tv [untitled] BELARUSTV May 30, 2023 3:00pm-3:10pm MSK
3:02 pm
3:03 pm
director of the nuclear energy department of the ministry of energy of the republic of belarus today we will talk about the development of nuclear energy at our nuclear power plant and the implementation of our nuclear program. hello, on the air, the program, say, do not be silent, studios victoria popova and svetlana smolonskaya. and today our guest is alexei turf. good afternoon alexey pavlovich good
3:04 pm
afternoon today we will talk about the first belarusian nuclear power plant in such depth. as far as it is possible in the format of our program. and let's first find out at what stage of launching the second power unit, we are now. today we are at the energy launch stage. it is coming to an end and the experience for industrial operation is coming. this is the next stage. uh, within this stage. we have reached the minimum controllable level of power and reactors. it's 1%, e afterwards. we increased this capacity to 40% and the thirteenth of may. we are connected to the network. that is , the turbine generator has already started to work with the turbine and began to produce kilowatts in the energy system of the country, e-e . subsequently, on may 19, we increased the power to 50% and now we are. here at this level, it means, naturally, all this is accompanied by the implementation of a whole series. uh, testing. let's watch an exciting video of how
3:05 pm
7 Views
IN COLLECTIONS
Belarus TVUploaded by TV Archive on
![](http://athena.archive.org/0.gif?kind=track_js&track_js_case=control&cache_bust=2030808100)