Skip to main content

tv   San Francisco Cable Car  SFGTV  November 11, 2023 3:35pm-4:01pm PST

3:35 pm
>> >> >> >> >> my name is bal. born and
3:36 pm
raised in san francisco. cable car equipment, technically i'm a transit operator of 135 and work at the cable car (indiscernible) and been here for 22 years now. i grew up around here when i was a little can i. my mom used to hang in china town with her friends and i would get bored and they would shove me out of the door, go play and find something to do. i ended up wandering down here when i was a kid and found these things. ♪ [ music ] ♪ ♪ >> fascinated by them and i wanted to be a cable car equipment from the time i was a little kid. i started with the
3:37 pm
emergency at the end of 1988 and drove a bus for a year and a half and i got lucky with my timing and got here at cable car and at that time, it really took about an average five to maybe seven years on a bus before you could build up your seniority to come over here. basically, this is the 1890s verse ever a bus. this is your basic public transportation and at the time at its height, 1893, there were 20 different routes ask this powerhouse, there -- and this powerhouse, there were 15 of them through out the entire city. >> i work at the cable car division and bunch with muni for 25 years and working with cable cars for 23 years. this is called the bar because these things are horses and work hard so they have to have a place to sleep at night. joking. this is called a barn because everything takes place here and the powerhouse is -- that's
3:38 pm
downstairs so that's the heart and soul of the system and this is where the cable cars sleep or sleep at night so you can put a title there saying the barn. since 1873 and back in the day it was driven by a team and now it's electric but it has a good function as being called the barn. yeah. >> i am the superintendent of cable car vehicle maintenance. and we are on the first and a half floor of the cable car barn where you can see the cables are moving at nine and a half miles an hour and that's causing the little extra noise we're hearing now. we have 28 power cars and 12 california cars for a total of 40 revenue cars. then with have two in storage. there's four gear boxes. it's gears of
3:39 pm
the motor. they weigh close to 20 tons and they had to do a special system to get them out of here because when they put them in here, the barn was opened up. we did the whole barn that year so it's difficult for a first of time project, we changed it one at a time and now they are all brand-new. engineer's room have the four monitors that play the speed and she monitors them and in case of an emergency, she can shutdown all four cars if she needs to. that sound you heard there, that's a gentleman building, rebuilding a cable. the cable weighs four hundred pounds each and they lost three days before we have to rebuild them. the cable car grips, the bottom point is underground with the cable. it's a giant buy strip and closes around the kab and they pull it back. the cable car weighs 2,500 people without people so it's heavy, emergency
3:40 pm
pulling it offer the hill. if it comes offer the hill, it could be one wire but if it unravels, it turns into a ball and they cannot let go of it because it opens that wide and it's a billion pushing the grip which is pushing the whole cable car and there's no way to let go so they have to have the code 900 to shutdown in emergencies and the wood brakes last two days and wear out. a lot of maintenance. ♪ [ music ] ♪ ♪
3:41 pm
>> rail was considered to be the old thing. rubber tires, cars, buses, that's new. there were definitely faster and cheaper, there's no question about that. here at san francisco, we went through the same thing. the mayor decided we don't need cable cars (indiscernible), blah, blah. we can replace them with buses. they are faster and cheaper and more economical and he was right if you look at the dollars and cents part. he was right. >> back in 1947 when they voted that, i'm surprised base of the technology and the chronicle paper says cable cars out. that was the headline. that was the demise of the cable cars. >> (indiscernible) came along and said, stop. no. no, no, no. she was the first one to say we're going to fight city hall. she got her friends together and
3:42 pm
they started from a group called the save the cable car community, 1947 and managed to get it on the ballot. are we going to keep the cable cars or not? head turned nationwide and worldwide and city hall was completely unprepared for the amount of backlash they got. this is just a bunch -- the city came out and said basically, 3-1, if i'm not mistaken, we want our cars and phil and her group managed to save what we have. and literately if it wasn't for them, there would be no cable cars. people saw something back then that we see today that you can't get rid of a beautiful and it wasn't a historical monument at the time and now it is, and it was part of san francisco. yeah, we had freight back then. we don't have that anymore. this is the number one tourist attraction in san francisco. it's historic and the only national moving monument in the world. >> the city of san francisco did
3:43 pm
keep the cable car so it's a fascinating feel of having something that is so historic going up and down these hills of san francisco. and obviously, everyone knows san francisco is famous for their hills. [laughter] and who would know and who would guess that they were trying to get rid of it, which i guess was a crazy idea at the time because they felt automobiles were taking the place of the cable cars and getting rid of the cable car was the best thing for the city and county of san francisco, but thank god it didn't. >> how soon has the city changed? the diverse of cable cars -- when i first came to cable car, sandy barn was the first cable car. we have three or four being a grip person. fwriping cable cars is the most toughest and challenging job in the entire city.
3:44 pm
>> i want to thank our women who operate our cable cars because they are a crucial space of the city to the world. we have wonderful women -- come on forward, yes. [cheers and applause] these ladies, these ladies, this is what it's about. continuing to empower women. >> my name is willa johnson is and i've been at cable car for 13 years. i came to san francisco when i was five years old. and that is the first time i rode a cable car and i went to see a christmas tree and we rode the cable car with the christmas worker and that was the first time i rode the cable car and didn't ride again until i worked here. i was in the medical field for a while and i wanted a change. some people don't do that but i started with the mta of september of 1999 and came
3:45 pm
over to cable car in 2008. it was a general sign up and that's when you can go to different divisions and i signed up as a conductor and came over here and been here since. there were a few ladies that were over at woods that wanted to come over here and we had decided we wanted to leave woods and come to a different division and cable car was it. i do know there has been only four women that work the cable car in the 150 years and i am the second person to represent the cable car and i also know that during the 19, i think 60s and women were not even allowed to ride on the side of a cable car so it's exciting to know you can go from
3:46 pm
not riding on the side board of a cable car to actually grip and driving the cable car and it opened the door for a lot of people to have the opportunity to do what they inspire to do. >> i have some people say i wouldn't make it as a conductor at woods and i came and made it as i conductor and the best thing i did was to come to this division. it's a good division. and i like ripping cable cars. i do. >> i think she just tapped into the general feeling that san francisco tend to have of, this is ours, it's special, it's unique. economically and you know, a rationale sense, does it make sense? not really. but from here, if you think from here, no, we don't need this but if you think from here, yeah.
3:47 pm
and it turns out she was right. so.... and i'm grateful to her. very grateful. [laughter] >> three, two, one. [multiple voices] [cheers and applause] >> did i -- i did that on purpose so i wouldn't. ♪ [ music ] ♪ >> you are watching san francisco rising.
3:48 pm
today's special guest is jeff tomlin. >> hi. you are watching san francisco rising. to show that is focused on restarting, rebuilding, and reimagining our city. our guest today is the director transportation of the sfmta and he's with us to talk about the agency's 23-24 budget with the muni equity strategy and new projects across the city. welcome to the show. >> thank you it is good to be here. >> i see the sfmta's budget for 2023 and 2024 has been approved. how will it help provide a strong recovery during the next few years for our riders, operators and staff? >> it has been a challenging couple of years. covid wiped out the basic finances. our agency is funded primarily from transit fares, parking fees and a fixed set aside for a general fund and covid has meant
3:49 pm
we have lost more than half of our parking and transit for revenue. we are not expected to recover them until 2027. this budget takes a one-time federal release funding and spreads that out between now and 2025. and our task is to rebuild trust with the voters that sfmta can actually deliver on their goals and that includes things like making muni faster, more frequent, and more reliable. includes making our streets safer and making everyone feel safe riding the bus. it means taking advantage of the amount of change we're going to experience in order to advance equity so that we invents -- invest the most amount of money in communities that need our services the most. it also means supporting san francisco in its larger economic recovery.
3:50 pm
basically two years between now and 2024 in order to build trust with the voters and figure out how are we going to find muni moving forward because it is in 2024 and 2025 when the one-time federal release fund went out. >> are you planning on starting up? >> as a result of covid, we have 1,000 vacancies in the organization. that is why muni service is not fully recovered. this budget allows us to fully staff through 2024, which means we can restore muni service, invest in safety, and invest in other programs in order to make the transportation system work better for everyone. >> can you talk about the mooney service equity strategies? as you move out of the pandemic, how has that plan been updated? i have heard there are elevator upgrades in progress. >> we have been working a lot on equity during muni's recovery. we have been basing our work on
3:51 pm
the muni equity strategy. this is the plan we update every two years that looks at the changing demographics of san francisco and helps us direct our transit resources where people need it the most. that means people with low income, people of color, seniors, people with disability, children, all the folks who have the fewest choices. during covid, when we had to strip back the transit system, 13 quarters of the workforce were in quarantine, we directed all of the agency's resources to the equity neighborhoods. places like the bayview, chinatown, the mission, the valley, and even through our recovery, we have continued to deliver the best muni service's so -- to the neighborhoods that need it the most. right now we are still operating more frequent service in core
3:52 pm
lines in equity neighborhoods than we did precovid. and the result of that is extraordinarily high ridership. we are finding, for example, by investing in the frequency and reliability on lines like the 22 fillmore, that we are getting 133% of precovid ridership, even when the overall system is only at about half of the ridership recovery. that is 133%. that is on weekends. we are at about 96% of precovid ridership on our main equity lines on weekdays. we're also investing a whole variety of infrastructure projects aimed at making transit work better, particularly for people with disabilities. on the market street corridor, our elevators to the subway station date back to the 1970s and need significant renovation. right now we are busy working on renovating the elevators at the station. we have completed the elevator upgrade for the eastbound
3:53 pm
platform. we are now working on the westbound platform. that will modernize the elevators and make them a lot more reliable, and make sure that we can continue to prioritize people with the fewest mobility choices. >> that's great. changing topics slightly, i understand the improvement project is halfway completed. have shared spaces made the product -- project more complicated? >> yes. lots of things have made the terminal project more complicated, including things like covid and supply chain issues. we learned a lot on the first phase of the terra vale project, which rebuilt the street from sunset boulevard to the zoo, including rebuilding all the infrastructure of the streets, the underground utilities, to modernize all that infrastructure and make it more resilient, and make sure that we do not have to rebuild the street, hopefully in any of our lifetimes. we also learned about the
3:54 pm
importance of collaborating, particularly with neighborhood businesses and residents. we want to make sure that we are constructing the city's infrastructure in a time that the city is suffering and we are not adding to suffering. we're doing things like partnering with the mayor's office of economic workforce development to support neighborhood businesses through programming during this time. we are also making sure that businesses that create shared spaces in the parking lane, some of those need to be moved out of the way while the utility work is done underneath them. we are making sure that we will either move those platforms and outdoor eating areas back as they were, or help local merchants rebuild them so that we are not adding to the burden of local businesses and that we help everyone recover in this challenging time. >> quite right. finally, many of the sfmta vision zero quick build projects have been well received. can you talk about the evans
3:55 pm
street project? >> one of the things we did during covid was dramatically expand the rate of what we call quick build projects, which are fast-moving projects using simple and cheap materials in order to redesign streets and test out new ideas and see how they work, as well as get a lot of feedback from community before moving into a larger capital project that converts all of that plastic stuff into concrete and trees and, you know, curb extensions. what we have been finding is that our quick build safety projects are able to cut severe injury and fatalities between 25 and 75%, depending upon the location on the techniques that we use. so we are targeting streets that have the highest rate of traffic crashes, particularly injury
3:56 pm
crashes and fatalities. we focused on evans, which is really important connector for all modes of transportation between the bayview and the central neighborhoods of san francisco. also a street with a terrible track record of severe crashes. on evans, what we are doing, again using paint and plastic posts for the time being, is taking the lanes that are out there right now, and converting them to one lane in each direction plus turn pockets. what we found on streets like valencia or south bend this, or -- south van nass, is a street with one lane in each direction plus a term pocket can move just as much traffic as a street with two lanes in each direction. left turning vehicles mean the
3:57 pm
two lanes of traffic are never really available for through traffic. these road diets that we do have been tremendously effective for improving safety outcomes for all road users, without exacerbating traffic. they do make all cars slow down to the speed of the most prudent driver. this week we are getting started in partnership with the department of public works on work to restripe all of evans between third and cesar chavez, and as part of this work will be collecting a lot of data, talking to industrial users in the industrial district and talking to folks in the bayview commercial district and in the mission about how it is working. we will make some adjustments along the way and if it is successful, then we will start another project that is more capital-intensive to make it permanent. if it is not successful, we will turn it back the way that it was, having spent very little money. >> thank you so much. i really appreciate you coming on the show. thank you for the time you have given us today. >> it has been great being here.
3:58 pm
thank you so much. >> that is it for this episode. we will be back shortly. you have been watching san francisco rising. thank you for watching. [♪♪♪]
3:59 pm
4:00 pm
>> the meeting is being recorded. president heldfond, you may begin the retirement board meeting of november 8, 2023 at this time. >> thank you. madam-would you call the roll recollect , please? [roll call] >> commissioner safai is on his way. >> thank