Skip to main content

tv   [untitled]    October 2, 2023 3:30am-4:00am IRST

3:30 am
in a company where, for example, there are 70 of us now , there is a kindergarten in different parts of the world under our company, which is interesting in my opinion because we are on the same side with people we never see normally.
3:31 am
these things that you see here are a series of chips whose internal design has been done by our company for one of the first ones that enter the market , it is produced by one of our customers, and we are currently testing this thing. . the engineer who should do the test is in the meeting now, but he is doing the test automatically, this is the device you see here. it produces heat or it cools so that we can see that this thing should still work properly up to a temperature of 10 degrees and it should also work properly at a temperature of minus 40 degrees and this heating is being done by this device.
3:32 am
we have written a series of software to control this thing, and this software controls this device , raises and lowers the temperature, and tries to control this thing in the so-called different things that can happen to it in terms of test the temperature in terms of voltage and in terms of changes in the construction. the test is long. it will take several months before we can finish it. let's do these tests and make sure that this chip can be responsible for the production of amboh or not , and fortunately, now it is the last part of our test and everything seems to be there.
3:33 am
what's up, what are you working on? visualization, sorry, the way from, okay, the visualization of this, okay, still liking your job, okay, i got your email, that's kind of like last minute, right, the very last minute somehow, yeah, okay, i think it's fine, but then in february it changes right,
3:34 am
we don't want to talk to them you modeled the channels, it's complete now or not , i'm ali harmati, i've been working for more than 5 years, i think, mr. doctor, because it's a university , they accept a lot of new ideas and these much more easily, for example, the risk of, for example, a let's start a new work or use a new idea. let's see what we can try. they are much more, very good . implementing this and this in the company, many of the things we have now are showing results after four years. that 's why we came up with the idea in the beginning. we were able to test the new ones and this position was given to us in the company, their support has always been very valuable to me in different situations, and
3:35 am
they always give us very good ideas in terms of technical and work . in the company of mr. dr. shekarullah, i am a circuit design engineer. in fact, i am an analog circuit designer . i just started working there. it is a very interesting company . i really liked being in academia and research. it is very close to academic work, very knowledgeable. that's why i really like people here in the company other than myself, 6 to 6 we have iranians who are all graduates of swiss universities, which is our own university. by the way, they are graduates, which means that they got their doctorates here. they are very solid and interesting people
3:36 am
. i think almost all of them came from sharif university. what we really need in this company is diversity and these are people who are not afraid of innovation and this is very important to me because our company is really built on innovation and if we want to be afraid of innovation, we certainly won't be afraid of innovation at any time. could compete i know the reason for my success with other companies is that i always tried to be completely loyal to what i do. to do the right thing , to show honesty in my work and to do what i am interested in, not what others tell me i should be interested in.
3:37 am
3:38 am
my advice to the students of the islamic world and the world and iran is to do the work you start correctly, as i said before, do it honestly and try to use pure ideas and don't be afraid that the idea you have is a bad idea that others don't like. a pure idea is just a pure idea which gives the correct answer. in my opinion, the duty of every professor is to make his student better than himself. only when we are moving forward in the same direction, progress can only be made in such a way that the next generation is better than the previous generation, and it is a
3:39 am
masterful task for students to do better than themselves. the mustafa award can be recognized as the greatest award in the islamic world for science, provided that
3:40 am
this award is given for the work done, for the results received, and not for the documents behind it or other collective elements . preventing the waste of 10 to 20% of our energy we can reduce the gas consumption of each of these motorhomes. the construction of the boiler consumes something like 32,000 cubic meters. we have saved here in terms of energy .
3:41 am
the government says in the speeches, the gentlemen say that there is a headline in the newspapers, now something has to happen where it has to happen, this is the meeting , the supreme energy council of the country is pursuing appropriate solutions to reduce and manage energy consumption, we should optimize the equipment by using alternative methods. fuel consumption in buildings in the industrial sector, we manage the demand with these solutions, we reduce the growth rate in energy consumption, rebuilding old engine houses is one of the measures that the national iranian gas company has put on its agenda for four years, this is one of those communities that there is a block where optimization work has been done, which is mentioned in the budget law of 1402 and can save energy consumption. well , here is the engine house of this complex, now
3:42 am
the repair works have been done . it has been optimized and insulated. the actions that you said will be done by the operators who are in the vendor list of the gas company. these operators will choose between the subscribers after the subscriber has registered. they sign a memorandum of understanding with the customer, after that the manager gets permission to enter our building with the customer or the board of directors, enters the motor house and does the construction work. when you entered this motor house, what was it like here at all? it didn't have insulation. there was a series of them. the old stone wool insulation was from 15 years ago, and it was completely rotten. we came and repaired the bottom, we applied anti-rust for them, after we did the anti-rusting, we insulated the pipes, they were rotten, we even brought them and
3:43 am
replaced them , this is what happened to them. it's not that it wants heat to pass through itself, that is, you touch it, but it wasn't like this before , you touched it, it would get very hot, and this in itself caused an increase in energy. gram for cooking for home consumption. it comes out of these the insulation is gone, when we insulate, if the temperature here is 60 degrees, it will rise to 58 degrees, for example, if it was 60 degrees before reaching the consumer, it would drop to 40 degrees, because the route of about 100 meters must be at least how many floors did he go through, there are 12 floors, when he reached the consumer, the temperature was 40 degrees celsius, that is, the temperature was low, so he had to take the torch, he would put it on 60 degrees, turn it to 60 degrees, 70 degrees, 80 degrees until it goes up. the temperature is 60 degrees or the desired temperature, but with this, it is 60 degrees here and it is 58 degrees there.
3:44 am
two degrees more, we don't waste energy. now the temperature of this water boiler is 50 degrees. how many degrees was it before? it was 70 degrees before . we brought it to about 20 degrees. now the burners that we see are fueled by gas. they burn gas. yes, engineer . how much gas do they burn? for example, they can keep a complex that is now 12 stories high and 48,000 hours , the burner that is here burns about 50 gas per hour . it has been used a thousand times in 1400 and 1401 with insulation it has been operated for 15,000 to about 25,000 to 30,000. gas consumption has decreased over the years. what is the temperature of this engine house now? it is about 4 degrees , what we
3:45 am
feel . it was the same as the temperature of the deck, that is, something around 70 degrees . we did a special job on this burner. they adjust it between the amount of gas input and ventilation, so that the fuel is properly ignited, that is, the fuel does not burn crudely. we did this. we will adjust the ventilation and gas supply, so this is no longer a problem it doesn't occur to us . how many sub-companies does tehran gas company have to optimize engine houses? about 60 companies came to register and 15 of these 60 companies are active. during the year 1401, what is the selection criteria of these companies according to the grade they receive from the program organization , they have to have five facilities , they can register in our system and carry out construction work , that is, any company is grade five. if
3:46 am
he has 5, he can work with you. if he has 5, he can work. well, you won't see any examples of his work, for example. after they have done something , we will give them a job according to what they have done. if their work is acceptable, the next work will be left to this company. insulation and this optimization should be done. this is about 12 floors of the building . we did all the pipes inside the riser, including the pipes inside the riser , inside the parking lot, the source of ambasat behind bowen, and also inside the engine room, along with setting the burner, which took about 6 days. he drew this complex that we are in 3 as far as the engine house, how much did each engine house cost, it is approximately 1.20 million, a total of 355 million has been taken, 355 million has been spent in this complex for the engine house , the most important of which is gas optimization.
3:47 am
pay the full bill to the manager. see the manager. you pay the manager. the manager comes and does the work. the manager comes and does the work . he delivers it to us. motor home that is finished what other part of our building did we insulate the pipes that take hot water and deliver it to the residents' consumers? we mean the pipes that come out of here, the pipes that come out of the motor house, you can see that it goes into our riser and goes into this pipe. everything has gone up to the back of my house, it's about 50 meters long, each pipe is 3 pipes that go together to the top, about 20 meters, we have insulated it up to the source of the embhat , now we have come to the complete parking lot . we explain that previously , the pipes were used as rock wool insulation
3:48 am
as you can see, it is the previous insulation and the elastomer we applied is the next insulation. well, with this waste of energy, there is a lot of rock wool insulation, and the rock wool itself also causes the pipes to corrode . what are these pipes? now, the hot water went back and forth. it made a stove inside the house. well, that's the part of me that abbas, if you show me these pipes, that's it. what is the pipe of shah pipes? those are the original pipes that came from the engine house. there is an installation inside this unit . they are all done right. and you can see that now that you are independent, these are our pipes that all go to the source on the back. yes, let's go to this point. oh, these are the same pipes that came from the engine house and continued to the sources on the roof. well, this is as
3:49 am
you can see . we insulated them so that the sun does not destroy them, we covered them with cashmere to make them last longer. this hot water is now hot water that came from the source of ambasat. you can see behind it . well, you can see the heat is water vapor. if it didn't have this insulation, the temperature would be much lower than this now , especially in winter, it would get cold somehow. when it entered the source, it caused more gas to be consumed until it reaches the temperature that it wants to pump again inside the building. what is the reason for this circulation ? because the water evaporates, it becomes steam, and its volume increases so that the pipes do not break . if nothing happens, they will put a mosad source above so that excess water can enter the sources . well, we have to say this, of course, now, abbas, show me this . this was exposed, and now i am ruined. it is already a disease. i mean, how long has this insulation
3:50 am
been insulated for? now let's see what happened before. if it was an indie, this wouldn't happen now. that's why everyone has to do a novel. if we wanted to do this ourselves , maybe we should have spent 400 million for four pages. for example, i'm an engineer. i want to register a subscriber, that is, to see, sir, what is the process of optimizing the engine houses of the complexes, please, to register on the internet platform of the national gas company of iran or nigc, then we will go and then enter this toolbar, which is the optimization toolbar. motorhomes this optimization of motorhomes to enter, there are three types of registration , magdi company registration and follow-up registration. it is subscribed, how is the process of creating a new account, how is it implemented ? well, i want to tell you a subscription number. you can check to see if this subsidy will be given to us. well, the security code
3:51 am
is 881. it wants a mobile number. this mobile number is someone's number. the person who registers can be the owner of the mobile phone and can be a member of the board of directors. ok, head of hit manager, ok, there is an activation code for the same mobile number that we have registered . we will enter this activation code. who has requested that optimization be done for him, the person who has applied has registered his mobile phone and the same mobile phone has an activation code and yes , please tell me 815 810 5 what is the request , i have a request to use binehsazi training , so continue. will your information be available to the hosting companies, that is, the hosting companies will see you to choose you, we say this, yes , the hosting companies can also see you, so
3:52 am
my information will be available to the hosting companies , we will continue later. how much is the total area of ​​your building? what is the area of ​​this building that you want to optimize? yes, approximately how much, approximately how much for an area, how much 2,000 will we give the combined benefit, we will give the combined benefit. dear subscriber, your request has been successfully registered and it will be provided to majdi companies for the modification of the motorhome. subsequently, the next steps will be sent to you via sms. how long will this process take? it will take about a month. sign it, then let's start the implementation process. mr. amani, the director of gas consumption optimization in tehran province, says that there are currently 3.8 million gas subscribers in tehran province, of which 20,000 engine houses are in tehran. residential, administrative, commercial and tourism complexes have the ability to implement the optimization plan. if
3:53 am
this plan is fully implemented and the compatriots have the necessary cooperation, we can reduce consumption by about 10 million cubic meters . you compatriots who live in the complex. those who live with motorhomes, you can register your gas subscription number in the system of national gas company of iran in the optimization section of motorhomes and see if you are entitled to the optimization subsidy or not . a job here in urmia and a storm it led to the death of two workers. and here, on 12 shahrivar 1402, tazareh damghan mine and the death of 6 miners
3:54 am
due to the sudden release of gas and the explosion of four workers inside the pool workshop and two engine drives , which was an unexpected accident. although this statistic is lower than the global average, it can be prevented in many cases. only in civil incidents in the last 6 years. it was human error. this shows that we have to make our supervision and inspections stronger and more. according to the statistics of the ministry of labor , 90,000 inspections of high-risk workshops are carried out annually is done according to article 15 of the labor law, if a unit does not comply with the safety measures, a warning and a fine by repeating it. to be the last five years were reviewed by the marketers of our work and analysis of work-related incidents . we have identified high-risk workshops in different provinces so that we can
3:55 am
focus more on improving their safety. the statistics of the ministry of labor cooperation and social welfare show that with the increase of technical protection workshops and renewal of inspections, the number of accidents caused by work last year was 14 percent and the accidents resulted in 11 deaths. we have that actually all the safety issues of our personnel are controlled by the safety equipment, and the accident statistics show that we had an improvement in the process compared to the year 1401 , 46 people out of every thousand workers in our country died due to work accidents and 51 people lost their jobs.
3:56 am
he falls down, he says that there is a lot of pressure on his lungs, he says that there is a lot of pressure on his lungs, his eyes are burning , his eyes are burning, and his eyes are weak in the last year. 711 workers lost their lives due to work-related accidents sudden explosion of gas at the end of the work shift due to any type of first fire factor i.e. spark , there are many laws including the labor law of the islamic republic of iran consisting of 23 articles and 121 notes for the protection of workers' health, but there are some omissions and a lack of inspectors in the occurrence of accidents. the work has not been ineffective. we are trying to save and protect the other labor force and put aside the agmaz and waiver and wherever the observance of work safety regulations is not done , we will operate with the help of the food system, article 15 of the labor law. statistics of the ministry of labor in 1401 show 38 incidents related to the sector
3:57 am
37% of the buildings were in the industry sector and 2% were in the mining sector. 500 of the accidents in our building lead to death . this point is very important. i request that if special attention is paid to some important points in construction workshops, we can protect the lives of workers more. the most accidents we have in construction sites are falls from a height and usually closing open openings. these open protections prevent construction accidents. in the past two years, 820,000 labor unions have been conducted across the country, and 64,000 fines have been issued to offending employers. maryam beikpour, sed and cima reporter. the meeting of the
3:58 am
first page. a lot of people talk about people's words, but not being with the people, he sat on the first page to justice, some of us with our own reports , we exchanged the test that the top train is moving on the ground. the time of plans, strategies and previous horizons of the consumer free zone. questions from us, answers from the first page and evaluation and judgment with you in the first row every night at 1930 minutes of khabar network.
3:59 am
hello, this publication has been with you for years , at any point in time and at any moment you want to get 60% of the resources of these publications completely free, right now the number five
4:00 am
is 30085 at four in the morning tehran time. dear viewers, welcome to this news section. this year, about 3,200,000 students entered the country 's universities, and those who have just become students are going to go to the university from saturday, october 15th. it is interesting that it is different from the ideas he has.

15 Views

info Stream Only

Uploaded by TV Archive on