the enterprise will become part of the already existing zapsib neftikhim complex, which will allow theenergy and logistics infrastructure. the total volume of products that will be produced at the dgp-2 installation is propane 570,000 tons, polypropylene 550,000 tons. we started last august. to immerse the piles, at the moment, by the end of may all the slab work will be completed, this is 29,800 pieces, pouring work is underway concrete below zero and installation of precast reinforced concrete. the launch of the new plant is expected in 2027, which will create more than 350 jobs and 2,000 in related industries. today zapsibneftim is an enterprise that ensures the development of not only tobolsk, but everything. prospects for the development of the industrial sector itself . these are our great friends, we see large sites, since its potential has not yet been fully exhausted. in the near future , a scientific and innovation center will appear at the oil chemical plant, where they will study and simulate the processes of obtaining new ones. polymers, project, which sibur has been worki