tv RIK Rossiya 24 RUSSIA24 December 15, 2022 4:30pm-5:01pm MSK
4:30 pm
subsidies have been identified, some of them will be found through the adjustment of existing ones. well, the so-called traditional measures, but support for the industry, the rest of the funding. it is important for all of us to understand this only to be formed. and thirdly, the initiators of investment projects must have sufficient equity capital to ensure that the proposed measure is effective and operates in full force. we work together, and we work with the web. now the rules of the guarantee mechanism. this will balance, as well as the risks of project implementation. uh, between business and government. now it is very important to focus the maximum amount of resources on solving this problem. the funds are needed there now, the state has done everything necessary for this. therefore, we will keep this project under personal control and report to you and in january we are going to hold a separate meeting on this topic on all resources. i ask you to support the proposal of the ministry of industry and trade. the report is finished. okay, thank you very much, colleagues, please, shumakov
4:31 pm
mikhail viktorovich fnpr, please, vladimir vladimirovich, in your speech, a very large-scale task was set, which, of course. uh, it is necessary to carry out and moreover those paths that are speeches. uh, voiced. eh, from my point of view. they are very progressive and should lead to success, especially, from our point of view, it is important to set the task that we do not have working poor people, that all those who work, they receive such wages that would , guaranteed to remove from this category the categories of the poor and the rise of the people, really the best mechanism for solving this problem. well, i would
4:32 pm
like it to be supplemented with recommendations along with an increase in the minimum wage. i understand that today our economy, uh, is structured differently in the economy of the entire economy, and therefore it is impossible to issue laws or decrees. er, how to build tariff scales, but nevertheless, recommendations on tariff scales that should be applied in various sectors of the economy would be useful, because if we raise only the people. we will be all the time lower part. uh, bottom low income workers pull up to uh, middle income workers and uh, after that comes uh qualifying uh distortions. skewed qualifications in pay depending on
4:33 pm
qualifications, therefore, it would probably be useful to give instructions for such recommendations to be made. and then, of course, there are collective negotiations at enterprises to conclude negotiations on the conclusion of collective agreements. there are active tripartite commissions in regions and industries. and there it could be on negotiation basis to establish specifically for the industry or for some enterprise. well, the third point, which from my point of view, is important, uh, to focus on uh, the moment on which you can focus attention is the strengthening of legality and strict implementation. e, the requirements of the laws of the constitution and, e, the prevention of various fantasies in lawmaking and in the interpretation of laws, because then when both law enforcement officers
4:34 pm
and law enforcement agencies, and the law applies, because then when in court a representative of the prosecutor's office, even the prosecutor general's office, declares that we are interpreting the law in a broad way, then this is simply a denial of the right, this leads to absolute e-legal nihilism. therefore, i think that it would also be important to point out that everyone complies with the laws in force in our country. thank you so much. so, please, colleagues. who else allow vladimir vladimirovich golikova dear vladimir vladimirovich dear colleagues good afternoon, in response to your speeches by vladimir vladimirovich, i would like to report that, realizing the sensitivity of the problem of fertility in the russian federation and the need for additional measures. in accordance with your instructions and
4:35 pm
the instructions of the prime minister, a large group of specialists and experts. we are implementing a project to study all the problems that are related to the effectiveness of the implementation of those measures that are related to supporting the birth rate now. and, as i said, the need to work out additional measures. and we divided this work into three stages until december 25 this year. we will prepare the so-called portrait of a woman who wants to give birth child in the russian federation as a whole and in the constituent entities of the russian federation, it will be based on all available statistical data. they have data from the all-russian population census, information that is entered into medical birth certificates, and so on
4:36 pm
. have children and finally, the third stage until april 15 will be targeted recommendations were formed for all subjects of the russian federation aimed at increasing the birth rate, and an additional set of measures to support the birth rate was developed. we will be ready to make such proposals, and report back to you, because we understand that this topic is an absolute priority in terms of achieving the country's national development goals. also, i would like to respond to two of your comments that relate to. diabetes a programs and hepatitis c programs currently taking into account your instructions and taking into account the fact that the ministry of finance provided for additional financial resources in the amount of 10 billion rubles as part of the budget law. by the end of this year, we will
4:37 pm
develop the appropriate federal projects for the development of a. a system aimed at combating sugar to combat e, a disease associated with diabetes mellitus, both for the child population and for the adult, while we are additionally considering the further development of this project, with regard to, and hepatitis c is in line. uh, with your instruction, we have already approved by government decree on november 2, 22, the corresponding plan for phased implementation, and until the thirtieth year, the action to combat hepatitis c further, and the ministry of health will create a register of patients with hepatitis c and determine the contingent of people to be treated in the chi system, the tariffs for the financial provision of
4:38 pm
this type of medical care will be adjusted and revised for purchased medicines in order to reduce the cost of appropriate treatment. i would also like to use today’s opportunity and also drawing attention to what you said in your opening remarks to address the constituent entities of the russian federation, we are working together to implement the most complex projects not only for demographics and social support for families, but also for the construction volume of construction. you have already mentioned quite a lot about this, including the construction of social facilities, we regularly hold relevant meetings on terms of construction and the fulfillment of those indicators that are enshrined in your decrees, but unfortunately, in a number of constituent entities of the russian federation , the topic that is associated with the transfer constantly arises, and objects to the right, you already said that those subjects that, uh, on the contrary, in a timely manner or
4:39 pm
ahead of schedule perform tasks should be encouraged through the transfer of objects, from right to left. well, i would also like to draw attention, given the high responsibility to the population for the introduction of social facilities, but to give after all, the regions of the country are instructed to fulfill in a timely manner the obligations that they undertake. 23 is a key year in terms of achieving the indicators that are set for the implementation of national projects. a big request to colleagues and to come out of the need to fulfill the obligations assumed and not to postpone for 24 years. and if this happens, then in practice, in a normative and directive manner, redistribute these financial resources to the subjects that have time, and those regions that do not have time, and that’s all time is shifted to the right. well, it's not a popular offer. but nonetheless. i wanted to
4:40 pm
pronounce it. let then carry out the completion of objects at the expense of their own funds. otherwise, we are the tasks that are set to create a social infrastructure. we will delay the decision. thank you for your attention. in the morning we discussed some issues for today's meeting with you and the minister of finance, and i support your proposal, bearing in mind, among other things , what is the primary link modernization program. she is also not so straight. uh, unevenly implemented and i in his introductory speech, he just said about this. and your approach to this is under discussion, as i said this morning. here i agree. with this, nothing is popular here. if they didn’t do it on time, then, well, why should we transfer funding to those who know how to
4:41 pm
organize the work, and, but we need to look at how it is organized again. e, this is especially true of the primary link about purely things. b technical documentation ready or not? what condition is she in? in what capacity does competitive procedures? how is it carried out? in what time frame and also how are they organized? yes, deadlines are tight. yes, but you need to learn how to work within these terms of financing. it stands out steadily on a regular basis. i don't see any problems. we need to redistribute these resources. that's all there is to fertility. that's what da would like to say too. uh. yes, of course, this is a complex topic, we know about it, if something of these demographic pits, which we have been talking about since the second world war, have been there since the early nineties, but still, we need to pay special attention to this, of course,
4:42 pm
attention and uh, hmm, you need to pay attention to the regions in which it develops. it's a situation that we just have to pay special attention to smolensk region, ryazan region, penza region, republic of mordovia but you know, uh, all these territories, we need to see what's there why there? the birth rate is lower than in the whole country what is the reason , i don’t know in the neighboring regions, it’s more or less decent there, but for some reason there are failures in these. after all, these are integral indicators of all our efforts in the field of economic and social policy integral indicators, therefore in the health sector. yes , you need to look at it carefully. and of course, uh,
4:43 pm
what you said, namely, uh, analysis of the whole situation and uh, making proposals. well, let's agree. when we discuss it, we have, in my opinion, postponed it several times. i understand that this is a difficult job. we must prepare well, such as how do you think, when can we discuss? i think that the month of march, vladimir vladimirovich, is rather long, somehow long let's look at february at least. we have already planned this work before. now we are doing this work, but i proceed from the completeness of the proposals. of course, we'll be ready in february as well, but it may need more after discussing some refinement in february. let's discuss your proposal. well, if necessary, we will meet again to put the inscription on the dot. thanks, we also discussed some issues
4:44 pm
related to ecology, including baikal. uh, you wanted to say something strong, a meeting, please money, and as part of the implementation of your instructions and the implementation of the national project. to save lake baikal, we need to fulfill two key tasks. the first is to eliminate the accumulated harm from the bppm - this is a former large industrial enterprise that was built by soviet builders. it is uniquely placed in the immediate vicinity of lake baikal torez water and secondly, to build several treatment facilities that have direct negative harm to the lake of such facilities. eight four are located on the territory of the irkutsk region and three on the territory of the trans-baikal territory and urban wastewater treatment facilities in ulan-ude, all of our facilities are in operation and are fully funded , 23 billion rubles are provided. and we complete the
4:45 pm
construction of treatment facilities in the year 24 after liquidation. e industrial site bppm accumulated damage. the first approach of vladimir vladimirovich to the projectile was in 2013 during this time. uh, four contractors were selected, and, uh, three failed to do their job, and against the third, among other things, a criminal case was also initiated. and in order to work on lake baikal with a reliable contractor in the government, we made a decision in october 2020 and appointed the rosatom team as the sole contractor for rosatom . now it is on schedule at the site completed. uh, first of all, urgent work. they are constantly performed, because there is a risk of overflow over the slurry. for example, lake baikal rosatom designed and built the appropriate local treatment facilities. and those sludge waters. purifies does not allow to fall into the lake, and all three objects that represent the accumulated harm on
4:46 pm
industrial site. btsbk, in the contour of attention, they carried out surveys on two objects. these are sewer facilities that contain black liquor and the babkinsky landfill, a prepared project for mortal documentation. and for this industrial site, black liquor is the most dangerous substance of the third hazard class of all. 290,000 cubic meters of this substance have been accumulated for wastewater treatment plants that contain black liquor and, already received a positive environmental opinion, the conclusion of the state environmental expertise. we wait confirmation of the estimated cost from the glavgos expert examination by the end of the year for the babkinsky landfill. i will be a complete set of documents for the treatment plant. and it will be possible to start work on the third object. this is a created polygon. this landfill is also located directly on the water's edge. according to it, together with anatoly anatolyevich, we decided to suspend the design for the time being and carry out research work in
4:47 pm
order to choose the optimal technology for eliminating the accumulated harm in these maps of this polygon. and we need to choose from two potential possible technologies for this composting or tification, in addition to bppm, vladimir vladimirovich, we are also engaged in the elimination of accumulated harm. these are not authorized dumps on the territory of the central ecological zone of the lake. we have already liquidated nine such landfills with a total area of 15 hectares. and today this territory has already cleared 15 hectares. ah. you also caught vladimirovich instructed the government at the st. petersburg economic forum this year to approve the program socio-economic development of the city of baikalsk until 2040, the program was developed by the ministry of economic development and submitted to the government; today, on the red form, the approval of this document is being completed, and we will submit the refrigerator for signature in the coming days. the program includes 62
4:48 pm
events . budget, and including we used the tools of the zhk fund and two development institutions in total until the fortieth year, at the expense of these funds, 33.5 billion rubles. and at 23, and the program will be funded by 5 billion rubles. thank you so much. well, as we talked this morning, well, criminal, so to speak, plots should be allowed by themselves. there, law enforcement agencies are sorting out all sorts of crooks, there were those who are suspected of housing improvement, the lakes must fulfill unconditionally and, uh, mikhail asked you to pay attention to this, including from the point of view of the development of the city of baikalsk there are, because we will solve environmental problems, but the loading of enterprises jobs in in baikalsk, the development of the city itself is a social sphere
4:49 pm
that is also extremely important for the people who live there. thank you. we agreed in june in st. petersburg, uh, on the accelerated modernization of public transport. and uh, apparently, the work is going on, but it still has some kind of routine character. hmm and here, the other flip side of this coin, which is connected not only with the need to update the transport, uh, refreshing it and rejuvenating the transport. if i may say so, but this is due to the loading of our e-enterprises car industry, how it goes to work here. we respect vladimirovich with your instruction in march. we have developed and approved the unified comprehensive program for the modernization of public transport, which is being implemented as part of the national safe high-quality road project in the twenty-second year as part of a comprehensive
4:50 pm
program. a number of measures have been taken to provide for the renewal of the rolling stock, including within the framework of the clean air program, the infrastructure menu, and the socio-economic development of the far eastern federal district. in addition, the activities envisaged by the initiatives of the economic development of the russian federation themselves, the grave of the mobile city, as well as the activities implemented jointly with the web to upgrade the urban electric transport were included. as a result, this year the indicators for the growth of satisfaction with the quality of transport services, the share of users indicated that they indicated an increase in quality relative to the base of the twentieth year, was reached and amounted to 17%. in all directions for the implementation of the program 22-25 years 105 billion rubles of federal funding is provided for this year, 1.122 units of vehicles were delivered, of which 828 buses 191 trolleybuses 103 trams in order to increase the rate of renewal of vehicles and the number of regions participating in the program from
4:51 pm
next year, additional financial mechanisms for buses will be launched. this is a preferential lease with the attraction of funds from the national welfare fund. uh, a month ago, the government agreed on special conditions for raising funds from the nwf, which consisted of a year on on a competitive basis we will distribute between forty- four s among the subjects. this is 44 billion. with the help of the preferential leasing mechanism, it is planned to upgrade 4,130 buses to upgrade electric transport, we apply constitutional models with federal subsidies and funds due to the federal budget for 23-25 provided for by the government, federal support of 86.5 billion rubles. for the implementation of pilot projects for the integrated development of urban transport in the eleventh regions of the pilot complexes will come they are considering not only updating the rolling stock, but also modernizing the tram infrastructure. in total, 630 trams will be delivered and 620 km of track will be built. in addition
4:52 pm
, 120 billion funds have been allocated for the modernization of public transport. this head most decided what they should spend this money on these funds will be implemented projects bryanskaya vladimirskaya volgograd and vologda kaluga kirov novgorod region nizhny novgorod orenburg regions in moscow st. petersburg, republic of kalmykia bashkortostan more than 220 billion infrastructural budget loans are also provided for the development of the metro in the chelyabinsk nizhny novgorod regions, the construction of the metro in the krasnoyarsk territory, vladimir vladimirovich, as a whole, the plans set will be fulfilled next year. i mean, we really had a lot of different programs. they were very scattered. for a long time we collected all this into one program. now we have such a systematic program, where there are many participants and a large share. here the choice dmitrievich gribarenko is engaged in together with shuval and says
4:53 pm
ivanovich i think that we will certainly have a result and we will load the enterprise in our own e-machine building. thank you, the report is finished. we are not yet here to tell you that the program exists. i would ask you, so to speak, on the basis of this program, to submit me a memo from which it would be clear. in what timeframe and what results will we achieve in terms of updating public transport in the region ? well, there we are. thank you very much. e hmm i was speaking in my opening remarks about the issues related to the financing of fast-growing high- tech companies. uh, talked about the need. e determination of sources that would replace e, the financing of those western institutions that have left our market. i would still like the minister of finance and the central
4:54 pm
bank to give their assessment of what is happening here. dear vavilo, one dear colleagues on sources, on sources, including high-tech ones. uh, so we have a company , uh, the companies themselves participate, uh, directly in implementation of the program and we also provide co-financing for these purposes at the expense of the federal budget. we have provided more than 50 billion rubles this year. for e-e participation in the implementation of these projects, in subsequent years, a little more than 30 billion rubles. here it is important that the integration and resources e, companies and the integration of
4:55 pm
federal budget funds. eh, they did. uh, a result that could benefit from, uh, economics and industries. values to make the company work not only within its own so to speak tasks, but also the results of this work were used for e, the economy as a whole and two words literally about e sources for e, meaning as an investment resource for e sustainable development. we consider these sources in two directions. these are long-term new sources. long-term savings of citizens, corresponding to e, legislative initiative. we have prepared together with the central bank. uh, discussed and they are now under consideration by the government on the one hand. we provide reliable
4:56 pm
tools. e for citizens. e v. accumulation resources e accumulation. own means, so to speak. uh, here and the guarantees of the country uh the state here and co-financing and tax deductions are provided uh, uh, this kind of instrument and on the other hand these funds will work as long-term resources for the development of the economy, and the second tool we are also developing uh hmm additional incentives for the participation of uh, citizens in the financial market, meaning first of all, of course, not in the first place, but only uh, russian financial instruments. here we are, also, uh, we use tax references to create tax incentives for our
4:57 pm
citizens. e such motivations for participation in the financial market and, accordingly, a guarantee e so that these are reliable and verified financial assets in this direction, we are going by the central bank. e, joint work and prepared appropriate draft decisions. we are in the first. uh, in the first half of next year, according to the plan, they should be implemented. thank you very much please. good afternoon in addition to that said, anton hero, i want to say that in general , the replacement of external financing by internal sources is taking place. we see this in the fact that the dynamics of corporate lending. e, remains positive, despite the difficult circumstances, and e, the company's markets continue to attract resources
4:58 pm
both in the bond market and in general. we see that , of course, the task of the financial sector for the coming years. this is the provision of financial resources for the project of all technological modernization, but while maintaining financial stability and certainly protecting the rights of depositors and creditors. e companies, therefore, of course, banks should finance projects that pay off, a and one among the projects that pay off. we want to reorient them through the banking regulation changes so that they primarily finance technological development projects, so now we are working with the government on the taxonomy of such projects. mikhail vladimirovich mentioned this. uh, hmm and the ministry of economic development are preparing criteria for such projects. this will allow us to customize. uh overall banking regulation, with regard to specifically fast-growing companies, which you mentioned
4:59 pm
is one of the clusters. uh, in general, technology development projects in the summer really had problems with large companies that borrowed our technology and attracted funds from abroad. but these are already well- established companies that cannot be called in the full sense of the evening as a whole. they are now receiving loans and can raise funds. but nevertheless , in general, of course, the problem is systemic funding problem. we don't have enough of these tools for fast-growing companies, so we take part in the work that the government is leading to determine the criteria for fast-growing technology companies, and such amendments to the legislation have been prepared, but they concern small companies in order to allow existing programs. there are many of them. there are quite a lot of development institutions and so on. eh,
5:00 pm
focus precisely on such e. on such companies, the ministry of finance has made an inventory of such programs. we are ours too proposals were given in our opinion. after changing the law. it will be possible to accept them already, and of course, the question remains on the agenda. what to do not not with small. uh, such fast-growing technology companies. and those who already hmm can be said to enter the stage of maturity. on the one hand, we have the entire financial infrastructure, a developed exchange platform. there is a special sector for the growth of innovation. and there are, uh, innovation and investment sectors. uh, there's placement going on, but it's a market placement, of course. their volume is still small, therefore, in our opinion, it is needed, of course, for the state mechanism and support, otherwise such placements will not be very large and the government is in the process of developing them.
12 Views
IN COLLECTIONS
Russia-24 Television Archive Television Archive News Search ServiceUploaded by TV Archive on