the implementation of saleh abad pipeline will start soon.nks to a blessing on muhammad and the family of muhammad. in 1402, the sal abad to torbetjam pipeline project started , the route is nearly 73 kilometers long, of which nearly 35 kilometers are completely mountainous and have seasonal rivers, and the approximate volume of earthworks was nearly 2 million cubic meters of soil. fortunately, with an operational and revolutionary jihadi work excavation volume was done in a period of 2 months. in nowruz 1402, by mobilizing all the facilities and with the planning that was done simultaneously , the study operation of routing, design of supply of goods and its implementation were put on the agenda. we chose a path that causes the least damage to the environment, natural resources and private owners. as the weather warmed, the engineers and specialists of this industry continued the work in the mountainous areas of the east of the country. the rush to paint was 30 to 35. now we are doing 100 to 10 a day. that really, people, if it is winter, we