the capital has completed its life and is proud of the park named after ugachavesa, which is in the frundzinskyst, we have stretched out the dance floors for extreme sports, the bike track, the healthy pump, the same dance with harnesses, hand walks and bars. the current greening system for laying the lawn has been installed for tabletop walks and picnics. at this point, the laying of paving slabs has been completed. pedestrian connections are being established, plus they are already being cleaned up, the seams are swept up, the area for the finale is cleaned up , so to speak, so that it looks beautiful, a lot has also been installed, almost everything, well, maybe 95% of the mafs such as flower beds, urns, benches, benches with a canopy, construction and installation work was completed on the order of 95-97 %, we see that the work on laying tiles for landscaping is now being completed. territory, which means that the project provides for eight attractions, this is in the summer; in the winter, two more slides for juping and a roller ski track are planned here. urachysta we are opening a new zo