among those who completed the operation of the reactor was gennady rubtsov.f to the nuclear industry for more than 40 years, he is still changing today, part of the equipment is working, we need to ensure its performance, electricity, first of all, we have all the electrical parts in operation, practically, safety pumps that provide emergency cooling. decommissioning of nuclear reactors built during the soviet era and construction new part of rosatom’s large program, the state corporation plans to stop and withdraw from... small stations, land-based, floating, except for our generation, the most in demand on the planet, generation 3+ , step into the fourth generation, there really is enough work for everyone here for two decades, and we are very glad, we are very glad that we have this work, to provide our beloved country, to provide the entire planet with atomic green nuclear energy, to replace the rbmk 1000 , new power units vvr 1200 are being built, at leningradskaya... they already exist, now this the only nuclear power plant in russia that operates power