about the start of work - a report by irina vodina.s behind us, a giant drilling rig we've been collecting and testing for over a month, there's a long way ahead. vladimir will have to build a one and a half kilometer tunnel. i'm starting. with the press of a button, all mechanisms are activated. dear passengers, the tunnels prokhodchevsky shield vladimir departs from the sinai station to the freedom square station. at the start of the main stage of work on the construction of new metro stations in nizhny novgorod, it is no coincidence that nikita eremeev has been interested in the topic of trains since childhood, and even created a metro driver’s console at home. in the future, i'm thinking of going to study to become a driver in our metro. if i am an honorary worker during this time, while the station is being built. maybe the tunneling is carried out from the control cabin, the first train will be sent, your dream, yes, choose as an honorary driver, who vladimir will have to work around the clock, a team of 49 specialists will servi