the project started in may last year and consisted of two stages, a project to connect three uselimskayaic station. the first stage is the construction of two new 500 kv cells. and the correspondence after this is the connection of the two lines of ustelemskaya. from uskut-1 and uskut-3, the second, the second stage involved connecting, transferring the line of uselimskaya egusku-2 and installing a shredding reactor. at the moment, all equipment has been installed and is being reliably operated. the completion of the construction of the facilities made it possible to strengthen one of the largest infrastructure systems in eastern siberia, the pereduy energy ring. it plays a big role in power supply four regions: irkutsk region, transbaikalia, buryatia and yakutia, including strategically significant ones. enterprises, as well as the new lep made it possible to double the power output of the power plant. the work of transit not only provided additional capacity for the bama traction substations, but also provided for the growing needs of local residents and industry. in particular , the l