transit highway m10, border of the russian federation, gomel-cobra.housand vehicles here, and rigging equipment, timber trucks , dry loads, yashche in listapadze minulaga of the year 6 kilometers at the end of two fell the park of gomel and rechytsai closed on major repairs and repairs were carried out, and a complex of maintenance works was carried out, it is clear that the asphalt pavers are empty, and during the summer , the road workers are working in an ideal area. u we have belarusian standards, we are striving for this, we are working, planning to implement it... our plans for the near future will be the future of the right of way at the gomel jump and on the m10 highway between petryka and zhytkavitsk districts. natalia ignatsenka, alexander murashkin, gomel region. like the road of the ward after winter and steel. during the current phase, seasonal repairs are carried out. assembling assistance to frame streets and highways with active traffic. pits and potholes are eliminated from this installation. minsk, water is unsafe from the undergroun