dad and three wells in the plains of harmak hamun. collection lines of these wells, which were about 95 kilometers long, and the transmission lines were implemented, and we built a 100,000 cubic meter desalination plant in dashtak region. also, today in sistan baluchistan province, there are three large gas supply projects with a credit amounting to 25,000. a billion tomans was put into operation. the discussion of transferring the gas line of the national network, which was 290 km long from iran shahr to chabahar, was a 56-inch line, which was put into operation today. the third project of the pipeline project in the truth is that the entire project is 187 km from sarbisheh to nah banddan, which is almost completed, but the first phase of 80 km was injected today , god willing. at the end of july, this pipeline will be completed and our pipeline will be completed in the eastern region of the country, that is , my sistan baluchistan province will be connected to south khorasan, by supplying gas to 9 cities and 130 villages, 70,000 hou