tv [untitled] August 15, 2023 1:00am-1:31am IRST
1:00 am
[000:00:00;00] 1065 7210 sogand shoes mullah rahman al rahim hello, the researchers of tarbiat modares university succeeded in using a biocompatible compound to make medical staples, which reduces the effects of water cut. medical staples are equipment for closing wounds that are widely used in plastic surgeries. according to the report of tarbiat modares university, the installation of equipment with a new combination made on the basis of biocompatible polymers
1:01 am
, the results of the tests showed that the innovative staples do not pose a risk to the survival of cells and do not cause severe inflammatory responses, research in the scientific community and experiments by scientists their physics on the verge of discovering a new force , according to vion's report, gravity, electric force, strong nuclear force and weak nuclear force are the four fundamental forces in nature. the name of the medium is inspired by the common model of particle physics in the left alone. the researchers believe that the reason for this problem is the force that moves the medium. they are formed naturally after the collision of cosmic rays and the earth and are similar to electrons. this
1:02 am
theory the proof can be the most important scientific achievement since the time of albert einstein's theory of relativity, the winners of the 14th science and nanotechnology student olympiad have been announced. the final third stage of the olympiad was held for 12 days at iran university of medical sciences . in 2010, the poet decided to register in the olympiad and the first and second stages were held in the form of a theory test, and a student made it to the final stage of the olympiad. this time, instead of solving theoretical problems , they had to produce medicine in the laboratory of iran university of medical sciences. this
1:03 am
for 12 days, they tried to synthesize a nano drug in the laboratory and check the release of the drug and its effect on the treatment of cancer . the company is from the city of saqez, kurdistan province, and in different ages and eleventh grade, the teacher's experimental field, the students of the tenth and eleventh grade, the eleventh grade, the twelfth grade, the experimental grade, the seventh grade, the experimental grade, the twelfth grade , are now looking for their future in the field of nanotechnology. i like i am choosing material engineering, which is more open, gilan, and i am interested in studying pharmacy. with the support of the authorities , it can be brilliantly realized for the winners of the olympiad. we at the elite foundation and who
1:04 am
can promise that the support and for these dear ones, we should support them as much as possible from other olympiads that have a global version and the world olympiad will be held. we, the selected ones in the olympiad , will receive awards that will be given to them after they enter the university. particle for direct object we have support from these empowerment courses for them to bring their ideas to the stage of prototype products and then the next stage of commercialization in the year . and empowering them to play a role in the nanotechnology development system was held. mohammad hossein haji, sda news agency
1:05 am
, indian researchers have developed a new building vehicle that can help people with mobility impairments to travel long distances and pass obstacles. voa network report, the device, whose name is called, works like a motorized vehicle , users changed its use by connecting the motorized part of the wheelchair device, the users use it for long distances and steep hills, these mayor chairs according to the characteristics and the health assessment of the user is personalized and they have a good physical condition. it also has all the necessary features of a vehicle on the road. climate change has been effective in reducing the number of elephants . the loss of habitats
1:06 am
threatens the survival of elephants. al jazeera tv channel we see england together in this field. illegal pottery work, the loss of discs and the mistreatment of elephants' food, have put the elephants at risk. with 50 thousand tomans, they are in greater danger in nature , or the executive director of the elephant protection center against extinction says that the elephant population is facing many threats, and investigating what factors have caused us to lose what we have and what can be done. to give because we are to maintain and ensure that the no it is time for the elephants to decline. one of the things that we have seen in relation
1:07 am
to the decline of elephants is just because of climate change. they were able to manage illegal hunting, of course, there are other emerging issues like last year about climate change, which lost nearly a thousand elephants, and this is simply due to the impact of climate change and drought , as well as issues related to climate change. it threatens human and wildlife resources scientists have warned about the danger of destruction and about two-thirds of the himalayan glaciers in the next 80 years. according to scientists, this issue will cause a water shortage crisis for millions of people. pakistan is one of the highest peaks in the world located in the north of pakistan. this is a rough land with little land for shape.
1:08 am
environmental experts warn about a potential threat caused by climate change. pakistan pakistan has huge natural glaciers, very important nature, and the volume of water that comes from the melting of glaciers is very significant in terms of quantity and undoubtedly has unwanted effects such as it will bring floods and landslides, which will affect the lives of the people of this region. to the tourism site in this region of pakistan , they must find a way to make a living, which is usually in the form of planting cherries, apricots, and the water needed for gardens from huge water sources. it is newly supplied from the place of natural glaciers that are melting. these glaciers are a source of life and livelihood for many people in the region and create fertile soil for cultivation . they are minerals for the heat of the sun for big entrepreneurs. the land helps because the climate changes of natural glaciers at the speed of b
1:09 am
history is melting and this means dangerous floods and lack of water for the mouths of millions of people all over pakistan and many people in this region climate change is a threat to their existence . this village is worried that the melting of the glacier may wipe out and destroy everything. if the glacier was far away, but now it is closer, so we are worried that there will be a flood , what can we do? we have nowhere to go until now. we have lost hundreds of trees and many crops it is possible that many of these glaciers will disappear completely in the near future, now the question is whether countries around the world will take this threat , act to reduce greenhouse gas emissions, or turn their faces in the other direction,
1:10 am
1:11 am
. in the towns and industrial areas of the country it happened in different provinces. we prepared several reports about the challenge of small industries and industrial towns and we addressed this issue , the problem of electricity, water and gas and the infrastructure of industrial towns , the facilities that should be given to smaller industries and the support that should be given to this sector. in this program, with the presence of the guests of the program, we will discuss more about this issue. the first part of the program is a report prepared by my friends . let's see, let's go back to the conversation . the infrastructure of industrial towns is still a concern of the production units in this city, especially in the field of energy supply, sarab yavari. from affecting the water resources of the region it should be followed, if not, we should follow the water puzzle of the cities close to the industrial towns, we should follow
1:12 am
the abbasabad town, which has 72 starts, the wallpaper was completed. also, the process of completing infrastructure projects is long, the delivery time of the infrastructure is prolonged, causing the loss of land to new applicants. and of course, the producers who need to expand their production lines have challenges that they have announced many times and the employment field is now 200 people, i want a thousand people, i want my help . it is after this interval when the person who took the land was actually committed to turning the creativity , they provided the producers with auctions or with the methods that actually exist
1:13 am
, in addition to the infrastructure, the lack of liquidity, our wear and tear and lack of technical explanation are the most important factors. stopping the activity in the production units is called sada and sima news agency about the same problems that were raised and we will try more topics in today's program with the guests , he said that in this program, mr. tahmourth lahoti is the deputy of small industries of the organization of small industries and industrial towns of iran, as well as mr. sajjad hashemi industrial activist who will be with us and the journalist of sed and sima news agency who will be with us , you are very welcome in the continuation of mr. lahoti's program .
1:14 am
rahman al-rahim, with greetings, politeness and respect, i am at the service of his highness and the respected viewers of the small hospital industry day program that passed on august 21, on the occasion of the commemoration of the month of august 21, in the week before this day , in fact, the plans in question have been activated and the infrastructure projects have been activated. we have on the agenda for inauguration of about 198 infrastructure projects, 209 industrial projects and 257 rocket units with activation in these days, we will actually reopen them and with the presence of the high official of the ministry, in fact, 4 units have been reactivated and 7 industrial projects and infrastructure projects will be inaugurated today. and the infrastructure included the policy
1:15 am
of water distribution network, water storage tank, gas supply network, road network and some of these different provinces of elvand, the industrial city of germany in the fields of chemical, metal and food industries, which were put into operation, entered the market, and our rocket, which returned to production in fact, these were also in the field of medicine and metal they returned to the production cycle in the production cycle. for the same production company , the unit was shut down . if there is a unit from the previous owner, it will help the production cycle again. when this happens, it is usually the case that if there is a need , i challenge their problems with areas that are usually tax and insurance, which are stagnant.
1:16 am
take them in the competition meeting to determine the assignment banks, which usually lead to the unit being shut down, we will get competitions that can actually get a chance to do it with the furnace, or they will assign a task with the service device from these conditions, in fact, the production line will be changed , which says that the current technical justification and it is not economical if the owner himself has this ability and is interested in doing this work, so that we can give him the necessary advice and with the help of our business consultants, they have provided services for this to happen after a large number of them. you can't have the previous owner, we are trying that with new investment in industrial estates for birth to acquire land as a result of stagnant units that have the possibility
1:17 am
to transfer to another person, and in a factor that happens between the new and previous investment, this transfer from a new heart is happening and a large number of new investment reactivations are taking place. mrs. guderzi, reporter of the sed and sima news agency, mrs. guderzi, have prepared numerous reports about the industrial towns and the production units that are in these towns . what problems have you prepared from them? face what are the problems of these units? i also say hello to you, the guests of the program and the viewers of the main economic table program . the main problems that the industrialists and producers are struggling with are the issue of providing raw materials
1:18 am
and good infrastructure of industrial towns. the infrastructure of industrial towns is the issue of water and gas, which is still not connected in some industrial towns, but it is a point that should be paid attention to . we are in the hot season, and the challenge of electricity supply is one of the issues that have become more colorful, and more industrialists are dealing with it. softens that too we will deal more now mr. hashemi, tell me about these infrastructures that bahar mentions and they will be addressed at the time of delivery of the industrial town and bahar will be ready from the time he wants to start work , how is it now? the electricity is coming, we are handing over the land, what are the problems, in the name of allah, the merciful , the merciful, with greetings, courtesy and respect , i am at your service, dear guests, why are you doing this, you see a discussion that
1:19 am
exists when you have settled in an industrial spot in an industrial town can it be done after i get those permits now? the russian settlements company itself will hand over the time they have, together with your presence , when i start to complete the infrastructure, first to the residents of the production of goods and the area created as an industrial town , then let's hand it over to everyone. it is gradually progressing under the load from that side, the following amount has been built to proceed at this speed, some of its infrastructure is compared to the handing over of the rear settlements, as a result, if we have a problem with water supply, we have an electricity problem, there is a treatment plant , we are at your service, there is a problem with access roads.
1:20 am
the reason is that the construction of the settlement was completed and it was transferred to you however, it is backward, it was created on the surface and i destroyed the town of kausar , which started to be handed over in 1972, and we have 432 problems with blood purification. in the matter of electricity, there is a problem with water supply. to be honest, you are working very hard for water and wind. i did the reduction of shahrek governor's company, it does its job, with the easy service device, the ministry of energy should really fulfill its commitment, so it is clear that the good challenge of the city that creates complete infrastructure , will it deliver or not, explaining the copper and the level, in fact, create industrial towns in order to get financial resources from the place of transfer of usufruct rights to the arena
1:21 am
the investment applicants will be provided, which means that the government of iran should leave the cities below, complete the construction, and start handing over the land to the government , usually one of the natural resources at the disposal of shahrek gharb, and then the infrastructure during the implementation of the infrastructure. the funds required for the implementation of the infrastructure from the place of transfer of the right to choose investment in the infrastructure sector , which we provide the model , is a spread of distribution networks inside the town. passages they are another source of power or not the volume that should be provided from outside until the future city will be able to provide branching within the city . the problem we are having now is actually the creation
1:22 am
of distribution networks and sewage collection networks, which are the engine of power. the requirement of the town or the supply of the required volume of a city, which is actually based on the law of the various legal documents of the upstream documents, which means that it is declared that the sata service device in the school of the town must deliver these lines to the power of amin and within the network. the distribution of industrial units permanently consumes and the use and perfection of the industrial town has happened and it will become a mother. we expect the materials that we have on behalf of the industrial units.
1:23 am
peak consumption or happens in times of crisis, created industrial estates , we should not have management over service delivery, in fact, management over service interruptions , unfortunately there is a view from the outside , the device side is the best point that can be managed, an industrial estate and our demands this is indeed it is our problem that we are looking for the sugarcane production unit to be shut down in any way. when a power supply unit is cut off, a gas production unit is cut off. we cannot plan ahead or the raw materials that he plans to consume
1:24 am
in the production line, and it becomes one of the challenges, problems and damages . make sure to pay all the parts it is our own and we must do it seriously, it doesn't mean that bazari doesn't want to do this work , there is a challenge and a crisis in the whole country regarding the provision of power to the heart, which especially during the peak consumption time, again to the head of gas in the time getting cold is a problem that we believe should be solved by determining sufficient power in the current situation of the groups that are especially claiming the industrial estates . the damage that i am saying now. he clearly said that since
1:25 am
the energy management of production and industry, it should be mr they take it in the supreme council, they say that they will approve it in the supreme national security council, sir , that it should be used in this style and manner and management, until now the ministry of energy itself and many times for several years, when finally one year, two years, three years, five years or so we have to endure the management of consumption and the same approvals . mr. doctor, let's look at the industrial town two days a week from 11 am to 11 pm
1:26 am
the 11th will be upgraded and the next day they will turn it on from 12:00 pm to 12:00 pm. we can double it to 32 billion tomans, in addition to the fact that the basic materials for pregnancy are the length of dr. lulu's line of 860. this device should not be turned off at all . it is turned off with emergency power . what should we do with us today, mr. doctor?
1:27 am
hassan khani, this year, amin, in the month of march, we are paid for 30 days, how many days did we work, we worked for 17 days, those machines are not ours, there is no damage, not only from your point of view , there is no damage to the workers, only the raw materials, and it is not. in order to determine the days that i want to cut off the electricity anyway, it is okay to have a meeting with us, they are already setting up a plan themselves, they say that this is what it is, we accepted it, finally, i was with any management , we managed one day today, mr. eslami, the producer , so that the emergency power will be continuous. if he buys fuel without it, he will be accused of being a fuel smuggler is it possible for the diesel generator engine to be under load for 11 hours? please provide us with services, mr. doctor. they said that the infrastructure of the industrial estates
1:28 am
is at our own expense, in the form of usufruct rights. today, in the industrial estate of abbas abad, homa, the ministry has 360 megawatts. of these 360 megawatts, 190 are very interesting. the year when the supreme leader , may god bless him and grant him peace, said that the growth of production and inflation today is for 70 units of dr. lahoti's service of 40 megawatts of electricity, this report has come to see that this is the issue of my electricity supply . kilowatts of power outages in industries
1:29 am
we have 12,000 megawatts of unrest , and it was decided that this year the electricity of the industries will be cut off for 12 hours one day a week with prior notice. we requested 8 hours . it is planned that they have a consumption management plan for 12 years a week and they are fixed from 11:00 to 23:00 every monday from 11:00 to 23:00 . until 11, or maybe a work shift in the middle of sha'ban, one of the solutions to solve industrial electricity it is by these industries, of course, producers have opinions about it, with small-scale electricity , provided that the electricity of our industrial town is cut off in the national grid, without the electricity department or any other organization, it can
1:30 am
be bought at the full price with a small profit . it is because of electricity that we are faced with a drop in production. the companies that we followed up with the organizations related to hazrat in order to be able to start a solar power plant, but they do not support. the largest solar power plant will be built by an industrial unit in iran with a capacity of 600 mw is the memorandum in fact, it has been arranged between the iranian electricity network management company and sanat that those who use renewable power plants to supply electricity are exempt from the consumption management programs that you implement in the summer . power cut
16 Views
IN COLLECTIONS
IRINN Television Archive Television Archive News Search ServiceUploaded by TV Archive on