emergency plans that i mentioned are at your service and the water desalination plant is located in the panawarvince of sistan baluchistan and the plans that are coming . and health and service and industrial jobs, in fact , to make it easier for us to explain to you, thank you very much, just one question. which i did not forget because mr. noushadi also mentioned it in the water softeners or in general all the plans you did, how much internalization did you have from the capability of the internal forces, about 60 internal in the water. in the rest of our answers in the construction topics that 100 internal work, in general , if we divide the work we do into two parts, equipment and construction, in fact, in construction topics, 100 of our internal forces, both in the design phase and in the implementation phase, actually help. they are doing about 85 in the equipment department. actually, we have internal capacity. this 15% that we don't have is mainly in parts of the turbine and desalination, that is , let's assume in the turbine runners and in the membranes and some of the components of th