tv [untitled] February 22, 2023 11:00pm-11:31pm IRST
11:00 pm
11:01 pm
, this is also you, and there is hope for you, on the other side of the table , there is a martyr in your eyes, in the name of god, the most merciful viewers hello, good night, we are at your service with the travel plan and we hope that it will be of use to you tonight, considering the earthquakes that happened in khoi city on the 13th of october this year, the 28th of january, and the 8th of bahman, with less than an eye for earthquakes. in khoy city, we had spring to some houses especially in the villages caused damage, and one of the missions defined in the islamic revolution housing foundation
11:02 pm
is to enter these areas to rebuild and renovate the houses that are damaged by earthquakes. the foundation is in the mood to talk about the reconstruction and renovation of the earthquake-affected areas and see how the reconstruction process is going, and plans have been made to complete the reconstruction and renovation in the shortest possible time. you have come in the name of allah, the most merciful, the most merciful, to the service of hazrat ali dear viewers of the show, hello and have a good time. i thank you for giving us this opportunity and i hope that we will use the capacity of this program in the best way and provide good statistics to our dear people. which will be the basis for entering tonight's discussion, and then arha shows that more than 270 earthquakes above 4 on the richter scale occur in iran every year, from the 7th magnitude earthquake in zahra 7 and the 4th magnitude earthquake in rudbar to the 6th magnitude earthquake
11:03 pm
in band the earthquake killed more than 80,000 of our compatriots, but with the start of the program retrofitting of rural housing since 2004, the number of earthquake victims has decreased in the last year in the series of casualties in the hormozgan and khoi earthquakes recorded above the loaned and friendly house in the construction of the place from the works that have been done in the past years or not past the housing retrofitting loan. villagers of the housing foundation had used salmon. at the time of the beginning of rural housing retrofitting, only 5% of the houses were resistant in 1400. fortunately , we reached 50% of residential units in the village of mah . so that the amount of resistant construction to 325 thousand residential units in the year of morsi from 84 to 91, an average of 184 thousand
11:04 pm
rural housing units were retrofitted every year, but from 1992 to 1400, an average of 76 thousand units per year alone have a lower percentage of retrofitted units in non- in fact, more damage is expected. the housing foundation, as the trustee of the retrofitting of rural housing, is trying to carry out the retrofitting faster in disaster-prone areas. in these provinces, which are actually more vulnerable, according to the accident page , more units are actually allocated according to the program . sixth, the government is obliged to develop 200 annually 1,000 rural housing units should be retrofitted. currently, 203,000 rural housing units are being built in the country. picture of sed and sima news agency kahho . let's start with the aim of the last 8 bahman earthquake and how many
11:05 pm
villages were damaged. seeing the damage and the damage and what time was the complete destruction? do i need renovation? we only had three earthquakes in our region on 13 october 28 december 2018 in our region and damage was done to people's residential units in the villages and the city of khoy. the last earthquake was mahdasht was in february, we found 2120 units in need of renovation 560 units should be demolished and renovated in khoi city, and 1560 units in the villages of our city should be researched and
11:06 pm
renovated by 2121, and 11100 residential units in khoi city need to be repaired. the occurrence of the earthquake, i would really like to thank the dear colleagues of the radio and television, who provided me with the opportunity, and the various institutions to show their presence. the president, the honorable minister of the country, the honorable president of the red crescent and all their dear related officials were present. mr. president, during his visit , where he had reports and received suggestions , and as soon as they returned, he was in tehran at the meeting
11:07 pm
of the government board of loans and grants, which led to the payment of it was approved for repair units and shahbazi units for destruction and renovation of human capital. 250 million tomans loan for rural units that need to be moved to the city, 160 million tomans loan for urban units that need to be renovated, 300 million tomans loan for 160 million tomans for repair units. thirty million toman loan and based on the type of damage, the amount of damage to the building should be approved for repairs up to 25 million tomans, and this approval will go through the process urgently, and within the next few days, the payment of facilities will begin, but in all accidents
11:08 pm
caused by during the past 40 and 45 years, the housing foundation, which was responsible for the reconstruction of the affected areas , must pay from its own internal resources so that the people do not have to worry about the facilities and disaster and start paying for the reconstruction process. be present at the meeting of the minister of interior in the region at the same early hour the colleagues of the west azarbaijan housing foundation arrived immediately. i visited the rural and urban areas. this attack is a big deal, and a number of provinces must express their help. in this regard , the neighboring provinces of the east azarbaijan province, zanjan province , ardabil province, the province.
11:09 pm
kurdistan has sent their own debris removal machines to the region, a number of their experts were sent to the region to discuss statistics , and we are currently removing debris from 582 units that need to be renovated with 151 heavy duty loader trucks. do in badim, in the city of khoy, people were especially worried about whether the unit needs to be repaired or not. that's why the moin headquarters with shahr khodro to do the renovation work. zanjan province has been settled . there were many requests from the people and all the people requested that the building be inspected.
11:10 pm
because of this month, we received help from the engineering system of west azarbaijan province, a number of professors of the university and about 100 colleagues of the housing foundation across the country, who specialize in the improvement and retrofitting of units , were sent to the region and attended the deputy professor of zanjan province. we made between 500 and 600 per day the unit and the same colleagues and specialists play games in upgrading and retrofitting, or i assure the people that there is no problem with the unit. it is difficult, in any case, the building needs an expert to determine first that it needs repairs, and if it needs repairs, what kind of repairs should be done, where should it be strengthened , the building was ordered to work, some
11:11 pm
buildings always require 34 visits from experts. found and colleagues and university professors present they found the building and there was no need for repairs in the registration. people are reminded to find accommodation in their own units with confidence. after all , the people, especially the young children , were natural because of the earthquake . the visit of the relevant experts was the assurance that they gave to these families who were given emergency accommodation in tents by the hardworking colleagues of the red
11:12 pm
crescent. mr our khosravi, there are many measures that are taken at the level of our country and region . i have the duty to inform you about this. cement and rebar of all the units that were built is the welfare of the underprivileged foundation of the islamic revolution. we distributed cement and rebar to the people. it will take more than one day and this skeleton is made at home. the factories contracted by the saadi foundation and the housing foundation's own factories, these skeletons were sent to the region and delivered to the people. one thousand units and the rest of the human skeletons were being sent to the people of sultan, so they should be closed. their own pasargad bank they attended and had a meeting with the housing foundation. they accepted and donated the doors and windows of the interior and exterior and ceramic
11:13 pm
tiles of the construction units. the refinery of east azarbaijan province of tabriz. the meeting was held . it is enough for debris removal that no fee is charged from the people. the license of these units is issued by the municipalities in the city and by the villagers in the village for free, and the necessary arrangements are made by the respected governor for the implementation of the text of the text, dear mayors and villagers. they are working hard and very good cooperation the monitoring of the units is done by the supervisor of the rural and urban technical system
11:14 pm
, no amount is charged from the people for this, and these dear ones are paid for their books by the government. there are 2120 units under renovation. god willing, we will be able to start the renovation work by june. well, dear people of khoi city, the people are very faithful and patient. in fact, i have been there several times and enjoy the generosity of the people . renovation of a residential unit is difficult or resistant construction of the damaged units, but alhamdulillah, the people have a very good cooperation and the construction has always been centered on the people, and a very good cooperation between the people's housing foundation of dehiari municipality, all the officials of the governor and especially me, i think that since the day of the baharestan earthquake, at least one or two days a week
11:15 pm
in the field, the private sector is present in the supply of sand and concrete construction materials where necessary, and by the grace of god , we do not have any problem in providing the materials for these units to construct or repair them. given that if there is a place where the implementation is less than the relevant provinces, we will be able to restore the units quickly, god willing, complete this repair and renovation issue on 28th of bahman. 500, we now have 150 machines every day in different
11:16 pm
places , and these units are mostly clay and mud units. let's do the technical principles of debris removal let's get to the zero point and from there, build a building according to the desired building code and build it, but our plan is that, god willing, by the end of this year, that is, in the next 26 days, we will not be able to remove the debris from the abad dam, because it will take one month. in the past, as well as 1500 units of leaves have not been done, and the weather is like ours now. an earthquake happened today, march 3rd. it didn't happen once in 29 days. for the first few days , it was mostly closed for rescue and emergency accommodation. most
11:17 pm
of this is on the shoulders of hilal. red army, basij, revolutionary guards, and loved ones of political officials are enough in these days debris removal is too fast, we can't go to work. also, machines are sent from other provinces. it's been about two weeks now that the quality of our mother's machines has reached 150 machines, and the speed of removal has increased. i have received statistics from my colleagues with the program, god willing, by the night of eid, complete the demolition of all the remaining units . from now on, not like temporary accommodation , they will continue to be closed until
11:18 pm
it is completed. dear ones, there are many of them there the pyramids that are still there, i would like to tell you that the place where the tents that the red crescent has given is in the yard of his own house or its approximate demolition, that is, the building is damaged, the roof is damaged, the wall is damaged, you cannot put up tents and their lives are oppressive , there is furniture and furniture there. i was making furniture for ashura, for example, the unit next to him, for example, his brother's house was built by retrofitting it, and he moved it there without any damage. as much as he could, they are necessary . it is next to his family and next to his own
11:19 pm
property. to these units we delivered the rebar, we delivered the cement, they themselves, according to their own taste, in cooperation with our respective supervisors, who determined the solution there. some of the areas are gaining altitude, these are our villages, the weather is still cold, but the ones that are at a low altitude, i was talking to my colleagues, knowing that the weather has changed, the weather has allowed us to pour concrete, and some of the units have been concreted, and we
11:20 pm
have started the debris removal process. a land that ends by eid, but i'm not a garbage collector, it means that the weather is cold there, you have to see the permission to pour concrete. now let's assume that we have 582 units and 582 units of rubble removal. let's assume that the weather was good. all this is being produced now. the rubble has been removed, and you don't instinctively put concrete in the villages that are in the heights. it doesn't mean that we, for example, the machines of the provinces, let's say, isfahan, hormozgan, we were not in the mood to call a meeting of the provinces. we are now the main issue of minecraft, iman milgerd, and we prepared one foot there. to beautifully, within the next few days, we got statistics from the meteorologist who said that the weather will increase and the village will officially start
11:21 pm
, so now the process of removing the debris that we have to remove will be finished. let's add up to 15 specialized questions on the notice sent on the way, and i said that this amount is enough for the discussion of debris removal, free of charge or facilitation of payment, when will it be implemented? look, in the discussion of reconstruction, the approvals given by the honorable government are always not sent to the central bank. to the operating banks he informs that usually a process of 20 days a month takes time, but regarding the discussion of loans and three out of three free packages , there is no way to restore the limp of these credits, or internal sources, that now the skeletons that
11:22 pm
are now available to the people are the same skeletons from the internal resources of the housing foundation have been secured and the cost of these skeletons is in the hands of the people. the cost of these skeletons will go free of charge from the people after the loan and morals have been announced. there is a need for repairs and so on, a sum of money from internal sources the foundation will be provided to the affected people to repair and find accommodation immediately , and the amounts related to the government's approval must arrive, and i feel that within the next week or two, the loan will be notified to the operating banks, and the loan will be paid and raised. in the next week or two, it will be notified from previous experiences such as the specifications in kermanshah. one of the challenges was that the notification
11:23 pm
of the operating banks was now some of them had so much cooperation and better cooperation. some had a lot of cooperation with the latest company. bank facilities too do something, give your hands to your order, when i can refund the process of establishing the housing foundation license from 21 april 1958 until today, the housing foundation has been in the discussion of reconstruction and in a way it has experienced these things many times, that is, you regularly see some banks that a the amount is slow to move, we usually refer to them and ask them and other officials, again, i am begging some banks, and honestly, as soon as it is notified , they pay very quickly
11:24 pm
. governments usually cooperate in paying grants, i pay quickly , we are sure that within free payment in the next few days it is possible that the free compensation related to the earthquake on october 13th and december 27th will be paid by god. now there are 250 villages with facilities with 60 million free of charge. free windproofing, cost received and windows, doors and windows of pasargad found a numerical refinery
11:25 pm
, a unit can be built completely, according to the provision of facilities provided by the government or not . i am from god, that each of them makes a familiar unit of 80 meters by 85 meters mr. khosravi has a very good cooperation with our dear villagers, that is, the supervisors and colleagues of the housing foundation , the dear villagers are really like brothers by our side . which we negotiated round and round, and in the future, our dear villagers, if they find the financial means , they can stick to our memory in the park, but good faith in effective construction cost management and the efforts of all colleagues to give good advice to the villagers, thanks to the efforts
11:26 pm
of these dear ones, they will be able to build their units. build and enter the units should be established, because the house has been destroyed anyway, if this unit is not finished, it will be difficult to say, the families themselves will also be in trouble , the reconstruction of the parts will be difficult for me, so we are doing our best with these facilities and the help that we were from different places, it was always like this . that i saw in this program really
11:27 pm
the place of thanks for the various and nationwide assistances for the people of dosheh, it also conveys the generosity of the other people of our country, it also conveys the interest of the people to the people affected by the earthquake, and in the construction of the building, both loved ones and benefactors have been referred, and they will definitely help them with this facility. and there are many facilities and founders who help in hasan square, practically there is no one who has an almost complete unit who wants to charge you extra . we should be able to compromise the style of multi-story buildings let's manage and build the building with this free loan
11:28 pm
. governments should do this. it was 8th of february, 28th of december, under what conditions was the house between 13th of december 28th and 8th of february in ten days ? and the man and the statistics of 28th of bahman are under repair and currency. on the 13th of october, when the earthquake occurred , the reconstruction operation was going on with strength, and his dear people were damaged on the 13th of october. the number of them has run out
11:29 pm
, the number of settlements has reached the final stages good approvals were also given for rescue, and it was supposed to be given to these dear ones, if the borrowers are on time, the supplementary bracelets will be given a loan because the distance between two earthquakes is not much, that is, the same facility ceiling that was considered for the recent earthquake as to be supplied and 13 mehr completed, in which i found the number of my heart from 1100 units to 1100 units . the thin stage
11:30 pm
, god willing, i feel that we ourselves are the same that these dear ones until eid are mostly knowledgeable about the people affected by the earthquake, mr. dr. khosravi, because they are regular there, and again, they are the basis of the card, and they are very easy to talk about the hours, and this is much to the progress of the work. there are and i want to play the game quickly and this is a very important item that the people themselves should do the work. the process of reconstruction is also a good process, but i would like to say that in any case, the construction of a residential unit takes time, no matter how hard we try. 34 what are the requirements and methods for building a unit? if someone has corona virus, he can
17 Views
IN COLLECTIONS
IRINN Television Archive Television Archive News Search ServiceUploaded by TV Archive on