Skip to main content

tv   [untitled]    July 18, 2023 1:00am-1:31am IRST

1:00 am
[000:00:00;00] call 021 7108. in the name of allah, rahman, and rahim. hello, an iranian researcher has succeeded in designing and manufacturing a microfluidic optical biosensor that can be used for the early diagnosis of prostate cancer. according to the announcement of the university of tehran, the nanoparticles of this biosensor, in addition to
1:01 am
having optical properties, can change in the field. they also respond magnetically and they can be used to separate and focus on surfaces. this biological agent is also used in the fields of environmental medicine and biochemistry. the world health organization announced that the sweetener aspartame may be carcinogenic. the organization of the amount of consumption allowed is one of artificial sweeteners in diet soft drinks, gum and jelly from about 2800 mg per day, according to the al jazeera network, the world cancer research center, which is the arm of the united nations in cancer research, announced that it has new findings that are related to a certain type of cancer. it refers to liver cancer and the use of this substance . this scientific center suggests that detailed investigations are necessary regarding the use of this drug. qaqan is a
1:02 am
knowledge-based company that succeeds in industrializing the equipment required for the implementation of the national plan to reduce the transmission conductivity and recycle gasoline vapors. of daily consumption 100 million liters of gasoline in the country, one and a half percent of it becomes steam in the cycle of production to final consumption , which is supposed to decrease, converting gasoline vapor to gasoline is a scientific process that has both an environmental aspect and, of course, an economic aspect of steam and 104 conversion. it liquefies and turns again, so to speak, and it easily evaporates and its vapor spreads in the air as a pollutant. during the transfer of fuel from the refinery to the car tank, thousands of gasoline vapors are produced every year, and this gasoline liquid becomes an important waste. there is
1:03 am
water as a plan for the country's fuel capital in 2087 melli was approved by the government board whose task is to minimize steam to a knowledge-based company in isfahan. it has succeeded in the process of reducing the transfer and recycling of gasoline vapor, that is , to completely localize water . daneshbanian company implements gasoline recycling in several stages by designing and reproducing refueling equipment . this whole plan is to suck gasoline vapor from the dispenser housing. the steam comes from the second wall
1:04 am
inside this and collecting and inside that samira stage plan , it is liquid and goes inside the home of the gasoline vapor recycling project of danesh banian company . it also has a patent certificate. this factory has the ability to develop and equip more than 1000 places per year. it was not compatible with us. this product produced by danesh bat company is more effective than imported products, because the managers of danesh banyan company say that the research obstacle of their plan goes back to more than ten years ago. it has created employment for more than 40 people directly and more than 130 people indirectly. mohammad ali isfahan radio and television news agency museum the religious arts of imam ali (peace be upon him) in the capital host an exhibition of quranic arts with the theme
1:05 am
of contemplation in surah rahman. the exhibition will be held on august 14th from 17:00 with abbas 93 in various fields of art, including painting, calligraphy, illustration and handicrafts . quranic arts centered on surah al-rahman was opened in the imam ali museum of religious arts. there are four chapters of the quran, each chapter is dedicated to one surah, and for the spring season it was surah al-rahman, and the exhibition was held in this exhibition, with 90 works in the fields of painting, calligraphy, illustration and industry
1:06 am
i worked on the display of this work in the form of my kaaba, and i worked in the form of gold leaf , and i drew wheat in the middle. 5 nationalities of five companies. quranic arts is about the influence of quranic concepts and works in the society. speaking art is the common language of all human beings. all human beings really work for them as an art form. communication should actually be created and they should have a visual understanding. the art of beautiful love can have a good effect on the audience with this art , you can make the quranic concepts more beautiful and pleasant
1:07 am
ter told the visitors that he was interested in the quranic works of this exhibition. i thought the variety of the works was interesting and attractive. the different formats and styles were very interesting. it is in contact with a high level. friends who had the pleasure of participating in art. this exhibition will be held until august 4th at the museum of religious arts. seyyed hossein mousavi .
1:08 am
it is never too late to turn to what we have not done it is not related to education, creating a new job , starting sports, and at all, this is the modification of consumption habits, area management, a small part of people consume outside the consumption pattern, and first of all , the consumption can definitely go back to ordinary electrical devices inside the house for lamps. this is 90% less than before. part of the electricity consumption is due to the device that is not used in standby mode, sleep mode, coffee maker and tea maker , microwave, hot electric devices that also consume electricity when they are off. and when
1:09 am
we don't need it, they have to be unplugged sometimes i'm in the bathroom, but you can see the fan , we leave it on for hours, so that your consumption is much more islamic. the environment and vital resources, many people have to speak, but they were not with the people . there is a question of use in the field with their reports. the moment of delivery
1:10 am
of strategies and afghani, the consumer market and arbitration with you, the first page every night at 7:30 p.m. and i have courtesy and respect for all viewers at the 10th economic table, which was seen and heard in the news, with the presence of president mr. raisi in kohgiluyeh and boyer-ahmad dam and shamsher power plant, which is also called the loudest voice in the heart of west asia , we have put the first power plant into operation, which
1:11 am
has approximately 15 thousand billion tomans of credit. more than 95% of exploitation has been achieved in the economic desk, we will check the technical aspects of this exploitation and also the impact it has on the regional economy. hamdani communication in the creator of the program that i will introduce to you. hello everyone, i want to ask you what was the necessity to start this national project and press the button in the name of allah, the most merciful, the most merciful, and may the condolences arrive.
1:12 am
moharram hosseini, to serve the noble people of iran very, very well. you said that we will deliver fresh water to the persian gulf in the amount of about 200 to 300 billion years , so that the persian gulf will be deprived and the people of three provinces will be deprived, both kohgiluyeh and khuzestan provinces will be dammed. cham milk to improve and percentage of agricultural water supply in order the primary goal of the work was to improve the conditions of agricultural water supply in around 85,000 hectares of land that are prone to high consumption in the region, which means that their income is at least 40 to 50 million tomans and they can earn something like 3400 billion tomans annually
1:13 am
, so this employment income could not be taken into consideration. based on this, the implementation of this plan started in 2009. the conditions of progress for ten or eleven years were not favorable , but about 70% during the last two years in the popular and revolutionary mr. dr. issa. about 30% of madullah has progressed today we were opening this project at the limit of exploitation. you mentioned the opening and exploitation of a series of events. if we are successful , i will be present again. mrs. jafari, please tell me what happened today .
1:14 am
it is possible to give it to the name. yes, hello. dear colleagues and viewers of this section , this morning, the president and some members of the government delegation were in yasouj. in the second round of provincial trips, the most important programs and the projects that they will follow are economic projects, including charity, which you do not have in the program, but before i go into some details of the book, chamshir dam and iraq , i will mention the titles of mr. raisi's programs. the first program of mr. raisi's presence in the community and people of the nomads of this province had doubts in this meeting and intimate conversation with the nomads, who pointed out that their issues and problems will be solved, including the issue of electricity supply through solar panels, as well as
1:15 am
the completion of health houses, among other requests of the nomads. it was the priority to pay attention to supply and we are domestic products , red meat, and this problem will be solved. it is our right. the guests of your program mentioned that solving the water problem is specific to the agricultural sector and with the opening of this project, the water problem of the people of this province will be solved as well as bushehr and khuzestan, and in the first stage, five and a half gwats were put into operation and it is one of the most important projects. and the most important dams in west asia are included in the plan
1:16 am
next, mr. raisi, gachsaran petrochemical field, one of the important projects of the oil sector, a project that had been on the ground for 17 years and provided nearly 3 thousand people with direct job creation, as well as the executive operations of the mukhtar gas field , was put into operation today, which i am at your service. i am here in an hour, mr. president, i have other plans, one of them is the revival of the yasouj sugar factory , which actually returns to the production cycle after 7 years , as well as a meeting with the people in yasouj, as well as organizing a meeting of the provincial planning council, a meeting with economic activists mrs. jafari the reporter of the government field of sed and sima news agency reported to my colleagues in the energy analysis of sed and sima news agency that we will see you come back and we will be
1:17 am
at your service. controlling the seasonal floods of the region and producing hydroelectricity was done. the region experiences huge floods that go towards the persian gulf from this route and enter the open seas. venus, which is visible from the heights of fars province, was not suitable for agriculture despite the presence of salts. 99 per hour blue water is in dire straits. how long has it been? the year of completion, the farmers of the region are waiting for the establishment of ostad shamshir, which in the agricultural season and before the cham shir dam was drained , there were concerns about the possibility of water salinity after the water was drained . we measured
1:18 am
1690 ramsar centimeters. it is the city of gachsaran and will transfer more than 85,000 hectares of downstream land. the largest hydroelectric structure being built in the country with the goal of storing 230 billion cubic meters of water , the cham shir dam and power plant was opened today in the presence of the president and the minister of energy. my colleague's report. together with mr. almas's patient, they were referring to how much does it help the economy of the president's regions today in his meeting with the nomads
1:19 am
? in the first report, it was wrong to say that the first unit of five and a half megawatts, 5555 megawatts, was put into operation. your question was attacked. we have 85,000 hectares of land. in fact, there is no agriculture in the downstream, which was only able to be cultivated in one season, and it was then about it was winter and early spring in fact, with the beginning of the hot season, the quality of the river's water decreases and the flow rate of the river decreases drastically , for example, right now, bodi mohsen is 107 cubic meters per second, and this problem made it practically impossible to do agriculture in the downstream , and at the bottom of the number how much is the average rainfall in autumn in iran, 35 to 40 cubic meters per second, with a very, very favorable quality, in fact
1:20 am
, in the beginning of the winter season, it starts from january to the end of april, the ninth grade of arabic literature is flowing at home, it is natural that we too in the summer, it could be killed by building a dam cham shir and the discussion in which the main word is heard only in the red blood cells, there is no word in all the lower regions , in fact , they are the mother of khuzestan province, and this is the issue of the exploded sword of all provinces, with this reduction in quality, what happens in the summer can be he did not pay attention to these very large floods that were of good quality and could not be used during cultivation . what do we do with them? i'm talking about
1:21 am
the entrance to the tank, i'm talking about the floor, while the dam is cham the lake discharges twice as much as 14 cubic meters and discharges 12 times, which is a very, very effective ability to improve the quality of the venus river in the future . in fact, consider that once the income of the people of this area will be doubled , there will be 85,000 hectares of cultivated land. how much
1:22 am
time should we reduce until the river actually reaches the persian gulf in the summer? it took a long time, what was the reason and the fact that you said that 70% of people were done and this 30% was done in these two years . it was very good, the actions and planning were not done until the financial and administrative conditions had an effect, but in the government of mr. dr. raisi, we witnessed a strange transformation and transformation
1:23 am
and 114 according to the needs of the people in different sectors, especially the first sector. we encountered the name of water-supplied jihad in villages and towns was the ruler and to provide this work, in the field of agriculture, our dams are reaching the stage that their goals are to be provided. the work is a big job, that is, it started last year according to the plans that are controlled on a weekly basis, and the meetings that mr. engineer mehrabian
1:24 am
holds every week are the priority design meetings, and the progress of this project up to these friends , which you said, is 30% in some projects. hamedan provincial competition had about 30%, but i had some boys who finished last year by nearly 70% within one year and andy or ghadir project has progressed by 45% in less than ten years, but thank god, inter was put into operation and the people of khuzestan and the cities of khuzestan benefited, i believe. it is a financial aspect, it is a motivating aspect and a jihadi work. how much does it cost on this side of the sword of the sword plan? it is financed by the chinese dollar. part
1:25 am
of it is your own commitment. now, the ministry of energy can tell you how much you have to hit. how low is the gut? sir, usually 85%, 500% provides about 15%. and in the previous government, in fact, 300 million dollars euros and dollars to toman money, roughly how much was the investment in these two years, and in these two years, when most of the mistakes were realized and started, in fact, the operation of the operation, according to the price that hazrat ali has about inflation,
1:26 am
how much is the cost? you were on vacation for a long time in general, is it true or two-year seedling in 72, 93, from 94 onwards, advanced leave incorrect from 95 to 95, 96 to 99, what year are the early memories and ways of relief related to which period ? in fact, the financial transfer had a problem and was stopped, and now the progress percentage of the whole project is 4% what can be done about the details, which usually do not meet the requirements of operation and dewatering , but the monthly forecast, for example, between the next 6 months and one year , the entire cold execution operation of 11,000 cubic meters of concrete
1:27 am
in 50 models is not very important. it is very high. it has been dewatered just now, as you talked about, and 154, 50 meters above sea level and dewatered and 60 meters , it has a significant volume, we have 500 million cubic meters of water , the cold back is 18 billion , there is still a long way to go until we reach the taj reservoir better, so in fact there was no reason for water extraction measures he says that 500 cubic millimeters will be too much for us, brother, don't be too happy with me , because if our capital is 15 thousand billion tomans , it means that if we buy water at average prices, the price of water if we use sea water desalination at high setting is 13 kilos . yes, if we take an average and put 30 thousand tomans in different banks
1:28 am
, it is 500 to about 15 billion tomans with the accumulated water capital, and if this water had been withdrawn in the previous year , the flood would not have been controlled. my husband, who removed the heavy-duty shadow, i mentioned, serve you annually, close to 3 thousand 400 thousand 500 billion tomans should be earned by the farmers, these are the people and their souls , it is a completely economic plan compared to the costs, from the social point of view, from the social point of view , considering the conditions of the region, it is very good that mr. bozar sarma we have 800 mm of rain in the main branches of inter and 800 mm of rain. it starts in sarkhes in fars province. 900 mm of rain caused a flood
1:29 am
along the way. with the creation of this clock, 8 billion cubic meters will be contained . the flood damage will be reduced to a minimum. it will be reduced to a minimum. and that of these series that entered the gulf it was fars and we used it, and we also have agricultural land to produce electricity, there are 482 gigawatt hours per year in jamshir, mr. fazli pointed out that one is the improvement of the quality of the water that the people of tehran use.
1:30 am
and the truck starts from them, and we have lower eyes, which refers to the existence of quality and is related to the volume of water or to the quality, at the foot of the dam, and it was reduced depending on the base flow. when these eyes were added, agriculture was possible, that is, agriculture in the summer season was possible. on the other hand, it is the winter season of agriculture it was done that we didn't have any structure to restrain iran's weapons, this major part of the flood would be out of reach and the farmers could get a very low percentage of supply. the ability was created that both the percentage of their first supply they say fall or second fall and they say 100 percent guarantee and exchange. no. 91 of summer cultivation should be added to their country, which is actually

12 Views

info Stream Only

Uploaded by TV Archive on