ros gedra is among the largest taxpayers of the country, increasing its capacity every year.on rubles were allocated to the budget. this is a plus of 15% compared to the previous reporting period. the holding also has extensive functionality and geography. at the moment , rushydra holding is operating, we are not only a generator, yes, that is, we are also quite widely represented as a project complex. shakku, represented in the world by our institute, is about 100 years old. today we are represented in 13 countries in the field of consulting and design of hydraulic engineering in mining hydropower and other areas. rushydra implements large investment projects, as noted by general director viktor khmarin, including in difficult climatic conditions. we are talking about chakotka, where a 110 kv power transmission line was put into operation. new line. 490 km long connected the northernmost city of russia pevek and the city of belibina, among the significant projects are the new block of the vladivostok tets-2, as well as the krasnogorsk small gs1 in karachay-cherkessia. in 202