Skip to main content

tv   [untitled]  BELARUSTV  May 30, 2022 12:10pm-12:41pm MSK

12:10 pm
the graduates thanked the teachers for their love and knowledge of the traditional flower waltz and, of course , the first grader with the bell, who rang the last bell. it is sad, of course, to leave the school a lot of fun moments were teachers. always supported and helped in some way. i want to try to enter the university in grodno, yanka kupala as a fashion designer. i hope that there were still dreams, i have great hopes that the guys will be determined in the profession so that their career guidance is in tune with the tasks that our country is solving, so that they were not looking for some share somewhere beyond the cordon, and in order to see their destiny in their future life precisely in their native belarusian land, preferably, of course, in the city of
12:11 pm
brest finishes 11 classes with silver and gold medals will arrange a separate holiday in the city park. further on the air is a sports review of the project by the tv news agency, available in social networks also in our mobile application by qr-code on the screen new information at 1:00 pm. before meetings. this was not enough for belshina in grodno, where the program of the tenth round of the premier league ended draw 2 championship table brunettes, eighth in betrothal 11 let's remind the leader borisov defeated dynamo brest within the framework of the game weekend 3.0 the day before, the defeat of the minsk power engineer without a chance defeated the slavs, mozyr five zero youth team in hockey, belarus lost to peers from russia in the semifinals of the black sea cup. daniil rogach nikita bespalov was thrown at us and for wallpaper, who debut assists shots for sergey's team
12:12 pm
stasia russians distinguished themselves four times in our goal 4.2 one of the brightest grand prix of the monaco season in the formula 1 class car racing, the pilot of red bull serberes won the second carlos sanz on a ferrari third . he is the leader of the championship. well, not gas, the clicker was the leader of the race, but due to a series of unsuccessful tactical decisions, he missed perez first, then sanz and fern.
12:13 pm
12:14 pm
each of us entering the house, turning on the light and not thinking about what happened, we take it for granted. actually for this is the cost of the work of so many people, the minsk cable networks branch. this is a single organism. everyone works for one common goal - to provide electrical energy to every minsker. the best evaluation of the effectiveness
12:15 pm
of the work of the branch of the minsk communiseti is that its work is invisible to the minch, if the work is invisible, then everything is fine. my name is igor chepurnoy. i am the deputy head of the cable lines service. head of the laboratory of the cable line service of the branch minsk cable networks of rudnitskenergo. what was before at best in each there was only one tv in the apartment, and now there are 2-3 computers and so on laptops there are
12:16 pm
phones, all this requires some kind of energy. where to get it from the outlet. how does she get there? i want to say with pride it comes there thanks to the minsk capital networks branch and thanks to the people who work. electricity from generating plants, but it can be a thermal power plant, a nuclear power plant, is supplied to the substations of the city of minsk. we currently have 36 substations at these substations. she goes down to this voltage then goes to the distribution points goes to the transformer substation after that it goes to our highly respected consumer population by some kind of administrative consumer. during working hours, there may be such production moments
12:17 pm
when it is necessary to go somewhere somewhere to the object. i can be at any substation , depending on what issues need to be resolved there. in general, the installed capacity of our substations is more than 2,600 mw , which is more than nuclear power electrorussian nuclear power plant? the main equipment of our substations includes power transformers, disconnectors, switches, a complete switchgear of various voltage classes, the main equipment - this equipment is called because electricity flows directly through it to our consumers, our electrical equipment. it is the first in the chain of electricity transmission from power plants and large substations to our consumers. this equipment is very
12:18 pm
modern and complies with all the most stringent requirements, both in terms of safety and reliability, kilovolt substation podlesnaya is one of the forming substations of the city. minsk from here to us at the moment comes food from the minsk thermal power plant and through this cable. at the design stage and subsequently at the stage of construction of a substation to a common power facility. she pays a lot of attention to the prospective development of rue minskenergo and the minsk cable networks branch think about the future. my job is as deputy head of the cable lines service. lab chief hmm includes the two most important aspects. the first
12:19 pm
organization of the operation of 110 kv cable lines the second management of the testing laboratory of the branch of the minsk cable networks of romanian energy, my working day starts at 7:30 in the morning. i come to work and get acquainted with the list of disconnected equipment. everyone 45 starts our general network selector, we plan work for the current day. this is the topographer 2.0 program, me or our staff. can look in this program. what events have been over the past day, that is, well, in terms of turning off part of some damage in terms of inclusion, that is, in terms of testing in the same program. for example, we can look at the protocols for determining the location of damage in order to
12:20 pm
plan these works, imagine what would happen if there was no electricity during the day. the most terrible violation is the normal operation of objects that are provided for the life of people. the same hospitals. god forbid, operating rooms , some organizational departments, other communal facilities, a water canal, a sewerage system, if any damage occurs electricity. we will all notice this. any emergency situation is eliminated within two hours no more, for example, some kind of shutdown has occurred somewhere within 2 hours . our service
12:21 pm
works 24 hours a day, despite any weather conditions, everyone remembers, uh, strong january winds, that is, people could not, some had no electricity, could not get home, despite this dispatcher. he was on a shift and did not hand over a shift until the last consumer was powered, he would not have voltage, that is, the light in the house would not be on. the branch dispatcher is a link between various departments, thanks to its competent decisions, the quality of the branch's work is determined by the same consumers. we are at the center of our dispatch service. here you directly see the dispatchers who manage these networks in front of you , the relics are presented to me. here we see
12:22 pm
a schematic representation of our transformer suppliers in total in the city of minsk, we have 2,500 transformer substations in operation, almost all of this is shown here by the dispatcher. all this understands all this see all this controls. this is our daily work not only of our dispatching service, but also of the repair personnel, thanks to which we provide reliable quality or network supplies - this is a single organism that works for one common goal, and therefore all structural divisions. they are related to each other in one way or another. here we have presented are encrypted various kinds of abbreviations that are incomprehensible. there are wines that understand, uh, the dispatcher from six months, for example, this is the philharmonic we have encrypted here. conventionally, we designate various kinds of
12:23 pm
objects, such as a hospital, not for everyone either. clearly, this is the designation, but the dispatcher sees it all. a green blinking square means that an emergency situation has occurred at the moment, consumers are left without voltage. this signal e, the dispatcher came online. in the manager, he sees that happened a immediately sends crews there to repair the damage and controls the timing and time to repair the damage should not be more than two hours in our final for the previous year 66 minutes. that is, this is a fairly good indicator, which we equal and which we are trying to reduce.
12:24 pm
the team of the project to the worst inc. no, ask. that rustagodil otshukat and zanatovat and everything, chestnut sash with our traffic jams. in turn, on the operator a new breath and another chance to live and the way music is fashion is changing. and it seems to me that young people will listen, they will just listen and they will not get high
12:25 pm
. cope culturally from the old expeditions at once with a project on a pirate bypassing belarus 20 shatyrs on tv channel. we will tell you about the unique miraculous icons, therefore, turning to the minsk miraculous icon with a prayer. blessed virgin, believing people are trying to arrange their lives. according to the commandments of god, the mother of god also responds to our prayers. let's get acquainted with the history, the greatest shrines of belarus, it will expose how the church lives by the power of god, the power of christ, and indeed during the great patriotic war. the temple was
12:26 pm
open. e for prayer for worship. divine liturgy began to be celebrated in it even after the war. temple gradually began to restore let's talk about the power of the faith for which there are no territorial boundaries and language barriers of god if we want to know jesus christ, then we must read his word to live by this word. most importantly, we will help. find answers to various questions about the spiritual life of a dog, uh, which the human race needs now, of course, first of all, look inside yourself, by a miracle, it probably consists of when a person begins to change, watch spiritually, educational projects on belarus 24 tv channel. the
12:27 pm
automatic transport service is one of the most numerous services, its task is provision of structural subdivisions of the branch of minsk cable networks and resources. ah, a variety of equipment, teams of cars, excavators, dump trucks, towers, some kind of lifting mechanisms. first remembrance of our service it was on july 21, 1944, by order number one of the director of the network management, the station was formed by the department of transport, horses trophy bicycles motorcycles, and five cars from that day started here. the history
12:28 pm
of our service to date in the service of mechanization. motor transport employs 205 people, 142 vehicles and 24 tractors, the main task of the service is to provide the departments of enterprises with the necessary amount of auto-tractor equipment to perform emergency recovery and scheduled work, as well as maintaining this equipment in a technical condition. at the moment , 2 million people live in the city of minsk and, uh, the desire of the minsk cable networks branch to organize power supply so that everyone is satisfied with the quality of electrical energy that comes to him, so that every industrial facility, every utility consumer, and never
12:29 pm
experience any either problems in terms of power supply damage. we use mobile electrical laboratories, which are presented to you in this the machine. it provides the ability to test equipment and find the place of damage to cable lines of 0.45 kilovolts. a block is installed here, which we set the parameters and the ability to determine this damage. it is called the high-voltage compartment, where the high-voltage cables are located, with which we directly connect to our cells, ground and perform their function, the energy system of the city of minsk
12:30 pm
originates in 1895. in 1911, the first cable line was laid in the city of minsk. a little over 7 km and successfully operated. and the prerequisite for the construction in 1911 of the first cable network in the city of minsk was the following factors. the first is, uh, an increase in the reliability of the electrical network due to the fact that some external influences are reduced, atmospheric effects, the impact of some third-party hmm and, of course. a significant factor, beauty is the preservation of the external appearance, the preservation of the external appearance of the city, the places where
12:31 pm
this communication takes place. this is the very first 110v xlpe insulated cable. kv which was laid here in our city of minsk. as you can see, here we have a screen not a wire one, but a tape one, unlike these cables. this cable was manufactured in the russian federation in the city of podolsk, this is the second batch of cable manufactured at this plant, that is, we were pioneers. these are samples of all cables that are laid in the city of minsk. this is prepared in order to have the actual geometric dimensions of the cable if it is necessary to order some kind of cable accessories later for these people. let's say we know where on which line we need to purchase or order cable fittings, we take a sample, which we take all its dimensions on this line.
12:32 pm
every year a lot of new substations were merged , many cable lines were laid. the total length of 110 kilovolt cable lines is more than 101 km. the testing laboratory of the branch of the minsk cable network rukhninskenergo was organized in 2003. the prerequisite for the creation of a laboratory and for the implementation of incoming inspection of cable and wire products were the numerous facts of supply at that time low-quality cable products, that is, somewhere the products were lying in some warehouses in some storerooms. well, there were times like that. unfortunately , this is the product. as of today, the testing laboratory of the branch of the minsk stone network rudnitsenergo has tested almost 33,000 cable samples,
12:33 pm
of which, unfortunately, 1,415 samples did not meet the requirements of certain standards, which means that for such a number of cable samples, we do not allowed poor-quality products into power network and, as a result, increased the reliability or power supply of the consumer of the city of minsk in 2019, the testing laboratory of the branch of the minsk communist party received accreditation; the competence and qualifications of the laboratory personnel were recognized throughout the republic. in 2020, the testing laboratory once again confirmed its qualifications and confirmed its competence by switching to a new version of its standard. just recently, the testing laboratory passed a periodic assessment by the specialists of the bgts pgc - this is the belarusian state center for accreditation, that is, the body that accredits the laboratory. directly in
12:34 pm
this room, the cable samples are disassembled and the subsequent measurements of its structural elements take place. basic requirements for this to this room. this is the first creation of the necessary microclimate, as well as the use of appropriate measuring instruments. what do we have here? well, brought a re- cable had a spasm insulation problem. now i will cut off the extruding vein. i will cut it off on the guild, blueing the sample and we will fill it. and the problem was. in which the minimum value does not pass, that is, the minimum minimum value, that is, the minimum value of the thickness and 92.84. i understand. come on, then we cut, make a cut and again, measure. the testing laboratory is equipped with all the necessary measuring instruments measuring microscope - a
12:35 pm
variety of micrometers, a variety of calipers and various other tools when disassembling a cable sample, specialists, in turn, check the presence and, accordingly, design parameters the technical requirements for the cable, then the corresponding geometric dimensions are checked, the geometric dimensions are entered into the computer. and after that, the data is transmitted to the workplace of the test laboratory engineer. that's it, vladimir let's then pass this data to the engineer. to make cables with xlpe insulation is 30 years old, there is a cable line in the city of minsk, which was put into operation on 1.01.1933 . the total length of the cable
12:36 pm
line section is 500 m for the entire period of operation of this cable line, there were only two facts damage to this cable line. moreover, these facts are connected precisely with the external influence of outsiders in construction and installation organizations. that is, this once again shows that e. what is generally, in principle, the reliability of stone lines. in the city of minsk , a number of lines, power transmission lines, made by overhead lines, are still preserved. today , systematic work is underway to reconstruct and replace these overhead lines. all this is being done to increase the reliability of power supply and, as a result, improve the quality of power supply to our consumers.
12:37 pm
it is my responsibility, including during the organization and supervision of the construction of electrical networks, which will subsequently be assigned to the cable line service. i'm listening to you. you let's start what i have now for 20-30. minutes at the facility, i'll sort out all the questions there. now we are going to the aerodromnaya 2 substation under construction to participate in the sampling of 110 kv cables before
12:38 pm
testing representatives of the stone network branch. uh. well, in particular. i am in particular an engineering and technical worker participate in the procedure for selecting a cable sample, while an external inspection of the drum with the cable is carried out; inspection of the cable located on the drum. well, what does it mean to conduct supervision, in general, personally, i think that the operation of any power equipment begins at the stage of consideration and approval of a design solution. so, as representatives of the operating organizations, they must express their opinion regarding the correct and efficient operation of the mining. and our opinion. it must first of all be confirmed by the current
12:39 pm
at the moment, according to regulatory and technical documents, drums with a 110 kv cable intended for laying a 110 kv cable line, kolyadichi aerodromnaya 2, are being unloaded at the construction site. so far, only the organization of construction has begun here. well, while the drums are temporarily folded, cable samples are taken. supervision is such a rather serious stage, at which, among other things , the correct and safe operation is laid. safe not only for staff, but also safe in the first place for residents of the city of minsk cable lines pass through the city people walk children play in
12:40 pm
the area of ​​these stone lines. it is our task to control that everything is fine in case of violation of safety and labor protection rules. there is, of course, the danger of an epic current , but the situation is normal. that is, as if, if all the distances determined by the relevant current technical regulations are observed. there is no danger to the population. in my duty. also included is the implementation engineering inspection of equipment and cable lines 110 kw in accordance with the regulations regularity once a month , an electric power inspection of the entire route of the cable line 110 kv is carried out. including inspection of the support, including inspection.