tv [untitled] August 19, 2024 10:00pm-10:30pm EEST
10:00 pm
you feel it right away. dynamo, kyiv, red bull-salzburg, only on mego. for a chance to enter the champions league, kyivans will give all their strength on the field. cheer on august 21 at 10 p.m., exclusively on mega. wow, went for a walk, water. ordinary water is not enough here. drink reo. i'm saving myself. reo. you are ready, dear. finished. took reo. reo - water for special medical purposes. more in the joints it is so piercing, it does not allow me to move, i bought a yellow dolgit cream at the pharmacy, it saves me from the pain of rheumatism dolgit - the only yellow cream for pain in the joints and back, there are discounts until the day of independence on detoxyl tablets, 15% in the pharmacies psylshynik bam and ochad, there are discounts until independence day on tablets tempalgin 10% at the pharmacies psyslynyk bam and ochad. greetings,
10:01 pm
dear friends, this is the espresso tv channel, and a special edition of the urban reconstruction and development program is on the air. my name is lesya vakulyuk, and in today's episode, together with experts , we will talk about the reconstruction of ukraine, so that everyone who needs it knows about their rights and opportunities, which are related to recovery initiatives, and also... we want to improve the recovery process in different corners of our country. today we will talk about zaporizhzhia, and the guest of our program is the head of the infrastructure restoration and development service in the zaporizhzhia region, oleg halych. mr. oleg, i congratulate you. yes, good afternoon. before we start the conversation, i suggest you and our viewers watch the story of our correspondent artem lagutenko about the situation with
10:02 pm
destroyed houses in zaporizhzhia. the existential difference between russians and ukrainians is that the occupiers can only take other people's property and destroy what they cannot to reach ukrainians are a hardworking people who will definitely rebuild everything. this house in zaporizhzhia was hit by a russian missile last year in march. the occupiers destroyed several entrances to the five-storey building under the foundation. 13 people died, including an eight-month-old baby. my son and i were here together, sleeping, and when the first explosion occurred, we ran to the corridor, my son sat on a chair, i covered him and the second explosion occurred. the russians fired their rockets at olga and her nine-year-old son, the woman and the child survived, but not their apartment. until this moment, he well, it was scary, but he still didn't understand that much. how can it be, after that,
10:03 pm
of course, he says, mom, i'm scared, he 's afraid, he, i can't, we went through a lot of stress, and this is igor, a resident of another five-story building in the center of zaporozhye, which the invaders fired upon from s-300 systems in october 2022. my wife and i were in the bath together. with the cat, maybe it saved us, there was nothing behind the wall, the destruction in the apartment is glass, windows, furniture, clothes, everything that was on the flight, all of it was damaged. in this eight people died in the house, one entrance was destroyed in a shunt. dozens of houses and hundreds of apartments were destroyed in zaporizhzhia due to the attacks of the russian occupiers. 20 apartments were destroyed, and let's say 130 were damaged. this is very scary. there was, well, who
10:04 pm
was standing there on the balcony wanting to swim, who was taken down by the tower, independent ukraine 80 - this is 59 apartments, i.e. 59 families on 67 nezalezhnoi ukrainya street, 80 families, on myru street 14:11 families, on 17 kamianoghirska street apartments, that is, 17 families, zaporizhia two 30. six families and zaporizhia 2b - 36 families and people, who became victims of enemy crimes were not left to their own devices. their housing is being actively rebuilt. currently, 12 apartment buildings are being restored in zaporizhzhia. according to this resolution, six buildings were liquidated by the restoration agency of the russian federation, that is, on which the restoration service is still working. the task of reconstruction is not easy
10:05 pm
- the builders admit. complicating everything, we perform work that is not called so, thanks, in spite of, and permanent. on the pace of work, well , we have what we have, nothing else is given, but we we fulfill our duties. this is what olga's house looked like last year, and this is what it looks like now. i am not spending money at the moment. in general, there will be a major renovation here, and even we were given a choice and... wallpaper, interior doors, floors, there is some choice, not all are the same. developers plan to hand over most of the houses in zaporizhzhia by the end of this year. artem lagutenko, oscar yanson,
10:06 pm
espresso tv channel. and i will remind you that we are talking about reconstruction in the zaporizhia region with oleg halych, he is the head of the department. and infrastructure development in zaporizhzhia oblast, mr. oleg, once again i congratulate you, actually, the zaporizhia region, its peculiarity is that it is an area where hostilities continue, and the enemy daily replenishes the number of those destroyed houses, shelling, taking away housing, the roof over the head, which is the worst taking away the lives of our people, is there any count of how many of those homes people lost? so the account is kept by local self-government bodies . zaporizhzhia and the region, how much has been restored,
10:07 pm
is there such an account, well, yes, we will enter only according to our service, in accordance with the resolution, we have a zamogo. on six houses that were destroyed as a result of russian aggression, well, that is, i can provide you with information on them, in another way, it is necessary in local self-government bodies, well, actually, these are the houses that are in your competence, the restoration of which is in your commitment, what these destructions are, how serious they are, we saw in the report of our correspondent artem logutenko, here is a comparison, and before and... after what happened after the russian missile and how it already looks like it has been restored, it is of course heaven and earth, tell us in more detail, well , look how serious all the houses are in the city center, the damage to the objects is different, there were, for example,
10:08 pm
80, 80, and 67 nezalezhnoi ukraina street, these were direct hits to the house, which caused significant damage. the damage is exactly what you have on the video, one of them is zaporizhsky 2 and 2b houses, which are located next to each other, a rocket hit the first entrance of the zaporizhsky 2a house, and it is now completely subject to restoration, i.e. it is dismantled and subject to restoration along myra street 14 and kamienovirska street, fortunately the rockets hit near the houses, so the damage was, let's say , from a tidal wave. these damages to walls, roofs, windows, balconies, and so on, so the damages are different, accordingly, the design solutions for each house correspond to them, well, their damage, how this process takes place, when a russian rocket,
10:09 pm
a russian projectile hits, there is destruction, eh , when the moment comes that the restoration begins, from which it begins, he it begins with... first, the collection of debris, which is carried out by the emergency services and municipal services of the city, then the city council engages a qualified expert, who determines whether the building can be restored at the expense of major repairs or reconstruction, or whether it is no longer subject to demolition, and, well, it is subject to demolition. after the expert has provided a conclusion, what can be done. capital repair or reconstruction works, the city council orders, well , conducts a tender for the production of design and estimate documentation and already on the basis of the basis of the produced design and estimate documentation,
10:10 pm
the customer of the works is determined and in accordance with tender purchases, the contracting organization that carries out these works is determined, how much? it's going to take some time for this restoration, when do you think it will be finished, or do you have any plans set, although i don't know, it's difficult to make plans now, considering that we are sometimes without... light and time from time to time in air alarms, so in our case with projects according to project documentation, these are the terms of missions there , the 25th year, part of the buildings, but from the task from the state agency and from the local self-government bodies, how to return people to their homes as soon as possible, therefore, in the work plans to restore all the houses by the end of the 24th year, er, and well, to completely complete the houses
10:11 pm
and the improvement of the territory, so there are indeed corrections with the current blackout, it affects both the ordering of materials, where the company that manufactures these materials also cannot produce them quickly, and the direct works, but with the help of the authorities. local government, regional military administration, these issues are resolved in a positive direction, and let's hope that these uh, let's say, directions will not affect the final delivery of the objects. who is financially helping to rebuild these houses? these houses are financed from the fund for liquidation of the consequences of armed aggression of the russian federation, that is, it is the state budget. all objects are provided with 100% financing, so in this regard, if
10:12 pm
there are none at the moment. residents, owners of these destroyed apartments, are there any, as we saw, and in the story of our correspondent that the woman who survived this attack, it's hard for her to remember it, it's hard to say, are there people who say, you know, i can't live here in this house anymore, even if you rebuild it, and it will all be like a new penny look, what happens in this case? well, on the contrary, all the people live in these houses, so let's say so, for communication with our houses, well, with the residents of the apartments that are being renovated, student meetings are held, chats on social networks are created for each object, and as she reported a resident who is with everyone, even already the arrangement of the apartment is going on, with each one
10:13 pm
the color of the wallpaper is chosen, there is some laminate, there is some within the cost of what material is included in the design and estimate documentation, most people want to return to their own, as we can see in the video these houses, which . they were built back in soviet times, there were slightly different requirements, different fashions, different layouts of even these apartments, but now during the reconstruction, are any corrections made, can the owners of the apartments, can they apply, i don’t know, someone there says, let’s make me a studio kitchen here, and a bedroom there where the kitchen used to be, and so i will have a bedroom and a bedroom where the kitchen is, and it will be then... a one-room apartment will be considered, or this is possible, this is impossible, because the work
10:14 pm
is carried out accordingly to the project, the overhaul does not involve changing certain technical characteristics, but that's all, but it involves the complete restoration of damaged entrances, the installation of new water, gas, and electricity supply networks, drainage, heating, roof repair, restoration, repair of glazing and windows and... that is, it is something that can be carried out within the framework of major repairs, that is, it is being modernized, but not like someone locked something in a studio there or increased, well, the square footage in the apartment at the expense of what, the search for building materials, how complicated it is now this process? well, even now , in the days when the war started, everyone, every
10:15 pm
company that produced material to insure itself, simply, well, provides the material only with almost, well, almost one hundred percent, with one hundred percent prepayment, and well, that's the only thing that was possible there before somehow there is 50%, there 30% to provide funds material. is provided, then the contractor closes the scope of work and pays, then at the moment everyone is reinsuring and providing the material, which is expensive at... and so the material, in principle, there are no questions, everything quickly reaches the object, to the objects, and the builders, or there is no shortage of workers, because we understand that mobilization is ongoing in our country, and the one who was at the facility today may be there tomorrow, yes,
10:16 pm
unfortunately, this is a question, many people. well, let's put it this way, they are afraid, they are afraid to work in connection with the fact that they will be at the tsc, but at today's moment, well, if, well, we ask to solve these issues on the ground, because, well , at least in order for us to hit the trips until the end of the construction, well, the completion of work on each object separately, for... how many local self-government bodies are included in housing restoration processes? yes, the local self-government bodies, let's say this, help a lot, this is both the city council and the regional city administration, and they help in solving issues with residents, with communal enterprises, and well, control from the regional state administration for
10:17 pm
by the terms that are established, that is , meetings are held on these issues. uh, well, what problematic issues can we address and, thanks to the holding of various meetings there with various utility companies or residents , solve issues that arise during the restoration process, well, the residents who contact you, what are their questions, with issues of wallpaper selection, the color of the wallpaper or something else bothers them, well, there are those, and there are... so urgent that the deadlines for , well, execution, why so long, why so, well, they are different, eh, can you somehow in general to calm down, maybe they will turn on the televisions, turn on the espresso and see our conversation, just get something out of it for themselves, that there are
10:18 pm
such, such, such houses, such terms will already be completed, well, yes, well, the first thing there is... 14 myra street we already have it 90% ready, then according to the plan of independent ukraine, we have 67-80, somewhere in november, well, it is already with the improvement of territories, there is a little, well, in the same terms there are november, zaporizhia 2 and kanenohirska, october, well in principle , we plan to finish all of them. next year, if nothing drastic changes there. reconstruction is currently underway almost all over the country, where the russians, russian weapons have reached, and where there are destroyed houses, is there any exchange of experience with other regions, can someone give you something, or do you give someone advice from your own experience, exchange
10:19 pm
it? well, we have state agencies. meetings among recovery services in those areas in which recovery is taking place, problematic issues are discussed at the meetings, ways to solve them there, as in the future, so let's say so, communication, let's say so, we have it goes from the agency to, well, let's say, to the regions, these questions are basically the same for us, so, let's say, experience like this, yes, in this way... what are the most common problematic questions during reconstruction? well, let's put it this way, that is, it is very difficult for the designers, when the house is not yet completely disassembled at the stage of its construction , a lot of things can not be taken into account, and this is
10:20 pm
the occurrence of additional work there , and that too, there is a deadline. they can finish adjusting the project documentation there, well, such technical points that require discussion there between our services there and our higher management. mr. olezh, i thank you for the conversation, the audience, i would like to remind you that oleh halych, the head of the service for the restoration and development of infrastructure in zaporizhzhia, was on the phone with us from zaporizhzhia. oblast and it was a special edition of the urban reconstruction and development program, my name is lesya vakulyuk, thank you for being with us, see you next saturday at 6:30 p.m. there are
10:21 pm
10% discounts on motorex tablets until independence day at psylansky bam and oskad pharmacies. the book women at war is a joint project the espresso tv channel and the publishing house duh i litra. the book is based on the reports of christina, the host of the espresso tv channel. 20 stories, 20 fates, 20 women who defended the country, the book is dedicated to women who chose the path of fighting the enemy in the ranks of the military, women at war, look for it in bookstores of ukraine, with the support of the konstantin zhivago charity fund, there are discounts until independence day on eden, 25% in podorozhnyk, bam and oskad pharmacies. there are discounts until independence day on decateln, 15% in pharmacies, travel. 10% in pharmacies podorozhnyk bam and savings two hours to learn about the war and
10:22 pm
how the world lives. two hours to keep up with economic and sports news. two hours in the company of favorite presenters, presenters who are loved by many. but like relatives, as well as distinguished guests of the studio, the events of the day in two hours, vasyl zima's big broadcast, a project for smart and caring people, in the evening at espresso. greetings , this is svoboda live on radio svoboda. we have already approached the serpent himself. the following shots may shock you. news from the scene. live kamikaze drone attacks. political analytics, objectively and meaningfully. there is no political season, exclusive interviews, reports from the hottest points of the front. svobodalai is frank and impartial,
10:23 pm
you draw your own conclusions. a special project for independence day, about the present and the future, about war, losses and pain, about... not times, but also about people, people who influence our future, people who give strength to fight, people who fight, help and believe in victory, people who do not give up and destroy the enemy, bright people, special project bright people in dark times, august 24 at espresso.
10:24 pm
10:25 pm
we talk so that everyone who needs it knows about their rights and which have opportunities related to restoration works, and also in this way we want to improve the restoration process in different parts of our. of the country, today we are talking about the lviv region, the guests of our program will be a lawyer and analyst of the anti-corruption center mezha vladyslav rudyka and the spokesman for the reconstruction and development of infrastructure in the lviv region, ivan bondar, but before we proceed to the conversation with our guests, i suggest you, our dear viewers, to watch a story about how the reconstruction of residential buildings in lviv, which were crippled by russian rockets. lviv. stryyska street 66. ms. lidzia shows her apartment, or rather the walls, which have been restored. this was lidia dudka's home until july 6, 2023, when the country.
10:26 pm
russia launched the biggest missile attack ever lviv. over the course of a year of repair work , the roof was covered in this house and three others nearby, floors were rebuilt, windows and doors were installed, and all communications were completed. by the end of 2024, it is planned to repair the facades here. for these works, according to the mayor andrii, money was given for repairs and reconstruction of apartments. i received 970 thousand. i have a two-room apartment, 46 m2, well, but we were told that if we hire a repair company, this money will go to their salaries, so what else should we do on our own. after the craftsmen patch up the holes which remained after the installation of sewer pipes, mrs. lidia has to dismantle the old
10:27 pm
wooden floor, fill the screed. to conduct electrical networks inside the apartment, as well as to do a number of repair works, all this for compensation funds. the fact that equipment and furniture will have to be bought with her own funds, says ms. lidia, she already understood. she and her son have been living in a modular town in stryi park for more than a year. it was there that the affected families were partially resettled. it is quite comfortable here, there is furniture, a table, beds, there is a place to put things. there is hot water in some premises, toilets, shower, kitchen, in the kitchen there is an electric stove that does not work because there is no electricity, the same goes for the refrigerator, but when there is electricity, you can cook something there, for those who did not want to live in a modular town, from the city budget they provide compensation for housing rent, 8, 10
10:28 pm
or 12 00 hryvnias, - says andriy. in total, the city spent approximately uah 132 million on the restoration of buildings on stryyska street. this includes all 17 buildings where hundreds of windows, doors and roofs were damaged. however, mutilated houses are not only on stryiskyi. 6 july 2023, the first blow fell on sakharov street. house number 301 is one of those that suffered the most. all the windows in it were blown out by the shock wave. some apartments have interior doors, and the elevator was thrown into the shaft. the apartment of anna maria's grandmother, mrs. lyudmila oleksiivna, was the most damaged. even a 30-kilogram oak door flew out there. at a meeting with the local authorities, residents were assured that they would be partially reimbursed for the money that people spent on repairs. anna maria and her grandmother applied to tsnap for compensation, but they are there
10:29 pm
received refusal the woman did not wait, so she replaced the windows in the apartment at her own expense. it cost uah 120,000. already after the installation of new windows , the commission came to the apartment. this commission seemed to be from the city. but nevertheless, we were told that the response would take effect. for some reason it is. and in the act, we received a refusal. because with the explanation that we are at our own expense. already installed these windows. who should compensate for self-installed windows? state program there is recovery in action or the city, no one never answered. in six months, without any reaction, anna maria wrote a post on facebook, in which she described the procedure for submitting documents, completed work, all amounts, and also attached a screen of the refusal to act. at least after that mr. andriy maskolenko and natalia communicated with me. letters in
15 Views
IN COLLECTIONS
Espreso TV Television Archive Television Archive News Search ServiceUploaded by TV Archive on