tv RIK Rossiya 24 RUSSIA24 February 26, 2023 8:00am-8:31am MSK
8:00 am
and astronaut frank rubio their return is scheduled for september 27, the mission is half a year long and will last a total of 370 days. this is a record in the history of the iss, let me remind you the soyuz ms-22, on which the crew of the station flew in, was damaged by a meteoroid back in december. his cooling system stopped working to return. it was unsafe on it in roskosmos. we decided to send a reserve ship. by the way, he did not arrive empty , delivered to the station almost 430 kg of cargo, everything that was needed to extend the expedition. in addition to equipment sent to the iss three times more food than usual? in the capital, they again opened fire on the settlements of donbass, under attack, donetsk was completely fired shells at the city , six hits were counted from heavy barrel guns of nato caliber in the capital of the dpr, and all these videos appeared shot by a ukrainian drone, when four medics were killed during the shelling of donetsk 10 militants were wounded by the ministry of emergency situations, they used the drone to
8:01 am
aim at the target, that is, they knew for sure that they were hitting civilians, one of the shells hit the ambulance. she is now the first the video that the ria novosti correspondent managed to shoot from artyomovsk street shows the scale of the battles for the city. judging by this video, there is not a single building. survivor. uh, you can hardly make out the streets and you can see what was going on in the city, uh, apparently. that’s all that the ukrainian military left behind and the city will have to be completely restored, so it’s clear that and how intense the battles were in artyomovsk, they lost the opportunity to supply units, and the cities of the west through the city hours a yard. this is reported by military experts. uh, it is also reported that mud roads are now called mud roads, the only asphalt track. the direction is being shot through by russian troops in
8:02 am
the city itself, judging by the footage. e real news. uh, large-scale destruction once again, i will repeat not a single surviving building. eh, after leaving. ukrainian troops from here, the city apparently will have to be completely restored. also , footage from the surroundings appeared on the network, artyomovskaya on them, the dam of the dpr authorities blown up by ukrainian troops confirms the information. that's what militants say. the nationalists are trying to prevent the advance of russian troops and harm local residents, according to reports, flooded basements of houses in which people hide from shelling , thereby trying to force them to leave their native places. a rally against the supply of weapons to ukraine and anti-russian sanctions was held in rome, a demonstration gathered about a hundred participants, people held posters criticizing nato, did not shout anti-government slogans, similar actions calling for peace. in ukraine, were held in
8:03 am
other cities of italy milan pizzi florence more than 2,000 people took to the streets in gena italians are worried about the economic downturn inflation and the risk of nuclear war in france the protests of the military factories nexter. whose products are armored cars and caesar installations sent to kiev, the company plans to increase production, and in berlin, provocateurs installed an embassy of our country lined with a russian tank. however, contrary to their expectations, the germans and russian-speaking residents of germany filled up the armored car with flowers for deliveries and weapons to kiev, people condemn this is how russian daniil medvedev won the tennis tournament in doha in the final of our athlete. he defeated the ex-first racket of the world briton. andy murray, medvedev was stronger in two sets with the same score six four. this is the second consecutive winning tournament. for a russian today a week ago. he won in rotterdam. now daniil medvedev occupies the eighth position in the world ranking and on monday he will rise to the seventh place. and in yekaterinburg today
8:04 am
the winner of the russian futsal cup will be announced. the local senara will compete for trophies. and the moscow communist party on the eve of both teams won the right to compete for the title. having defeated the floor of the finals of rivals from norilsk and yegorsk. danila malina will tell how these matches went. yekaterinburg prepared thoroughly for russia's homework in futsal, almost to the eyeballs, the arena was full of both fan sectors. and look at the stands. we just couldn't afford to go out and be lazy and lose this game today. this is our sixth player. and it's all thanks to him sergey abramov captain of the local club sinara and in the recent past of the national team russia and this match he played a key role, scored an introductory blow and gave an
8:05 am
assist. what is your favorite player? bravo bravo, bravo bravo, today we are from the first after the victory 4:1 nadarelsky, nickel in the semi -final embraces the president of the club grigory ivanov, who from the bench watches the game not only of the football urals but also of his native sinara for it he played back in the nineties, becoming the ideological inspirer and team creator. i am satisfied, in general, how the atmosfera did a great job of the rfu and our club did great work to have a football holiday. we see even at the first game, where not the hosts play, but they play away and more than half of the palace is occupied. so very good. very good. organized. thanks to everyone, it and the guys show good football, such a fighting football, an interesting football match, which ivanov already watched from the rostrum of the communist party against gazprom yugra 3.3 in regular extra time, therefore the winner was determined in a
8:06 am
penalty shootout. the team scores the decision of the championship in the six-meter series and goes to the cup final everything was decided for russia, just exactly the series after the match in the penalty spot, with which we are the communist party team and congratulations, this is teamwork the whole game and the first half, the second half, the overtime penalty shootout, the teamwork of the coaching staff. they also tell us, but, well, you need to do it on the site. we game is a semi-final and the score is extra time. remember everything proves that two equal teams, that this is a semi-final, no one wants to just give up a place in the final. thank god that we are there left to find out who will become the owner of the russian football cup of this the communist party of the russian federation or ekaterinburg view of senar danil makhalin yegor dalinsky artyom kuznetsov near martovskaya, yekaterinburg production
8:07 am
of electrical equipment in russia increased by 30%. machine tools more than 55%. how domestic companies are adapting to the new conditions a special report made in russia the foundation of the machine. some experts, so to speak, after february last year predicted a decline in russian industry, almost by 20%, but recently the figures of rosstat for the past year came out, please, the industrial production index has decreased by 0.6%. it turns out they miscalculated, but i also have some figures, for example, electrical equipment, an increase of 30%. well, or, if you look at the metallurgical industry , the mining industry, the machine tool industry there is up to 55%, it’s simple and the most interesting is that all this , after all, in the conditions there was no sanctions pressure on logistics supplies, there was another problem with personnel. well, in general, a lot of things.
8:08 am
well, to be honest, there are problems. uh, in particular, for example, this is a shortage of personnel, it is necessary to train specialists, they talk about it at all enterprises, however. we do not give up, it turns out that the company is adapting to difficult conditions. well, i propose to take a closer look at this and our first story. from the krasnoyarsk territory suppose you produce electrical equipment from sheet metal. you need to efficiently cut various parts. here help plasma machine in russia, they are mostly foreign. but this krasnoyarsk company decided to compete for the market.
8:09 am
with the help of krasnoyarsk machine tools, for example, he builds ships and makes wagons aluminum customers are demanding, but the demand is just growing. in the light of new events, our volume has increased, at least 2.5 times, it would be wrong to say that absolutely russian machines want their share to increase in the final stage of obtaining a certificate of a domestic manufacturer from the frame body - this is understandable, everything is domestic. ah, regarding. ah, let's say, things are as basic as the source of plasma cutting and software control at the moment. we certainly use. ah. in that, segment, making up as early as this year , manufacturers will begin testing their own plasma source, which are made. ah, or
8:10 am
a copper base, not in full, of course, but more than imports. there will not exceed about 30%. as for the software in this direction. we are also working. uh, and for today. we are probably 70 percent of this task. let's solve another problematic issue that we manage to solve. this is frames. we cooperate with our ministry of education, both higher and secondary special. we came to the conclusion that the frame needs to be prepared independently. and what will have to be expanded in the plan? x on this new site. in the twenty-third year, and we predict our growth, that is, at least 40-50 percent, probably, equipment will be purchased with the help of state support. including industrial development funds. many measures to help businesses worked out even in the midst of a pandemic from rent, and all
8:11 am
sorts of tax breaks and much more , you know, i would still like to say that that the role of the enterprise is not only in financial support, but in the establishment of cooperative ties. this is a very important point. we were convinced of this by the example of the complex institutional project of the yenisei siberia, the main, so to speak, drivers, which are our large companies, including those from its sector, also russian machine tools in the moscow region. maria saw how materials are processed with electricity. in the city of fryazino , moscow region, at one of the domestic enterprises, we were allowed into the holy of holies here domestic machines make domestic
8:12 am
machines. the developer company, so they use their own product for the production of electroerosive machines, they process the details. with the help of electrical discharges, the scope of application is very wide, including the engines of the structure. these are the same turbines, these are nozzles for satellite systems. eh, radio electronics, even if you take just an ordinary mechanical wristwatch, i assure you, a very large number of parts are made on an electrolyzed machine. now the company produces 55 machines a year work here the shift that would meet the increased demand was an american company. i won't name her, and she. naturally. at this moment. just freed the market for six months.
8:13 am
we have developed a new such a small compact machine, which is even working today. uh, here are the largest holdings of this pipe industry. again , not everything for the machine tool industry is produced in russia yet, the company managed to find new ways to supply components. and how localized production? i think i 'll put a figure around 70%. the most important thing is that e intellectual component, that is, the generator system is the technology itself. these are completely our historical innovations, by the way, on the development of parts for machine tools of the administration of investment. in the moscow region , the company recently won 2 grants of 3 million rubles. it also buys equipment in expansion plans, including at a new site, and you can say something about the amount of investment . well, look, i’ll say this, if at the same time we take into account how much we spend on e, not okra, then this is probably well, 10-15 million a year we spend on respect. here are themselves, with regard to
8:14 am
complex processing of parts, including for engines, the topic will be developed by anton of the tyumen region. there is an example when every detail is important in every sense for sovereignty in the energy sector. the most complex mechanism pumps gas at the intoxication plant and these turbines serve it. it's not just a rubbed disassembled and then put back together here are made parts. well, in fact, they make a new turbine. this most difficult part is one of the most difficult elements, it is a ventilated blade. they are performed by complex casting our complex in
8:15 am
including manufacturing. well, here we are processing them. and after that , we perform balancing and assembly here on the spot, of course. uh, the fact that these blades are produced in russia is a very big plus. just an example of someone who needs good machines that we can currently purchase is a russian manufacturer, it is clear that russia is being preserved fulfilled the plan by 102% for the plant , a historical maximum, that is, we managed
8:16 am
to do more to ensure that the country's gas transportation system worked without failures our main end is inside russian fleet of engines. uh, gas-pumping uh for gazprom, it is sheathed enough. more details on one site, for example, moving the casting of blades here. moreover , there are such blades in aircraft engines, and the enterprise can also serve them . it has historically developed at the plant, it was created specifically for the production of aircraft and rocket engines. and we, in general, they have not lost these competencies of some unique documents. i think that we are ready to realize our potential in the repair of aircraft engines, including, but the expansion requires qualified personnel. here, the calculation is on your own strength. we offer our employees
8:17 am
to be trained at the expense of the enterprise for those professions that they could not get theirs before the factory life and for cooperation with universities in relations. training, but for the engineering staff, that is, in general , the tyumen motor builders site itself, it implies that we have qualified specialists to build the education system to the real needs of the economy and the tasks of the authorities, of course. here without, uh, an active, role of the authorities, primarily on the authorities of the region of municipalities, this task cannot be solved. moreover, many companies already organize so-called nominal classes in senior schools , in order to engage in such a subject of career guidance for children who are at the stage of choosing a profession. there are
8:18 am
enterprises. there is a potential investor. he has a demand for specific specialties with a specific level of knowledge and skills, and here , uh, only together with them, forming an order for in our uh our educational organizations i form the necessary for them. production base, using the experience, uh, of their masters and their mentors in the process of education, where specialists are in great demand and the following story maria saw machines, the size of which matters from a drawing to a giant, unique large-sized high-precision machine tools are produced in kolomna, so not everything is lost, comrades, all is not lost.
8:19 am
when it is necessary to process a large part , the machines of this plant with a height of 3 to 22 m are used over the past year. the characteristics of the carousel machine used to be 24 rpm, that is, now we produce machines up to 400 rpm from metal processing to equipment assembly, of course, we have to replace imported components, that is, we have already implemented. this is the second development of our plant in kolomna - all portal, machining centers and rotary machines are equipped with two axle fork heads. yes, we analyzed.
8:20 am
the whole gamut is essentially the use of uh strange europe for the production of these heads. we have created our own design documentation to replace until everything works out. well, for example, we managed to find an alternative supplier of vacuum pumps, at the same time we are developing our own parts and machines, in particular for processing titanium for aviation , we are doing it on a new portal machine with a movable table of hydrostatic guides, respectively, for ourselves. yes, as a prototype of the head, respectively, now launched a prototype. in recent years, 12 new models of machine tools have been created, they are already working with customers. we
8:21 am
are ready to increase the volume of production. almost twice. that is, if now the program is up to us, there are eight machines , approximately 8-10, then we are able to reach , uh, somewhere around 20-25 machines along the chain , stable orders allow russian manufacturers of components to increase capacity. then we will move on to serial production and then we can essentially implement this component base here on the territory of the russian federation, and we will talk about customers and further anton was convinced that without good machines there will be problems for such industry when mining. the company's number of orders over the past year has grown by percent
8:22 am
. about 80 different types of machines among the clients of the mining and processing plant of kazakhstan, armenia, uzbekistan have orders to africa and, of course, russia, foreign competitors left the market weight. well , the unique one, which only we do in russia , is our unique unit for the selection of coal and coal from wagons. right here, we are frustrated by competition from an american company, in principle, without updating the machine park nowhere update.
8:23 am
so far, complex machines, mostly foreign ones , are waiting for worthy russian counterparts. the same goes for parts, electric motors bearings have a shortage of 50-30 frames. i'd love to take it. these are the volumes that we have signed contracts, in principle, from colleges with two fields with the help of builders. i put into practice. there are 15-20 people here every year. i am young guys. we're bringing in contracts from the old space academy and all the foreign equipment is real, however, a new russian product needs to be tested for which a potential customer should be ready.
8:24 am
at least in the supply contract, to admit that these are prototype products with all the ensuing consequences, so that we later do not fall roughly into the costs of fines there for claims and so on and so forth, perhaps by testing it will expand the capabilities of the plant. new site relocation okay federal program. krasnoyarsk technological valley, that is, we are residents.
8:25 am
what is the most important piston production piston production, the most important thing is to withstand the micro structure of the material, and the second most important thing is to make precision machining, here the tolerances are micron this plant is the largest producer of piston group cylinder parts in russia, the cis countries, today in almost every truck or passenger car, every bus . in every tractor. there is some detail produced at our enterprise. in addition, enterprises occupy
8:26 am
a leading position in the secondary market in the spare parts market has been in decline. but now, for example, avtovaz is making more and more cars. and here, too, the revival of the rings, otherwise today there are approximately a million pieces a month. this is our production volume. and if we talk about the production of a piston pin, er, then there is about 80,000 today. uh, a good finger, monthly and there is state support from the region of the ministry of industry and trade. the industrial development fund, in particular, had two loans of half a billion rubles for the modernization of equipment, plus its own investments. 2015 by 2020 indicative years, a approximately more than 2.5 billion 2.5 2.6 billion were invested in 5 years 700 jobs were created volumes increased
8:27 am
by more than 2 1/2 times and two new production line, cylinder and piston appeared finger until this production. no, there was practically all the conveyor were forced to purchase ah, piston pins completely abroad. and what are the plans the company believes in the growth of demand and wants to automate the lines even more in the twenty- third year, again apply to the development fund industry. and we have already done two investment projects with them successfully, and the production of work is loaded. the kostroma region, by the way, is far from the only example when cooperation between business and the state gave good results in the region , the work of the guarantee fund has proven itself very well, they reported literally days ago. that over the past year thanks to the work of this fund. e more than 2 billion. kostroma businessmen received various kinds
8:28 am
of loans, benefits for very small businesses , a microcredit organization also operates, where uh, small businessmen can, uh, take working capital on credit with very, very low interest rates, thank god everything is working stable orders. anton saw how this helps development in the tyumen region and she is needed to reach a depth of up to 6,000 m, yes, even in the most difficult conditions.
8:29 am
some work site. actually, all the processes of the main drilling processes take place here, viktor gave us a tour of borovaya, the complex itself was designed in 3d, which should eliminate errors russian equipment was created by enterprises throughout country. the installation equipments are all made here in our factories. that is, all the mechanical processing, the entire assembly, the entire preparation. engineering - that's all we have. that is, we are, in principle, independent of any external factors, which means that mushrooms in the most difficult conditions of the north will not be left without spare parts and maintenance . there is experience,
8:30 am
for example, in the arctic, for several years , land-based drilling rigs have been operating with russian equipment, and in general, the enterprise is forty -sixth year and now there are several plants at noon, including this tyumen plant, which survived bankruptcy and is now increasing its volumes. at the moment, the plant has entered the production of up to 24 drilling rigs per year , which is about 30,000 tons of metal structures. here's the workforce that fluctuates from year to year. well, somewhere around 1.200. uh, 1,500 people so with a good load. many domestic ones have been restored and modernized, plus they have purchased new ones and trained specialists. and there are a lot of young people they came to us. uh, teaching programming professionals from st. petersburg. here, then i
11 Views
IN COLLECTIONS
Russia-24 Television Archive Television Archive News Search ServiceUploaded by TV Archive on