in rasht, roshd central library is ready to open, which is one of our very large books. in iraq, our central library has nearly 80% progress. god willing, if we can verify its credits soon, god willing , we can have it as the largest library in the west asia region and the report that mr. ramezani was giving. we have maybe 20 to 30 ready libraries with a little credit injection, god willing became. the largest offshore desalination plant in sistan baluchistan is ready for operation. this desalination plant was built in 8 months at a cost of about 2800 billion tomans. the reduction of seawater desalination resources in recent years has led to the prosperity of the desalination industry, an industry that has flourished today in our country along the persian gulf. but now this industry is used to provide drinking and sanitary water in sistan baluchistan province by building the largest offshore desalination plant in the country . that their water supply is affected the sources of water received were from qaqaba, hirmand and chaanimeha, that is, the five cities of sistan and