessary. let us repeat the most important thing: under the national project for tourism and the hospitality industry, businesses can receive financial support: these are preferential loans for the construction or reconstruction of tourist facilities, as well as subsidies for the creation of prefabricated modular accommodation facilities for their own projects in the field of tourism. in addition, a business can attract co-financing from the tourism of the russian federation within the framework of public-private partnership. if you have any questions, if you want to know more about business support measures in the country’s priority areas, ask in our telegram channel. we will talk to the authorized agencies and will tell you everything in the next issue of the instructions. the production of the so -called fuel of the future has been launched in the tomsk region. new technologies make it possible to obtain virtually endless energy on site, which... will become part of a unique breakthrough project, natalya solovyova visited, her special
8:45 am
report, watch immediately after the advertisement. start the path to your dream with sber, open a free account for business and connect to the sberbusiness loyalty program, thank you, receive 10% cashback bonuses for purchases with a sberbusiness card and bonuses for account transactions. sberbusiness.
8:46 am
is available every month, and service and notifications are free forever, that’s why the credit savings card is the best in the country, get a credit card, everything will be the way you want, touch the rock
8:47 am
star burger king, vatter! it tastes better on fire! experts choose rosneft magnum oil. increased magnum oil, oil consumption is one third less. 83% of buyers choose it again, it reduces the formation of deposits by 20%. rosneft magnum motor oil, we are sure you will buy it again. with yota, your money will not fly away. we return rubles for the remaining minutes and gigs, if possible. happy birthday megamarket you give joy to everyone only on the birthday of the megamarket pet food with discounts of up to 50%. to order household goods, use jandex go, and if you need a courier, also jandex go. jandex go, all deliveries in one application. magnet, chwechchimirotork,
8:48 am
1599. magnet. the price is right. at bikfest , four nuggets for 39 rubles. and other offers at a very competitive price. sber is introducing a loan with 2% cashback to give you even more opportunities. opportunities to get everything you have long dreamed of without delay. opportunities to please those who may be difficult to please at first. opportunities to gain new experiences. a flurry of new things. impressions, a storm of new impressions, get a loan from sberbank and receive a monthly cashback of 2% interest rate, more profitable with sber prime.
8:49 am
russia is entering a new era of nuclear energy; a line for the production of innovative fuel for fast neutron reactors was launched in seversk, thus our country is becoming one step closer to virtually endless energy production. geometry, weight, proportions, accuracy, like in a pharmacy, but these tablets do not have a medical purpose. this is what future nuclear fuel will look like. line.
8:50 am
level of automation to eliminate human labor and generally contact with nuclear material. a unique installation is needed to prepare the same innovative fuel, which in turn will be loaded into the world’s only fourth-generation nuclear reactor, brest, which is being built here just a few hundred meters away. a fuel production plant, another for reprocessing spent fuel, and of course, the entire installation itself. together there is the “breakthrough” project, ambitious in its design and large-scale in its execution. this is what it will look like very soon, one site - 30 buildings and structures. brest will work mixtures of uranium and plutonium nitrides, and the first component for this fuel has already been delivered. to get a fuel pellet like this,
8:51 am
its elements must go through several stages. i have aluminum oxide in my hands; the technology itself was developed on it. there is now uranium nitrite, but the principle is the same, all elements along the line must go from the stage of reduction and granulation to baking. to avoid loading the main line. development of all processes with combined uranium is carried out at the technological support site, essentially a mini-copy of the plant, for this purpose additional protection, let me put it on too, so that i can help you just in case, it’s a little exciting, don’t worry, everything is fine, everything will be wiped clean. i’ve never held uranium in my hands before, well, yes, not every person has such an opportunity, inside the box there is an inert gas environment , contact is the only way in double gloves, some of which are rubber, we are preparing local plutonium, but there is no plutonium yet, otherwise we wouldn’t be standing here, well, you definitely wouldn’t be standing here, our
8:52 am
film crew are the first journalists who literally touch to a unique developed by russian nuclear scientists, this is not yet the fuel of the future, but a significant component of it, this is, of course, about yes, which is loaded into the pellet. that is, we are one step closer to that same closed cycle? of course, every time we move forward. this breakthrough will be the first complex in the history of mankind with a closed nuclear fuel cycle. simply put, the facility in seversk is a real factory for waste-free and endless energy production. very soon a pilot demonstration energy complex will begin its work with brest-300 reactor. it will lay the foundation for an energy system that will ensure economic efficiency, natural safety, minimization of radioactive waste, and unlimited fuel reserves,
8:53 am
thus providing an answer to all the challenges that the energy sector of the future poses to humanity. to understand why the breakthrough project is revolutionary, it is enough to understand once what a closed nuclear fuel cycle is, and how it differs from... a traditional, open one, almost every reactor on the planet is thermal and operates on the uranium-235 isotope, approximately once every 5 years the fuel elements are changed, and the spent nuclear fuel is sent to a special storage facility, this is an open nuclear fuel cycle, a breakthrough does what previously seemed impossible, the fuel is sent to a fast neutron power unit, and the spent fuel after processing into... it returns back to the reactor and so on in a circle, the brest installation supplies itself with raw materials. this is a technological task that
8:54 am
no one in the world has ever taken on. russia, as the leader of the industry, has the privilege of becoming a pioneer, every step of which is monitored by the entire expert atomic community. i ask the operator to report on the readiness of the launch systems. regular interactive atmosphere . that's why the line is being tested. i remember very well the words you said then. you said that this project , without any exaggeration, will be watched by the whole world. we ask our colleagues to begin work on the first
8:55 am
facility, the breakthrough project. the event is historic, because ultimately, the success of russia will determine how nuclear technologies will further develop in those states that they already have them, and those who are just about to join the world atomic pool. that this is the energy of the future, despite all the advantages of nuclear energy, there are two drawbacks that have so far prevented, perhaps, even more large-scale implementation of it, these are , first of all, the management of spent fuel and the solution of problems of limiting the resource base, that’s both the problem allows us to solve the technology that is being created here on the site, so the work that is going on here is closely monitored not only in russian federation, but throughout the world. the breakthrough turns things around. the traditional idea of ​​green energy puts the atom on a par with renewable resources, the sun, wind, and tides. today, all nuclear power plants in the world
8:56 am
consume 70,000 annually. the end of this century, as for our breakthrough and in general with the use of a closed fuel cycle, in which the fuel has worked, undergoes processing, begins to work again, about 90% of this energy potential is unused , here for thousands of years there is enough fuel, today achieving these strategic goals means colossal
8:57 am
work, which is called: and the key role in this work is played by seversk and the siberian chemical plant, which simultaneously celebrate their 705th anniversary. the plant became the first nuclear industry enterprise in siberia; it was created during the cold war, like the entire nuclear industry of that era, for defense purposes. its sovereignty laid the foundations for the peaceful use of nuclear technology, and the plant played a leading role in this. the reactor installation has
8:58 am
impressive dimensions, so from... to tomsk. the design of the brest-300 itself is special, compact and safe. lead was chosen as a coolant for the first time. thanks to the use of lead coolant, which does not interact with water upon contact. it is possible to use this particular arrangement, that is, install into the reactor vessel all the equipment that is installed outside on other reactors. these are steam generators, mainly
8:59 am
circulation pumps, that is, the whole thing. the first circuit of this reactor is installed inside reactor vessel, we have the first circuit, it is located in diameter 26 m. brest-300 will close the entire system, which will require only minimal additional replenishment with resources. science and practice have been moving toward this historical turning point for 60 years; the technology is already in demand; the president has set the task of increasing the share of nuclear generation in the overall energy balance. from 20 to 25%, this must be done by 2040, which means that plans for large-scale construction of new power units, what they will be, are being decided here now. physical launch the brest-300 reactor is expected in 2 years, by which time the fabrication module will have passed all stages of debugging and will begin to operate at an industrial pace, the first closed-cycle energy complex will appear in russia.
9:00 am
in the belgogorod region, the russian military destroyed an important facility in iisu. the fighters destroyed the positions where the ukrainian attack drone operators were located. thus, it was possible to protect civilians from new air attacks. the bmp crew successfully completed the task. igor pikhanov with details. the crew of the bmp-3 is moving forward for combat work. scouts
9:01 am
found near the belgorod border. region, there are fortified positions of the ukrainian military, crews of enemy fpv drones are located there, and our fighters have been hunting for them for several days. they are afraid to cross the border, they try everything with drones. attack us with drones.

24 Views

info Stream Only

Uploaded by TV Archive on