the new sports and recreational center is now in use in the villages of lyaskuk and minsk.rchitects and engineers are working. the first block where the children's pool will be located, there is a small 10x5 large pool, in this part there will be a 25 by 12 s2. let's start installing the pool floor with the bottom slab, and then we'll move on to the walls of the pool. here, for this purpose, the specialists are right about the large-scale technical services and the new electric season, the emphasis is on safe performance. there is the first charga of the maystra we are ready to replace the elements of the electronics tarmase system, the final stage, the scooters are prepared, palated and changed decarat elements. season 24, we are ready to bring to minsk more than 500 scooters, or more precisely 57 scooters that have fully undergone winter maintenance. where all repair work, adjustments, troubleshooting were carried out, new spare parts were replaced, new tires, new handles, all this will allow residents of minsk to move comfortably on electric scooters. we are planning to