it was the first time in azar month that we started the construction of roads from the silweh kani sik dam in azar month it was the first time that we went to another province apart from west azarbaijan, and our dear ones in kurdistan have the necessary cooperation with the ministry of energy. the cooperation of the ministry of energy was very good. this water comes behind the century of shahid kazemi in bukan and from there the road construction operation starts towards urmia lake . the acceptable amount of water that was behind mahabad and bukan, as well as sarakh in takab, this road construction operation was also carried out in the three hundred that i mentioned. currently, the condition of this water area has improved and its water volume has reached 1 billion and 71 million cubic meters with an increase of 160 million cubic meters compared to the same time last year and about one and one-tenth billion cubic meters compared to the beginning of the water season. god willing, in the medium term plan which is about stabilizing the conditions of lake urumi, god willing, we will reach