our plan is 114 wells by contractors and 34 wells by pars oil and gas company. willing, in the future , the first platform of block 13 is planned to be hit by a ship in the 90s. bahraini was injured since that day until this platform. in this government , the good actions of our colleagues in the national oil company , i almost think, god willing , this phase 13 of alpha will be ready for operation at the beginning of this year 1403, 7 points for 37 pars offshore platforms. south is intended for the installation of pressure boosting equipment. any number of these platforms, each of which has 11 four rings, must come on the new platform, the gas that comes will actually be boosted, if 20 times, 60 times, if 60 times , it will be 120 times, and it will be sent to land to refineries . which we have in asaliya. using the capacities of companies of scientists and manufacturers is the main priority of this national plan. definitely a lot of. fortunately, 25 contracts have been concluded with knowledge-based companies . we will advance our negotiation plan and, god wil
our plan is 114 wells by contractors and 34 wells by pars oil and gas company. willing, in the future , the first platform of block 13 is planned to be hit by a ship in the 90s. bahraini was injured since that day until this platform. in this government , the good actions of our colleagues in the national oil company , i almost think, god willing , this phase 13 of alpha will be ready for operation at the beginning of this year 1403, 7 points for 37 pars offshore platforms. south is intended...
0
0.0
Mar 29, 2024
03/24
by
IRINN
tv
eye 0
favorite 0
quote 0
34 wells by pars oil and gas company. willing, it will be planned in the future. the first platform of block 13 was damaged in the 90s when a bahraini ship collided. since that day , this segko has been closed. and now it will be part of the pressure plan. god willing, phase 13 alpha , which is a very important phase, its facilities were damaged, and the good actions of our colleagues at the national oil company in this government, i almost think , god willing, this phase 13 alpha will also be ready for operation at the beginning of this year, 1403. 7 points for 38 platforms. south pars sea is considered for the installation of pressure boosting equipment. any number of these platforms, each of these platforms has 11 loops four times, it should come on the new platform, the gas that is coming will actually increase the pressure, if it is 20 bar, 60 bar, if it is 60 bar, it will be 120 bar. using the capacities of companies of scientists and manufacturers is the main priority of this national plan. definitely a lot of fact
34 wells by pars oil and gas company. willing, it will be planned in the future. the first platform of block 13 was damaged in the 90s when a bahraini ship collided. since that day , this segko has been closed. and now it will be part of the pressure plan. god willing, phase 13 alpha , which is a very important phase, its facilities were damaged, and the good actions of our colleagues at the national oil company in this government, i almost think , god willing, this phase 13 alpha will also be...
0
0.0
Mar 30, 2024
03/24
by
IRINN
tv
eye 0
favorite 0
quote 0
it is possible that the program that we have 114 rings by contractors and 34 rings by oil and gas company pars will be planned in the future. block 13 was damaged in the collision of a bahraini ship in the 1990s. since that day , this platform has been closed and now it will be part of the plan to increase pressure, god willing, phase 13 of alpha. it is also a very important phase, the facilities of which were damaged , and the good actions of our colleagues in the national oil company in this government . 7 points for 38 south pars offshore platforms have been considered for the installation of pressure boosting equipment. any number of these platforms, each of these platforms has 11 four rings, must come on the new platform, the gas that comes will actually be boosted, if it is 20 times , 60 times, if it is 60 times, it will be 120 times. we have honey. using the capacities of companies of scientists and manufacturers is the main priority of this national plan. definitely, many of the factories and industries of the country that have empty capacity will definitely be filled after the st
it is possible that the program that we have 114 rings by contractors and 34 rings by oil and gas company pars will be planned in the future. block 13 was damaged in the collision of a bahraini ship in the 1990s. since that day , this platform has been closed and now it will be part of the plan to increase pressure, god willing, phase 13 of alpha. it is also a very important phase, the facilities of which were damaged , and the good actions of our colleagues in the national oil company in this...
0
0.0
Mar 10, 2024
03/24
by
IRINN
tv
eye 0
favorite 0
quote 0
nation, that is why the ministry of oil and the national iranian oil company signed the relevant contracts . the south pars gas field pressure boosting project is one of the strategic and key plans of the ministry of petroleum. with the implementation of this plan and because of the harvest gas reaches its maximum and we do not fall behind in the competition with the neighboring country and prevent gas migration. we are supposed to have 28 ohm platforms from pressure boosting platforms. with the construction of this equipment and the implementation of this plan and equipment, it is possible to install and deploy about 90, that is, more than 90 trillion cubic feet offshore. it will be added to the country's gas, and our withdrawal will be at its maximum level compared to the situation without this contract, and compared to the natural discharge method , it will have an excess withdrawal for us, and it will add about 2 billion barrels to our valuable gas condensates. with an investment of about 20 billion dollars we will be able. with this increase in harvest , we will have a total of more t
nation, that is why the ministry of oil and the national iranian oil company signed the relevant contracts . the south pars gas field pressure boosting project is one of the strategic and key plans of the ministry of petroleum. with the implementation of this plan and because of the harvest gas reaches its maximum and we do not fall behind in the competition with the neighboring country and prevent gas migration. we are supposed to have 28 ohm platforms from pressure boosting platforms. with...
0
0.0
Mar 24, 2024
03/24
by
IRINN
tv
eye 0
favorite 0
quote 0
the managing director of national oil company said in the official ceremony of relocation and installation of the platform of south pars block 11 development project: this project, in addition to compensating the gas imbalance in the country in terms of economic income, with the completion of all parts of the block, will be 5 billion annually. from leaving the sanctions wall , it will be the beginning of a return for those who want to invest in iran. we are talking about the 11th part or phase , the most strategic part of the common gas field of iran and qatar. the development will start with a consortium consisting of two companies. it was a foreign company and a domestic company. after america's withdrawal from the jcpoa, this french company 's bad faith was soon revealed, and even the chinese partner backed out of the contract . the chinese company refused to continue working. now we were left with a hand in the skin of a walnut and a 5 billion dollar annual deficit, but we couldn't wait for foreigners any longer, while foreign companies withdrew from the contract for the development of
the managing director of national oil company said in the official ceremony of relocation and installation of the platform of south pars block 11 development project: this project, in addition to compensating the gas imbalance in the country in terms of economic income, with the completion of all parts of the block, will be 5 billion annually. from leaving the sanctions wall , it will be the beginning of a return for those who want to invest in iran. we are talking about the 11th part or phase...
0
0.0
Mar 3, 2024
03/24
by
IRINN
tv
eye 0
favorite 0
quote 0
pressure boosting operations in the south pars gas field. if the south pars gas field is not completed in the next 3 to 4 years, we will see a significant drop in gas pressure . the situation of the south pars common field, god willing, with the implementation of the pressure boosting project, it can reach the situation of its first days, and the implementation of the pressure boosting project requires an investment of 20 billion dollars, which the ministry of oil and the national iranian oil company have put together. with the cooperation of all parts of the country, god willing , it is moving forward, its studies have been completed and it has been determined from which region the pressure increase scenario will come . let's go dear ceo of shahid hashminejad refinery, khorasan razavi, said: storage before winter ensured the stability of gas supply to the northeast of the country. this year , we have achieved adequate storage of gas, so that we had stored 1 billion and 820 million cubic meters of gas in 401. alhamdulillah, in this year, whi
pressure boosting operations in the south pars gas field. if the south pars gas field is not completed in the next 3 to 4 years, we will see a significant drop in gas pressure . the situation of the south pars common field, god willing, with the implementation of the pressure boosting project, it can reach the situation of its first days, and the implementation of the pressure boosting project requires an investment of 20 billion dollars, which the ministry of oil and the national iranian oil...
0
0.0
Mar 3, 2024
03/24
by
IRINN
tv
eye 0
favorite 0
quote 0
amiri of sada and sima news agency, the ceo of national oil company announced the determination of the area to start pressure boosting operations in the south pars gas field. the oil minister had said this november. if the strategic plan to increase pressure in the south pars gas field in the next 3 to 4 years. if it is not done , we will see a drop in the pressure of the special gas. the situation of the south pars common square, god willing, with the implementation of the pressure boosting project, it can reach the condition of its first days, and the implementation of the pressure boosting project requires an investment of 20 billion. that the group of the ministry of oil and the national iranian oil company, with the cooperation of all the elements of the country, is moving forward, god willing. its studies have been completed, and it has been determined from which region the pressure increase scenario will be . i think, god willing, we will be able to do it by the end of this year. let's inform our dear people about good actions. ceo of shahid hashminejad refinery , khorasan razav
amiri of sada and sima news agency, the ceo of national oil company announced the determination of the area to start pressure boosting operations in the south pars gas field. the oil minister had said this november. if the strategic plan to increase pressure in the south pars gas field in the next 3 to 4 years. if it is not done , we will see a drop in the pressure of the special gas. the situation of the south pars common square, god willing, with the implementation of the pressure boosting...
0
0.0
Mar 28, 2024
03/24
by
IRINN
tv
eye 0
favorite 0
quote 0
according to the managing director of national iranian oil company, the pressure increase plan. the south pars gas field is the most prioritized upstream project of the country's oil industry, which generates 500 billion dollars of income for the country with an investment of 20 billion dollars. mr. khojaste mehr says that the implementation time of this project is 10 years and the initial design contract and basic engineering studies have been concluded. we have four waters. this means that we are around 50. up to 60 turbos we need a compressor, and we need about 20 platforms , both pressure boosting platforms , gedaring platforms, and accommodation platforms. this project is so critical for us in terms of time that we must do this wherever we can get this equipment from anywhere in the world. let's do this. these platforms that we are talking about sometimes weigh 13,14,000 tons. if we invest this 20 billion dollars , it will add 100, that is, 100 trillion cubic feet to the reserve to the amount of our harvest , from the seven new products in the 14th executive director of ira
according to the managing director of national iranian oil company, the pressure increase plan. the south pars gas field is the most prioritized upstream project of the country's oil industry, which generates 500 billion dollars of income for the country with an investment of 20 billion dollars. mr. khojaste mehr says that the implementation time of this project is 10 years and the initial design contract and basic engineering studies have been concluded. we have four waters. this means that we...