there is a solution for the coolers that are currently installed inside the pashtovans, that we can use bial dc tesm khor motors . millions of cubic meters of water have flowed towards urmia lake. god bless the water of the hundred silos on the way to urmia lake. after 6 hours, the released water traveled a distance of 36 kilometers and reached the outlet of the canisib tunnel, hoping to revive it. how long will the release of water continue? it is red that we have to take into account the supply of drinking water to the people. it is a right that is related to the agricultural sector and is legally the right of the people of the region. well , it depends on the climatic conditions and rainfall, the amount of snow and rain, besides these , the badin abad canal is 4 half a kilometer of excess water in the area is going to be transferred to the canisib tunnel tick almost 50% of this project has been completed, more than 2 kilometers of canals have been completely completed, the discussion of acquisition and excavation operations has also been done. now, with the completion of the second phase