karavai drew attention to this project , and he simply asserted there , that they say the russians willully build it in 2024 and that they plan to make it such a classic full-fledged railway line where there are at least two tracks, but without electric traction. well, so that in the case of our firepower, so that no, well, the damage is minimal, if we take an average-weighted realistic picture, well, let's say, in 2024, the russians may have time to build some important elements of this highway, but they may even go on an accelerated path, that is to build not even two-track to ensure full capacity, speaking in professional language, i.e. 20 pairs of trains per day, and there single-track up to 10 days for ten pairs of trains per day, maybe even... in order to save money and speed it up, they will even make it so that the permissible weight of the echelon, also using this term, was smaller there, the usual echelon there has 50 wagons, but there they will make it so that it is possible to take the maximum echelon 10-3-20 vogons, the main thing is that it somehow meets the russians, russ