Skip to main content

tv   [untitled]    October 6, 2024 1:30am-2:01am IRST

1:30 am
i believe that the issue is being directed in another direction. i said that in the world of sanctions, in the world of sanctions, no one can have banking transactions or financial transactions with me, the iranian exporter . it is wrong to insist that my name as the exporter be on the packaging. that foreign buyer, that foreign importer, puts money towards foreign parties. foreign exporters should deposit, because the money must go to the account of a foreign company. the name of that foreign company should preferably be written on the packaging. this is what we insist on. you see, this is my point. there is a time to say, sir, it is an iranian product, mr. haj. kazemian may very much want to mention the name of their iranian company, there is no problem, but don't oblige , let us at least let the outcome of today's meeting
1:31 am
be that there is a correct understanding of the conditions of the sanctions , and we know what conditions we are trying to face in foreign markets, then accept, accept, say. sir, we put a condition, we put a condition, if the exporter sees the good of his organization in putting the name of his foreign company on the packaging, we will give him this permission . thank you, mr. taheri, what do you think ? if we are sure in some countries that we want to export, it is mandatory that they must check the standard and the exporting party from the country where the origin of this is iran must have this, so we should not worry that we have to force, well, when there is force from that side, this certificate is mandatory he will present it , he will get this standard, it is possible that we have many of these things, i don't want
1:32 am
to bring the countries and goods, we have no need for these things, and he can do this currency exchange and this export, which means that it will be offered. it is being exported to the country as well. all the processes are there there is no need to go that way. now i have numerous examples in my mind, item by item, where the customer is ready to pay for everything in dollars. i'm just saying, for example, we used to produce a car, then the 85th standard said that this car should not be produced . there was a customer from another country and he said , "sir, this is what i want, i will give it to you." everything is not a problem, they are right, when it comes to export, it really depends on the country of origin without a standard, it accepts a lower standard . we should not oblige. yes, in places where the exporter needs this, we should really help him . we will give it. at a suitable time this year, in the summer of 2016
1:33 am
, i had a standard department for the ministry of jihad. this means that part of the approvals that were in our thread had prepared the product when they gave it the certificate that this, for example, can be issued in terms of quality now. the process in which the goods were getting damaged, he had taken action earlier, that is, he had involved the whole representative, who, god, if possible, would do this, for example. do it for me in a week or two . i have examples that in the accreditation discussion at the national center , we had a delay of up to 8 months. this is my time, it is a reality. this flexibility exists in the standard organization. now, the same issue that has been raised, the national standard organization is ready to solve this problem as far as possible in any issue that the private sector is involved in for export for its own business. it has been preparing in
1:34 am
all fields for the past 3 years there is, and i'm telling you right now that there is this preparation that if there are any discussions about the same companies in the same issue , we are ready to follow up where the law allows us, we will definitely do this depending on the timing process that pointing out that for the accreditation of 8 months in the world, the accreditation process is 8 to 12 months in the world of the system. accreditation letters in the world take 8 to 12 months, and in the islamic republic of iran, this process took up to 30 months before 1400, but in the last 3 years, especially in the last year, this process took 8 months and 8 days. finally, this process will be completed in 10 months. we are even below the limit of the global time process , despite the fact that we
1:35 am
do not have the human capital that the world has, but this happened with jihadi work and more effort. now the time can be less. we can be an example for the world. this time, i said , 8, the less it can be. sometimes , there may be non-compliance on the part of the international community for our group. we have some institutions for 6 months or 7 months in those domains that are for the first time and there has been no decimation. 6 months or 8 months, 6 months or 5 months, this process has been done by mr. hajj kazemian , what challenges does this long process that you mentioned also create for the exporter? i would like to make this point clear to the dear viewers and guests of the program.
1:36 am
it is possible to encourage the production of quality products based on international standards that include the health of our consumers. the organization means the national standard organization. in today's world the issue of medical products is such a standard , my dears, producers, exporters, get to know each other, come and help establish these current standards in the organization's structure, i want to say the same thing when our dear ones say eight months, this is a part of the trust in the organization that is defined, these 8 months are good. there is no iranian, but for the organization, not for my export product, which is caught in bandar abbas, and
1:37 am
considering that we now have many premium sample or national sample exporters who have been operating for decades, this is a standard check process, and it takes up to 7 days, 8 days, and 10 days. it takes time and no we will not only lose our markets, but the target markets of our exports will be removed . therefore, i want to correct this. when we say how long accreditation takes, 8 months for the organization, for the manufacturer, not for the export product , we should believe that if a product is to be to be exported from the country if they produce its products. it should have a standard mark, which will be done faster, but for many goods that we do not need a mandatory standard, they can be in the ports at the customs in a shorter process . in fact, the goods are approved by the standards department.
1:38 am
it should be placed and the goods will actually be included in its own export list . to mention seven days, according to the statistics that were published last year, the national standard organization sometimes responded to these test results or inspections in less than 7 days, but some tests take time, maybe 22 days, 10 days, 11 days from that time. it is not possible to go out, but usually more than 85 are answered in less than 7 days. i am in this time. laboratories are related to laboratory equipment, not related to laboratory equipment there are all these, accreditation, all those requirements, passing the test, environmental conditions , equipment, knowledge, technical skills, we have no problem in that part, the test process sometimes
1:39 am
takes 24 hours, sometimes it takes 48 hours, this is the process that must be done. more than 85 will be answered in less than 7 days, see if their concern is correct. of the 35,000 standards that i mentioned, maybe 2,000 to 3,000 standards are mandatory, and the rest of the standards are incentive standards that the national organization for standards in all standard compilations of the private sector or related and specialized institutions. in this area, mr. taheri, who is the executor of these standards, has some laboratories or some capabilities that we should have. in terms of testing , we don't have some products inside the country to some extent, for example, it's about cars, we don't have road test for it, yes, and the car has to be transported to another country with a lot of expenses , to be tested there and then come back. how long should
1:40 am
this happen? shouldn't we go towards establishing these centers inside the country anyway, or should we equip our laboratories now before asking the question. let me answer the question of his highness regarding the discussion previously, while thanking and trusting the words of our dear brother, his forgiveness is not acceptable to me because i was involved with my province . there was a time when the exporter was late and took a day off . now let's leave them aside from a process that is already losing its purpose . he eats and definitely the same the test process must be of the same product, it cannot be given early, that is,
1:41 am
sampling of the product that is being exported. now i will give you an example . in the summer of this year, i had my servant. regarding the equipment, yes, you are right, for example, in the case of our car, four of them. the 85 requirements related to accidents and safety, which are the most important from my point of view, because it is a matter of health and life of people, there is an accident from the front , an accident from a side accident, a car rollover. and in fact, it is pedestrian safety, which fortunately , after these standards, at least 6 fatal accidents have occurred, and these have decreased, which means that it has had an impact, but you are right, sometimes we are faced with two problems here, for a long time , we spend a lot of money due to the lack of establishment of these laboratories . we were from there, i remember we had problems like this with the products of iran khodro and saipa, that is, we must
1:42 am
get the certificate from the place where we used to buy that product from there, so there is no reason for a certificate to be issued for our product, that is, we sometimes have to deal with us. there are interactions that are not scientific and expert, that's why as much as possible, your words are correct. we must definitely look at equipping laboratories, especially places that are important to us, for example, the oil industry. people's lives are short, or for example, we have a serious problem with regard to construction materials, with the management of standard, safety and diversity issues, and i don't know, it means that we have to look at some places a little more specifically, and the next point. we went to the same issue, for example, the standard of car road tests, we went in this direction
1:43 am
let's equip it and have it inside the country . taipa and iran khodro. i think they are making an investment here, but the standard department itself, i don't have such data that in the last case, it was the same khudrasi that mr. islampanah himself said. that we are waiting for the tests outside our country, the tests indicated by the respected expert who was at your service in person, see that the manufacturer must verify the safety, health and quality of the product he produces, so that we can say that someone wants we have to produce a product let's create a laboratory. it's not like this , the car manufacturing companies have mentioned since one or two years. after starting, i think that if the work proceeds quickly in 1403, god willing, it
1:44 am
will come to an end. we will meet for the test. very well, a report from friends who mentioned about the equipment . it does not have a laboratory service that wants to be used. prepare the report, my friends, about the financial relationship between the existing inspectors , the existing laboratories, and the examiner. or the owner of the product, let's see the report. for years, part of the tasks of the national standard organization in the field of product quality assessment and various tests have been assigned to private companies trusted by this organization. inspection companies certified by the standard organization are present in production units. according to the order. perform relevant inspection actions. producers or importers
1:45 am
have a direct financial relationship with quality assessment companies and pay the costs of obtaining standard certificates . if the necessary supervision is not carried out , it is possible that there may actually be shortcomings to carry out intrusions. we all know that our financial relationship between the company that wants to give standards and the car maker on the other hand is definitely motivated by corruption. this communication was supposed to be corrected through a secure system, and the manufacturer or importer would not know at all which company is in charge of evaluating his product. one of the resolutions of the supreme standards council today was to cut the relationship between the tester and the manufacturer. yes, the sources of this entire process are from the tester himself, but indirectly , the tester does not know in which laboratory his product or
1:46 am
the product he wants to test, in fact the test remains. so far, there is no news about the start of this system. amir navaei, sed and sima news agency. well, mr. hashemi was one of the musubats of 1401 when we were at your service. and you also said that this has been attributed. it has not been implemented or if it has been implemented, how is it? from the beginning, i think, from awasad 1402 , these payments started as a pilot in some provinces. it should be done online by the department that wants to take the test , and such monitoring is also done online , and this process continues, even in the matter of accreditation, the same system is foreseen, which in this process was completed in october of 1403, and
1:47 am
the accreditations that are carried out in the framework of this work are carried out in all provinces. the communication and payments that are made are done in the system platform, we don't see how many percent of this. we have all the tests in theory and in practice. now, everyone who goes to the desired laboratory knows where it is, and with that book account that you mentioned, the process of sending the sample is different from the payment. those who mentioned that this payment cannot be done , how many percent of all provinces are now doing this process, it means that i want it now. take the sample they will go to that laboratory and then only pay for the system. how many payments should i have ? one with the system and one without the system . this is proof that i want the predicted prices
1:48 am
so that these shipments that are sent can be submitted to you. . in the provinces, this has been implemented now. maybe it has been implemented in some provinces. this is what i have before you . a report in the last month or two has been presented by our aiti center in this regard . everything is done in the framework of the system, it is done now, not the previous stage that laboratory is more important, anyway, that interface. see, your order is the correct order, and all the points that have been mentioned here in 1403 will definitely be resolved. regarding sending the sample , i am telling you that the box is completely within the system and in the form of it is smart that the sample enters a laboratory until that collection of the clandestine administration
1:49 am
does not allow the box to be opened, access to that sample is possible. not all of these are predicted to be realized in all provinces by the end of 1403 , mr. taheri, this is a disaster anyway. it's too much. if yes, we also have this regarding the issue of quality control managers. now you know that the devices that produce their products must adopt the standard. they must introduce a quality control manager. the standard department will confirm this . is receiving the employee is there and must first report the reports to the ceo, the highest level there, and if it is not complied with , he will tell the standard manager that he has this violation . this is one of the serious issues. this is what we have, that is, the supervisor of that machine is an employee of the same private sector or the sector that is doing the production
1:50 am
. now, in some cases, the numbers may be very small, but you, for example, in the mine, for example, want to be paid a government salary. it is there that the mine gives his salary, for example , his government salary can be 2 thousand billion tomans, it can be 3 thousand billion tomans , suppose he wants to confirm someone, now calculate, for example, how much tolerance can that person have to be able to act correctly, so this is just the discussion of this laboratory and these samples in fact, the quality supervisor. we have this issue , there is the issue of conflict of interest, it is possible to do something like this and concentrate the receipts in some way, and now to some extent, for example, maybe this can also be considered, i don't know what friends are thinking now. if we really want to be more serious about this work, the whole payment process and, by god, all of them should be coded. that's right, sir, we will go to mr. haj
1:51 am
kazemian and i will get back to you, mr. haj kazemian. they can interact, now solve this, similar issues now, with a difference of opinion, it might create a monopoly in exports. tell us about these samples . thank you very much for your kind attention. i will tell you one thing very honestly, that is, the sample process is not a standard with the sampling process of the national standards organization itself. the receipts of the national standard organization and, in other words, the subsidiaries. the minister of national standard organization is not a standard itself. i, who am at your service, am cooperating with 30 provinces of the country
1:52 am
. each of them is doing their own thing according to taste. the samples taken it is not clear at all. if, for example , it is peeled pistachio nuts, the price per kilo is 35 euros. yes, we see that a carton is going , so what is the use of this 10 kg carton , except that you have to go and do your testing process and return it, but unfortunately, in many cases, these samples are not returned at all, and unfortunately, our export goods. it hurts. on the other hand, the costs are not clear. each province issues invoices to the exporter in one way or another. they do and none of them are similar to each other from east azarbaijan province we are always indebted to them , they really love us so that we can go and die for the
1:53 am
deprived areas that we have there in khuzestan province. shadgan city does not have a representative of the governor. a contracting company has a standard organization in another city, and they impose huge costs on the exporters who operate there. let me tell you that there are not one or two problems, but there are only one or two problems, and we will proceed one by one, mr. haj kazemian, mr. hashemi, this sampling process . we have a process, we have an implementation method , we have a recipe, this has been established in the supreme council of standards , the structure of the supreme council of standards is clear. it is not the case that there is no mechanism for payments and receipts in accordance with the rules of employment, which
1:54 am
is the origin of the supreme standards council. now, if a company in a province does not comply with this, it will be notified and its activities will be stopped . you cannot generalize this to the entire organization. look at the things here, it is not logical, not what they point out, they get more, i said in the context of the system this is being done. it is not like haj kazmian. is there a system? see , the payments are clearly presented by the representatives of the national standard organization, and i will say whatever amount you ask . let me give you an example. god forbid, misunderstandings will be created. khuzestan province, hormozgan province, infinite. at all, the cost was spent, but instead of azer province. khorasan province, khorasan, razavi, south khorasan , open conditions are better, there is no payment standard
1:55 am
, i am telling you, imagine an exporter who has to export 1 container or 10 containers, you think this in general, this export shipment is gold bullion, how many should be taken, how many should be taken by the standard representative. i have given this as an example many times. we, the exporters of saffron, are humiliated. it means that so many samples are taken and then the goods are not returned. if the sample is to be kept for one month, two months, three months, at least they should return these samples, sir. we returned the samples, unfortunately, i don't want to say anything that will be questioned by everyone, no, there are many loved ones who are kind and kind. exporters but when i scream i say that saad does not have a standard for local export goods from arabs anywhere in the world.
1:56 am
no one values ​​iran's standard mark for various reasons. i want to say to you, come to your place , come to your production, come to your production organization, come to standardize your production process . thank you very much, mr. haj kazemian, mr. hashemi . unfortunately, there is a time when there is no inspection company for a product in a province, an inspection company is possible. if he wants to take a sample from tehran , he can refer to take a sample or in one in another province, these expenses are not commission fees. if expenses are incurred in this department, the commission fee is clear, usually in may or june, depending on the country's inflation situation, it is determined and notified . it is not the case that anyone wants to receive any commission, but these the cost that
1:57 am
a company wants to go from one city to another city for transportation or establishment is not included in the sampling costs. the point i want to make is that we proceed according to karmez regulations. then you can publish these as well, this is the regulation yes, the sites are accessible. everyone has access. any case related to the inspection or laboratory company should be referred immediately. how can this be solved in front of an exporter? is systemization a solution or not? because we have little time , there were many points about standard discussions in the domestic sphere. you focused more on exports. see , let me summarize 2 issues. first, we have a problem in the executive bodies called partisanship. for example
1:58 am
, we have the administration of the provincial capital. it does not have a representative, it must be from somewhere else, such as facilitating the issuance of licenses it happened, it must be in the area of ​​my standard, thank you , anyway, for the time and process of the costs, which is a standard issue for the exporter, for the importer, these are not small issues, any of them can be an obstacle in front of a producer or an exporter. it should be resolved. thank you for looking. goodbye to the economy.
1:59 am
there is no power and no power except with allah, the most high, by the permission of allah, by the permission of the messenger, and by the permission of the caliphs, or the greatness of god, or the greatness of god, or the greatness of god.
2:00 am
in the name of allah, the most merciful, the most merciful, the zionist regime will take the southern part of beirut, the capital of lebanon, in a few days stage targeted by airstrikes. the warplanes of the occupying regime bombarded ashweifat area in south zahia. lebanon's ministry of health announced that two people were martyred and 18 people were injured in an airstrike by the zionist regime on al-jiya town in mount lebanon province in the west of the country. a car in the city of qusayr in western syria near the lebanese border.

5 Views

info Stream Only

Uploaded by TV Archive on