shevchenko quarter, opposite you, building 64, here 100% roof replacement, facade repair, painting, washinglso being replaced with sheathing, waterproofing, slate replacement, fencing replacement and will also be installed. season 22-23, we must replace what has suffered within the framework of today's realities, has already either reached such very serious wear and tear, here we see gas equipment, similar equipment will be installed there with less power, because there are completely different consumption figures, but absolutely similar in according to its functionality. the municipal services complex of the city of moscow has set the task of replacing cabinet gas control points; accordingly , the scope of work includes dismantling old cabinets in their place, installing new ones completely with the supply of new pipes, and, accordingly , fittings, and what is the weather like, it’s hot, it’s hard in suits, oh, not a little watch how sweet their wife is to me.