Skip to main content

tv   [untitled]    August 31, 2023 7:30pm-8:00pm IRST

7:30 pm
[000:00:22;00] sitting in the first row of the page of self-sacrifice is over there on the other side of the valley, see the joy of meeting is there, stand up for justice first, the burden of trust is on your shoulders
7:31 pm
, the first page of the page of service, the page of the people, you have a stronghold, this is also you, and there is hope for you, we pray for you, in the eyes of a martyr, in the name of allah, the most merciful. al-rahim, honorable court, i would like to introduce you to the khabar network on the front page. in the evening, we will talk about the field of mining , the events that happened in this field in the ministry of mining industry and trade's deputy minister of mines and materials processing, the review of work performance in this field and programs. what is ahead as strategic plans that we will reach in the future the purpose
7:32 pm
of the presence of mr. engineer mohtashmipour, the honorable vice president of mines and materials processing of the ministry of mining industry and trade, mr. engineer , is to flash the 7th plan and what is your assessment of what has been seen for the state of the mine in the 7th plan and what are your suggestions. you have proposed that it be included in the program, it is probably included, but i may remove it. your interest did not appear in the nowruz program , and we want it to be okay, in the name of allah , the most merciful, and we are also waiting to see the output of the commission, because there were some things in the government's bill. if we have any tips, these are we have adjusted and seen, but i am very much waiting for the output, which may be different from the ones in the 1993 bill, how good do you
7:33 pm
think it is ? it has been stated that targeting the growth of the mining sector should be beyond the industrial sector . in our opinion , it is contrary to what is meant by the macro policy of the country. study what this means. the industry beyond the speed of growth of the industry, the development of the mineral products that are produced in the market the capacity of the part of your proposal
7:34 pm
is not absorbed internally, which is in the proposed bill and after proof, and after the amendments that you actually forgive, the clauses that are completely different and contrary to the mining law are always in the bill in our circuit commissions. it worries us that the proposal reached us during the negotiations shortly after the negotiations is that some of the buildings that are built in the society are completely against the mining law, from a good thing for us, the law is changing .
7:35 pm
with a limited period of time, it is constantly changing, but good it can be a lot of complications for the gold mining sector. the laws are not stable. this content is also ours. we have stability in the rule-making process. when it is not about the laws , it is more in the mining law that we have a fee that the mine has to pay for the rights. government and some pictures have been specified and where any other expenses should not be incurred at the time of your death, it has been formed many times in some new laws that have come into the water, and this has caused the country's water department to demand separate expenses. it performs government rights in the mining sector and there are many government affairs from the future, but finally we accept stability in the laws or no
7:36 pm
expectation in any law to rule completely contrary to the spirit and direction of the previous law. he showed that the most important thing is the 13% growth of the mining sector that i mentioned is the highest in the industry and this is the highest in the industry, and we think you have some questions . is it really the country's macro policy to increase the mining sector from the sector to the industry with the help of the commission members? repair some now in our absence, there are no more negotiations. we will definitely follow up
7:37 pm
and provide the necessary explanations. i don't have anything special. i want to wait for new news. the news is good. you already announced that all the bands were booked until 1403 the meaning of the task is now, how many equivalents are available to the ministry of defense for determining the task, and what is your plan , whether all the mines and the croquet mines are active or inactive , and the task of 60 meters, i said and i am going to do it, block. it's like different blocks for our auction we have a number of mines, which is the reason for the auction, good tactics, or if it is possible to sell them, they should go to the auction and sell them to
7:38 pm
the public. the other thing mentioned in the law is that due to the sensitivity and limitations, mining activities should not be allowed without money , which means from the point of view of law that if this area is not possible to benefit, go and do it. it does not exist, but in step next, we will enter the pathology of this range, why in our game, the programs are held in less than 6th periods, god willing, we will hold these benefits and the entire range of the auction will be held within 1402 after
7:39 pm
holding the auction again. it was not in the auction, and after the auction, we have a demand that is negotiated with these conditions. second, it was finished after the liberation, and the areas that can be assigned according to the regulations of the mining law are the first applicant , which is the characteristic of this work . what is the pathology of amol? that has no demand for the area, it may show that it has no economic value because of the mineral information , it is the infrastructure of the people, then in the next step , we have to diagnose and try to define the mineral area that has an economic value but needs a series of measures, and bahadur yeganeh, leave it to the new one, all this work has just started, we started from the mines that have very high economic capacity, low added value, loss of these and
7:40 pm
introduce them in the form of investment packages, which have a large range of 5 to 6 to 10 products. put together in a package but again, some of the products may not have the same economic value , it has enabled it to be released and returned to natural resources, and now barun mehdi is known as azad. entering the discussion of pathology and now the preparation of the release package, numbers and figures like how is it ready to be handed over, or are you going to go away, the second one
7:41 pm
is still good, but we still have to make the results , which is finished according to the report that was resumed, the second one is beating the first grandfather 5000 dies were offered there were about 170 applicants, and after about 2 thousand new men were offered in the second auction, if the demand for that part, which was not already in the second stage this time, let's speed up the transfer law and repeat with this, i took it that in these six games we will offer these areas per month and by the end of the year, the mother layer of the auction has about 13,000 mines, but we analyzed only a part of these 13,000 mines until we are big. my estimate is that
7:42 pm
maybe almost half of these legal problems should not be . it has been here for many years, it has to be we open the order entered and auctioned. this range of specifications is actually a man who can be assigned to the outside. until now, this matter has been followed up . the question is, when he enters it, he realizes that it is not the most popular neighborhood. on the first day, which was 19 thousand tomans, 6,000 pieces of refining were lost and it is still going on. today, it is 12,000
7:43 pm
tomans. it is 12,000 tomans. it means that the surplus has been handed over to me. it has been removed from this work. i have paid 13,000 so far. if it is 1,000,000 tomans, then today, when we talk together, it is broken into a thousand pieces and this continue the process in 1404 , mr. engineer, the intelligentization of receiving government rights for mines, where did you get the latest news about the intelligentization of the process? in fact, collect a single database, colleagues, sitting on this information, preparing an analytical report after the damage, we were able to identify this way , and there were flaws in the pricing, and the lack of follow-up
7:44 pm
after the cases, and the mine had not been assigned a government task for many years. it came later we found out that we were not able to track the debts of our mines due to the uncertainty in the circulation of bank information. recently , there was an agreement with the central bank that we were able to do the payment in the description of our portal and the civil society. the preparation of a remaining report of each mine continues as easily as possible. the ultimate in smartness is what is happening to me. now we are talking about his electronic payment journey, which we are talking about today. he is looking for several things to make electronic payment and make it clear. the guarantees of
7:45 pm
the mining sector must have a precise file and it is transparent and in addition to this, we should have an electronic base of mines. in fact, it was a digital mapping of mines . i want to say that this process has started . it has entered the gate of the process so that we can actually have a continuous and focused periodical mapping that reduces risk. or the ambiguity is impossible. in fact, this error is possible. do an expert in the estimations to minimize wind or satellite. for the time being, we are talking about drones today, which started in the form of drones. i estimate one month to two years from now.
7:46 pm
it will be mapping and fixing some possible bugs in this the field should and should not arrive at a good database of digital maps of mines in different periods, which is the financial performance of my own forecast report, which is 34 years old. in fact, realistically, it will take at most 5 to 6 years for wireless mapping . the satellite, which is basically a lot of monitoring and mining, and different from the other one, from the intelligentization of monitoring, in addition to the issue of monitoring the transportation of mineral products, well, now a large part of mineral products is also in the country without a plan , and this has a serious role to play.
7:47 pm
it goes back to the infrastructure of our ministry of roads the infrastructure of the mines itself is back. in this year's law, in the budget law of this year, miners were tasked to have electronic equipment during the rainy season with the coordination of the ministry of roads . the calculation of government letters, which will be very different from today, i will give you the picture that we have today, that if i said that we will reach this point in the next 5 years , surely next season, new words and new goals will arrive in the field of intelligence, which in this salary calculation what is the basis of government calculation because some of on the occasion, the miners had criticisms about how to calculate, on what basis, how to calculate
7:48 pm
government rights in prayer, there are three pillars: 1. how much was harvested, 2. what was this mineral at the head of the mine? he demands it in the garden and then hunts. all three of these issues are on our agenda today, that is, in the government salary coefficient of mines, a heavy research work that was started in 2018 by the mining engineering system. it has been almost a year since the results of these results in come and expert committees continuously more than a month ago i did not produce the output, the description of material by material and in a constant manner in each session of the model, a good part of the time is spent on summarizing this very laborious work, which
7:49 pm
is about decision-making in the discussion of volume estimation that i presented and the control of cargo transportation is also the control of the mining map and of course, some of them should actually take measures regarding the registration of information, the instruction that i will become a miner in a few days, to which of these three places that are present in us, and all three are present in the body up to 60%, which is good. heard should be taken into account and in this sense it is set in such a way that if the mine does more work more fees should be paid, it should not be a photo, and if the raw material is sewn, more power should be paid than it is processed, which
7:50 pm
the estimate, for example, takes into account the lower number, and it is possible for experts with experience to discuss the price , where the price comes from, and the dramatic evolution is different. we are and now the joy of resistance is still there, but the share of information on the official invoice has become much higher and it is in the law in the approvals of the mother council that if there is an official invoice where the tax was paid in the value added tax, it should be included in that criterion, boy, it makes a lot of difference but in the opinion of an expert or an estimate, yaram is used with official cars, which is accepted by all of us, and the tax affairs organization last year was about 17 million tomans, which was about 70 million tomans in 2084, and he said that this export
7:51 pm
means crude it is not for sale and planning activities are happening to entrust minerals to the next chains and create added value. the emphasis of the leadership has always been mentioned a lot about the added value of mining, especially in the precious stones sector, for the country. while according to the rules of service without referring to the field we don't know what has happened to help reduce crude sales and give you technology that has more value for minerals like you. in the sector of basic mineral products , iron, steel and aluminum, the three proverbs of copper. you said and you gave us macro statistics that the share of export of materials is less than 2%
7:52 pm
of the mineral production of reza country . it does not have time to die like the sale of raw materials . then comes down happened because the demand is low, there is a big wave for us, and this is good, naturally , we have to get permission to export, and
7:53 pm
we have this situation in the basic industries, we have in the mining base, and we don't have the real problem of capacity . we don't have a very good price and semi-price. how is mining of precious stones similar to the rules and regulations you do? you can't make emotional decisions and analysis of regulations . we don't have rules for precious stones, like the precious stones that have been used in the precious stones of your bank for several years . the processing of the country's work has been done well, but it seems
7:54 pm
in our own analysis, we can see that in matters such as precious stones, i basically focus all my attention on the big blue furor , and in fact , i pay much more attention to the presence in the markets of precious stones. and the need for a new work, this work has just started, a matter that was last month's issue, when we sat down, the defects and documents in the heart of it, we reached the summary, the work has been started, the application has started in our exploration department, which in the exploration in the exploitation of precious stones, good actions in the exploitation
7:55 pm
of precious stones the price of monitoring is very difficult for you in sangha the price of the entire mining operation is almost including the decorative sugar head. it is very difficult. what happens after it is done? what happens is that this mineral, which is actually produced outside of supervision and outside of the official and without registration of information, entered the unofficial market. it does not enter the official market, the processing operation of precious stones can take place in the official space, because the stone is imported from the beginning in the unofficial market. very useful in the field of doors please accept the solution of the problem again. i want the big mother. we don't have money. regarding precious
7:56 pm
stones, for example, i will say that some materials are actually of the highest value . the problem is more strategic because we have problems in the field of technology or in the field of exploration and exploitation . we have to take measures. dariush aal, the quota of ard is not big. the issue of the wear and tear of the machine can be a story. it is challenging. it is said that more than 15,000 worn out mining machines have been operating in the country for more than 20 years. the finished price of the mineral products increases and that the interest rate is up to 40%. vari toman reduces these shortages, what is the plan there is an accumulated need that has been formed for years now. how should it be resolved
7:57 pm
? i think i explained a part of this decree in the previous state . let's face it seriously, in iran, it suddenly stops and for a relatively long period of more than a year, the import of mining machinery is disrupted, while we were not a producer in a large part of the mining machinery market, this disruption caused the price to increase. machinery in the mining area well, the increase in price due to this lack of medicine, the removal of obstacles to the import of the article, the instructions of its shape, was removed, and
7:58 pm
the renault car does not have a pension in the machines , it is rationed. we should have and we tried to import directly and absolutely everything, all or no restrictions in the mine, regardless of what needs to be imported in the mine, well, we were removed in the part of this issue that the observation is lighter. of course, we are concerned about the quality this means that domestically manufactured machines are becoming extinct, in terms of being able to compete with the quality
7:59 pm
of imported gento machines, and this problem has not been completely solved yet, that is, because we need more numerically heavy equipment, for example, two-thirds of the machinery required. mines are heavy, two-thirds of light, mineral and road construction are light, light trucks, light trucks in this sector, due to the conflict with the domestic manufacturing sector, the growth of domestic production has increased by more than 100%. now the volume is much better, but we still need work last year, we
8:00 pm
obtained more than 2,000 import permits for a simple car, which is a lie. it will take time to get back to normal . of course, this factor caused us to have a good outcome one by one. at the beginning of the year 1400, we had the highest producer inflation index in the mining sector compared to the entire economy . at the end of the summer of 1401, the mining sector became the lowest sector in the producer inflation index. but now that we have less than half of the calendar year 1401

13 Views

info Stream Only

Uploaded by TV Archive on