Skip to main content

tv   [untitled]  IRINN  April 18, 2023 1:00am-1:36am IRST

1:00 am
1:01 am
[000:00:36;00] the land of sweet traditions, welcome to the news, and the patients are the ones who pay for the medicines. the minister of health announced this and said that the medicines that reach the patients through the doctor's visit and the electronic prescription are cheaper than the circulation system and the medicine is not calculated at the free price. drug pricing, according to the law we have in relation to drugs and edibles, in fact , we have a 36-month pricing commission, article 3, which i always do permanently, according to this commission, according to the information that has been given to the commission it is possible to set a single price for medicine and equipment it means that this
1:02 am
price is the same in the whole country. one of the good things that we have in the field of the ministry of health is that these systems are shared. it is not possible for a drug to have different prices. the drug has the same price and is sold at the price of 10 of course, we have always requested all the dear people to express and actually request to do it themselves through the electronic prescription and to see a doctor . they can visit on wednesday, april 30 the organization's information portal at www.sanjesh.org emphasized that this is not the last chance for applicants who failed to register for this exam, and it is obvious that
1:03 am
no application for registration will be accepted from the above date. the national exam of the second round of 1402 will be held on wednesday and thursday, july 14 and 15. the new 16-valve engine production line for new saipa cars was opened. iranian sandro is also on the agenda automotive industry is transitioning from old generation engines such as m15efs and tiofayo to the production of new engines in the movement of this line, the most modern
1:04 am
engine manufacturing line in iran, under the control of the percentage of robotics. with the launch of the production line of 16-valve m16 engines, the daily production capacity of 610 new engines has been provided , it has a torque of 150 meters, it produces 115 horsepower. work of the automotive industry data and safety, which are very important, after this, let's pay attention to the issue of fuel consumption and new products , our main axes in the discussion of quality are the second axis and productivity. this year, the iranian sandro is going to enter the market. later this year, the complete product is on the way
1:05 am
to order parts and standards. the production of pre-sold cars, which will be produced in iran, according to the initial agreement, the car may be produced in russia. the 4-cylinder in-line engine that is produced here also passes the euro 6 standard in terms of fuel consumption . 69 feelings for the internalization of these engine parts. they are involved together and it is supposed to be this summer , a number of saipa group's new products will be equipped with these engines. from artificial intelligence, it shows their reaction in the face of an earthquake , and we study the faults and faults that we routinely have
1:06 am
, we perform a series of measurements of the building, or we adjust the position of the columns using a schmidt hammer. an example of the steps was that for seismic health monitoring of dilapidated buildings used to be used. now, with the construction of this system, the single-stage multi-stage foundation consists of two coins and a series of sensors. the system is placed at a point with specific coordinates inside the structure. it vibrates and accelerates with the help of several sensors. it begins to hold a building weighing more than 20,000 tomans and 18 floors with the same shape. the vibrations can be felt by humans. the analysis of the building data becomes accurate when the technical knowledge of the speed and range.
1:07 am
the existing diffusion in each structure is localized injection it should be done correctly, from the point where you create the book in the building to the point where i have different design arrangements to the point where you are determined . carrying out a system that does not have a foreign model, and the design of the data collection system and digitizer and its software are completely domestically produced, a system that was tested in dilapidated structures before assembling the geisha bridge, the geisha bridge has been fully studied, the west tower of esteghlal parsian hotel in fully studied earthquake health monitoring system these structures are updated after each operation, using the closing method or using deep learning packages so that the software itself can
1:08 am
evaluate and present results according to the law of knowledge-based production leap, the development of such products in the construction industry is on the agenda of the company. according to officials of the natural resources and watershed management organization, at the same time, the watershed management operations in the flood-affected provinces of lorestan, kermanshah and ilam have reduced flood damage , along with the reduction of damage and soil erosion and the introduction of flower arrangements to hundreds of people. has prevented according to estimate of crisis management and reduction of agricultural risks, the recent rains and floods caused 3365 billion tomans to the water and soil infrastructure of livestock , poultry and aquatic farming in lorestan province, kermanshah, ilam and
1:09 am
fereydunshahr city, economic damage in lorestan province was 54 mm and the volume was more than one billion cubic meters of rain, 20% of it should be penetrated by water catchment structures and underground aquifers, we had more than 120 thousand hectares in water catchment operations, 340 million cubic meters in kermanshah province also caused floods , but water catchment measures reduced flood damage, water catchment operations in urban areas and rural 14 cities of the province followed, and in the recent rainy system, these measures prevented soil erosion by 1,200,000 cubic meters
1:10 am
.
1:11 am
annabelle and the continuation of her faith in ilam province is also 373 mm pure and unknown at 2 o'clock. greetings, courtesy and respect. to all the dear and respected viewers of meiz ekhtos program , we had in the news that the implementation of watershed management projects was able to reduce the damage of 30 to 70 percent in the provinces that it has been mentioned that we want to pay for the flood damages in economic planning, we will take a look at the promises made by the law, how many watershed projects were implemented in these plans , how effective they could be, and the economic dimensions of the damages that you sometimes had about the past . before we enter into the discussion, my colleagues from kermanshah , we will see how to prepare a report for you in this regard. we will come back and
1:12 am
be at your service. it is kermanshah due to the intensity of the susan rains in the mountainous areas of kermanshah, we are witnessing the flooding of the watershed structures, these structures have a delayed state , and to prevent this, about 38 watershed structures have been created in this area, and again, the 43-inch 560,000 cubic meter part has a mirror in it. it is filling up if this amount of flood enters the city, which will definitely cause problems for the citizens, considering the volume of recent rains, these structures have done their work to the extent of 30 to 40 cubic meters per second . it has been created
1:13 am
, the installation of bratti and diversion channels has been done this volume has been reduced to about 8 cubic meters. in addition to this episode, flood control in the north of kermanshah is also a way for water to infiltrate into the soil and strengthen the underground aquifers. we have seen the report of my colleague, mizan vaheed, deputy director of watershed management of natural resources and watershed management organization, mr. piri kolani and mirzaei from ilam , kermanshah, lorestan.
1:14 am
communication with the reporter of the agricultural sector of the sda news agency, mrs. heratian, the latest statistics on how many summer spots we have in the country, separated by cities and villages, and separated by the more critical points and the lack , in the name of god, the most merciful. and i wish to accept your prayers and worships in the country more than 25 million times , i will change our watershed, which needs watershed management measures, which can cost approximately 123% of the price of this area. aziz and north kermanshah province from the commanders who it also had very good parts that more than 450 cities and 8650 villages in the country are exposed to flood damage and this
1:15 am
city and village and 2011 crisis , there are more than 10 million jobs in tehran, the seventh grade has average conditions, mina is according to the latest statistics that the research institute soil protection and watershed management and entering 98,000,000, i can almost tell you that the amount is less, but the dimension that exists is that, well , the set of factors of sohail sadeghi's senses will bring in a lot of quran. one of the most important parts that comes in is from soil erosion, which unfortunately in our country it was not a good season, 15 and 4 times the world average 14 people in the work of season 6, let's dream that with a series of watershed management measures
1:16 am
, up to 70% of olsen's drug damage can be achieved . how much watershed management have you done now? to consider critical and critical situations, but the point that 20% of the knowledge and the point that exists is that the set of actions that have been done so far at the level of the watershed area have been done well, considering our conditions, that is, a 30% reduction of at least we had 70 through to the result of being this good and fraser, in many people's year 12, the aqueducts without aqueducts have doubled to three times in discussions about balancing the water in the table, giving millions of cubic meters of underground water shortage in the catchment area , the crisis in the health sector to rouhani, despite the fact
1:17 am
that he is now in a negative state. watershed management measures have created negative and positive conditions for the situation, and where positive results have been achieved in the areas, we can see on instagram that it really creates conditions that both a good carpet and a house , as well as the protector of golestan, have been done . they arrived that almost 45 45% of damage was not done in the area the rain turned blue until it was the same and
1:18 am
destroyed . if we want the economic effects of the economic project of besanje cooks projects, that is, in about 63 billion cubic meters of turtle, with the implementation of watershed operations, we can spend three years in the issue of erosion control , about 800 10 million tomans, we can control the season , 468 million tomans, we can use baby it costs more than 10,800,000 tomans to make it out of iron. the total economic effects that
1:19 am
you can have is 477 times the cost compared to it . let's get to the definition of its cost and benefit or the seventh grade of lesson 10 times five times the economic effects of each unit of your investment. 5 times and economic to compare the approximate data, we talked for 5 minutes about the very positive and good effects of faizi , i spoke to the interpretation of the qur'an and the numbers show us what kind of company it is. or the lag seems severe in this context, there is the most important reason the beginning if you want to tell us what the viewers are that the light is behind the financial credit only and only credit because the wind
1:20 am
is now 18 million books of study done in 2019. it was done. moving towards satari highway, three million tomans in the fourth grade of studies equal to three million tomans should be careful of poisoning time, but in the form of the seventh and eighth programs , you have written "get up" with one of the jihadi programs, which was included in the program that was closed, and in our seventh program, about 40 million hectares to be implemented it has 45 million card to card and in program number 25 peugeot 207 bama engine and in total we have 78 observations about the program during the program. we can see how
1:21 am
much water is needed. 737 and let it be hidden that the economic value of the prophet in the laboratory package will cause erosion and sedimentation for us , amounting to 3493 mats with 739 men and 247 names . you say that there was another reason why akhzari was late
1:22 am
ok, we had a lack of attention to mismanagement in the 41st chapter of the watershed studies book, we had 18, it has been implemented, which is basically the governance that is discussed at personal expense, the important question is that the cost is only if it has enough credit, now we can say that we can in the seventh and eighth plans of the government the recent percentage has paid very good attention to this issue and the set of credits that intron had in 1401 was twice the amount of credit that was in the sectors in 1401. the government's attention to this issue was very good . sima on the line please communicate with mrs. heratian, we are just discussing whether all the problems in the irrigation field can really be reduced to credit financial resources or there are other challenges and
1:23 am
how long will it take to complete the remaining 90 million hectares? which is done on average in the country, where these projects are implemented in wet water , so we should not just wait for government credits to put water in its place, but the cooperation and participation of the people of the local communities , especially the watershed residents, those who live in the watershed areas that has a significant impact on speed carrying out the changes in amirza. thank you very much. mrs. heratian, reporter of the agricultural field of lorestan tv news agency, mr. mirzaei, general director of natural resources and watershed management of
1:24 am
lorestan province. and the crisis and now the watershed operation has been done for more than 40% of the steep mountain that is over one million and 400 thousand memory 128, nearly half of what we need to do, we have worked and we need it, god willing, this work as they said by injecting people's participation and people's participation
1:25 am
add in order to complete this work and what he says is to use people's participation, do exactly this so that we can attract more financial resources , we worked well for sugar cantaloupe and now start the collaborative work with the quality of 50% i am doing work. he did 50% of good deeds to water down the issue of people's luck . the people themselves realized that
1:26 am
we can improve the living conditions in our own region in shahriar khiyar region. save that your breakup discussion should look like that anyway implement this economic model so that people can invest and have capital until you reach your financial resources , it will be implemented.
1:27 am
the title is now the different plans that we have, the economic soft war fronts, the cells similar to sarai martaba, we have to do, the dead taliban , we have done work and throughout the country , this download is also in our province. we put 400 hectares in my fields with participation in the field of green space development and specifications and watershed management, how much do you say
1:28 am
has been done in it, how much has the investor come, how much should you do with rapidity like in the past, in the watershed area, we are at your service this year. of course, he started working, but it was two billion tomans. i was there when he was betraying, but we want to talk about economic cooperation and investment and return of investment. anyway, from an economic point of view, you said that he came to invest. if this happened , please tell me that they are drowned and have no sovereignty. and only
1:29 am
let's have an economy. maybe in the place where i am working , we have minutes under your hand . in fact, you can see the effect of this work. but the important thing is to really open up to the economic resources of the biosecurity trip . that the
1:30 am
financial resources of the waist itself are the model that should be invested in the sector the private sector should come in so that it can help. government aid is your definition. are you in the center of politeness and awareness that this economic model that khabar hasha says lacks financial resources, with this trend , mrs. heratian, for example, is taking too long. how much private sector contributions can we use until the watershed management operation is completed, and if it is used , what does the number say? i like them, i am interested that enter the sector and in the form of social responsibility of the companies from this service as an economy in social consumption, it helps and
1:31 am
it is not to a large extent. the point is that we believe that the role of people's participation is a very constructive role in this field. it has been established in the form of a popularization program that i should have without a history of butchers and self-exploitation and films and in the form of mortuary permits and rights holders in two market sectors, etc. he said to install it in the form of multi-purpose projects multi-purpose areas are being prepared now the economic effects of the dis group have internal measures, one of the economic effects and medicinal plants of the tourism area , at your service, friend, we have reached the economic plan of the forests of the autumn forest in the theme of the restaurant
1:32 am
. the frame of the simple and structured model of multi-purpose natural resources, which awakens financial and economic affairs in accordance with article 3 of the law on the protection and exploitation of forests, pastures, and we are currently managing it, and about 6-7 million of the government has been divided into 12 years, the government has taken root. for men we have written various models all over the country. in the people's participation section, like last year, in the description of the desert, it is about 80,000 hectares. or is it your service? after
1:33 am
that, i had a cooperative work. today, only in the description section , let's pray together. god is multi-purpose design. forestry plan has happened by itself, and in the form of investment and in the form of three punishment laws, it is our duty to be able to manage this set of plans to the welfare system of munster's farmers, suitable for the current situation, whether it be exploited or reformed . my service is affected by a car accident yes, the government has help in the duty department, which has cost a lot of money. it is related to the collection of diya . they can participate alongside the people . i want to go with the main enemy . tell me how much targeting we should use people's participation. let's say in iftar that
1:34 am
it was written about the category of my catchment area, about 5 million, which one would you define? 10 million hectares of bahram basin, what can i say, that we can implement this program in partnership before and after, god willing . we are and even hello please let me know how much the effects of watershed management benefit in the province.
1:35 am
we have done practical work and it is being implemented. how much could we prevent damage in the cell area by implementing watershed management operations ? about 40% of the area of ​​your province is not prone to flooding. infrastructures it damaged the city of ilam. after this flood, we came with the watershed operation that we carried out above the city of iran, and fortunately, in 2018 , fortunately , we had such damage to the urban infrastructure of iran, and the same situation in the entire province in the urban areas that
1:36 am
in the upstream of the city of staneh and we have observed that the watershed operation is effective in protecting the infrastructure facilities as well as people's lives and property . it was the month that the president giving an order to prepare and approve an oval to start work, and 89 months have passed , this has not happened yet. where is the work? before this, it was better to write it in the form of a

21 Views

info Stream Only

Uploaded by TV Archive on