specialists will install a light-colored installation on bolshaya suchasnaya with the extraction of energy-savings, as soon as they are installed. so, ya chakae acrylic pakrytstso. these types of work are carried out at night, when trains are not running, when the contact real stress is removed, that is, they are being built a fairly tall structure, about eight or about 10 m, so our specialists are engaged in this work, for this they need to assemble the structure, carry out the work, disassemble the structure, remove the station itself, the platform later. and more like 30 stanzas. neastyarozhny maneuver mozha stats prychynay darozhna-transpartnaga zdarennya. let us remind you about the rules for changing pedestrian crossings . take care of pedestrians during these days under strict control. if you don’t let us bother you about zebras, vajitselyam it is necessary to relax the hutkast in tym. always make sure that your maneuver is safe, and when entering the roadway, and of course, never cross the roadway outside designated areas, be extremely careful when passing pedestrian crossings, give prior