npp reaches payback, as well as tax and social payments. main feature construction - three other powerparallel with the first, no one in the world is doing this now. all buildings, structures and systems are being commissioned gradually as planned. in the second block we are preparing for the installation of the main technological equipment, a steam generator, circulation pumps and are preparing for the important event of the start of welding of the main circulation pipeline, in the third block we are constructing the reactor shaft, in the fourth power units we have completed concreting the foundation slabs, the first tier of the air intake has been installed, the first large-sized equipment of the reactor hall , a melt trap, in the reactor building the first power units are already... all the main equipment - pore generators, main circulation pumps and the main circulation pipeline, which like an artery connects the nuclear reactor with the main systems, almost everything is ready in the turbine room. the installation of turbine equipment is currently underway; it is necessary to asse