tv RIK Rossiya 24 RUSSIA24 March 14, 2023 10:30am-10:47am MSK
10:30 am
eh, monthly cashback education on the body of the ukrainian people, which does not perform any spiritual function. it performs only the function of legalizing power and all that violence that this power implements in relation to believers in the ukrainian orthodox church. this is, perhaps, even, perhaps, worse than without god it is. eh, in general, something perfect, outside of any moral and moral coordinates. and of course these actions. they aim at a very simple thing. they want to delete. uh, a common future and a common present and a common history that the russian church had in all this common spiritual space, that is, they want, by and large , to make it as if the history of ukrainian orthodoxy began in 2018, when
10:31 am
the schismatics received the so-called thomas received some label to mock the uh, orthodox believers of the ukrainian church. but for them, this is the beginning of some kind of new story of theirs, uh, which is based on this one, this emptiness, and yes, vera is like that. thank you very much watch. vladimirovich that they were in direct contact with us, of course, it is outrageous what is happening. mr. vakhtang kipshidze, deputy chairman of the synodal department for relations with society and the media, was with us live. vakhtang vladimirovich drew attention to the fact that this is also like this. here is the phenomenon of the post of truth yes, when one concept, when one, well, in fact, church institutions are trying to replace another, when the truth is trying to change for untruth, or rather, they try to pass it off as truth. eh, what are you come up with. and there is a lot of
10:32 am
interconnection here. in particular, let's take the situation with the northern streams, and the day before, nikolai patrushev, secretary of the security council of russia, drew attention to it when he announced that they were also trying to use some kind of substitute, but information stuffing. uh, as a matter of fact, somehow hmm public opinion to do. i don't know why, but anyway, what the new york times wrote, according to the intelligence behind the shutdown of the pipelines. there is a certain pro-ukrainian group in the nord stream, whose plans are not the site was sure to be known in kiev, echoing the traces of an attack on pipelines leading to ukraine, for what purpose these informational stuffing is done, as many people conclude. uh, including politicians and political scientists in order to divert attention from those who can really be behind this . contact us now, chairman of the federation council commission on information policy and interaction with the media alexei pushkov alexei
10:33 am
konstantinovich greetings. yes. yes , the truth is, that is, we will never get from those people who are called, at least to achieve this truth. i think that the truth , or at least, uh, a scenario close to the truth, was presented by the famous american journalist seymour. hersh on in his lengthy, detailed, very seriously elaborated article everything coincides. these dates coincide with the technical possibilities. uh, for such an undermining, there can only be countries in a high -tech country, especially for undermining. uh, slowed down so to speak, when the device is driven ah, action, uh remotely, a and the extent of destruction very significant there , the most powerful structures took off for the air, well, not for air
10:34 am
, the most powerful structures took off into the water. ah, who are naturally a group of amateurs, but they can’t be called in any way, so it’s no coincidence. uh, the united states did not explain the explosions in any way, there were several attempts to hint that it was russia itself that did it, but it did not take root, because it looked somehow completely prohibitively stupid, and after that the united states was silent until it appeared. it's an investigation, and they didn't like the investigation. why a is the fact that in unlike the fact that many believe that they say the united states has shown that they can do anything. eh, anywhere, anywhere. this is not entirely true, ah, if a country explodes, uh, international transport communications, uh , energy communications, through which gas is supplied with energy carriers. uh, there, uh, yes, other, so to speak, uh products, but human life. uh, i think this
10:35 am
indicates that this state is prone to terrorist activities. these are essentially terrorist acts. and here e be with such a stigma of the sovereign. terrorists who blew up three major gas pipelines. i have a feeling that after some deliberation in the us, they decided that it was not profitable for them, that it was too big a blow to their reputation, and it doesn’t matter anyway, and they are trying to fight it off. if there was no investigation of the heart, they tried to pretend that it is not known who blew up, and then they have to get out and, uh, see what version they put forward, that this is some kind of pro-ukrainian group that is not connected with the kiev government, perhaps, that is, they they are trying to shield more and, uh, kiev, they are trying to unload belevsky. a and b in general were female unknown anarchists. uh, let's go and blow something up. here is the most absurd theory, but it was put forward by one german member of parliament, and by a tv broadcaster, who
10:36 am
said that perhaps these were people, they went fishing, but with explosives. well, and that's what happened. that they blew up three gas pipelines, that is, the absurdity of these statements? now footage from the government house dear andrei valeryevich, you are the head of the largest electric grid company in russia thanks its infrastructure. it connects, well, it helps to provide almost our entire country with reliable, quality
10:37 am
and affordable energy supply to the regions and in general according to the results of last year, and the electricity industry was among the leaders, despite the sanctions , the difficult situation, the challenges, various negative forecasts showed growth and it is gratifying that it was in the year when we seriously carried out such a reorganization of the russian grids group. ah, increasing the responsibility of the country's power grid management efficiency, of course, we hope that such a step in the first turn will affect the implementation of investment projects. and, of course, to increase reliability, which is very important for all consumers. tell us, please, about the results of the year and about the activities of the company, and for today, please, you have the floor. thank you, dear mikhail vladimirovich yes, today rosseti is the largest electric grid company
10:38 am
in russia in the area of responsibility there are almost 2 1/2 million oe kilometers of power transmission lines, almost 550,000 substations of different voltage classes, if we talk about transmission, almost 80% of electricity generated in russia is transmitted through networks owned by our company or operated by our company. indeed, as you said at the beginning of 23 years. we're done. uh, a very large reorganization. uh, we merged two of the largest companies. this is a power russian of the fsk type as a result. e associations. uh, the parent company is now the power network is unified. eh? the operator of both the main and distribution complex in the russian federation, we have the passage of all corporate procedures, but took 2 years and to date. in january, everything was completed and the russian federation owns
10:39 am
more than 75% of the shares of the united company as a result of the reorganization, a single responsibility center was formed in the electric glass complex. uh, we have a single technical policy, uniform standards. and what is important as a result of the reorganization. we were able to reduce operating expenses hmm by almost 5 billion rubles. let me dwell on the production results in a little more detail. despite external influences in general, last year electricity supply. in our country, it grew by 1% compared to 21, and amounted to 790 billion kilowatt-hours, if we talk about the level of calculations for the transmission of electricity, then in 2022 it will be. almost 99% - this is a very good result . hmm, of course, the main thing for us is reliability and, if we talk about reliability indicators, then in the twenty-second year. and if we talk about the high side, that is, about all these
10:40 am
110 kw above, then our accident rate has fallen , our accident rate has fallen by 4%, according to the main networks compared to 2021, of course. in our country , the main reason for the accident rate of technological violations is bad weather, climatic phenomena, such as heavy precipitation and freezing rains. and, of course, the most important thing for us is the repair program - preparation for the passage. ah, autumn and winter. if you stop at e, the repair program. it was last year that we financed it in the amount of 77.5 billion rubles. which is nine percent higher than in the first year of the main work. it's a renovation for station equipment repairs and replacement of line supports, power transmission lines, clearing. rope. we believe that e is the passage of the autumn-winter period. we have
10:41 am
a satisfactory one, we have more than 10,000 emergency teams involved. this is about 50,000 people, the emergency reserve is fully formed. if we talk about e, financial indicators at the end of 2022, then our revenue grew by 4% compared to the business plan and by six and a half percent compared to 2021 amounted to 1.3 trillion rubles in financial indicators. uh, as for the main stage of the distribution complex, we see growth. uh, if we're talking about net profit approximately 10%. both in the main line and in the distribution complex. thank you , one of the key areas today is foreign trade to the east. we are actively creating infrastructure for the release of our goods towards the markets of the countries of the asia-pacific region. and this is a very important large-scale projects throughout the country
10:42 am
, one of such projects is the eastern training ground railway, in which the social network company is also involved, please tell us what was done last year. and what is today, uh, the situation with this project, please, i would like to first say that in general its investment program, how we went through last year. our funding for the activities of the investment program for 2022 has reached a record 435 billion rubles. this is absolutely a record for the rosetti group of companies. briefly touched on the largest projects that we have implemented, of course , and the reconstruction of electric grid facilities. for the highway. 12 moscow-kazan, we have completed one of the largest transits in the northwest of russia, this is a polish-korean transit designed to transfer locked power. e, the murmansk region to the territory of karelia and the leningrad region, if we talk about the objects of technological connection, more than 413,000 contracts. we
10:43 am
have fulfilled this and the connection of large consumers and social facilities and infrastructure, and of course, these are residential facilities and smes. we can say that more than 1,000 objects that we connected. uh, they were built according to national projects such as our projects for health care, education, housing, and ecology, culture and others, as you absolutely correctly say , for the largest project in the investment program is the power supply of eastern irrigation. this project is divided into two stages, if we talk about the first stage, then from these objects of the first stage 13 objects are currently completed, for example, last year one of the last objects that we completed is the transit of 220 kilovolts. and the mezhdurechenskaya steppe, which connected the kemerovo region and the southern part of khakassia, and he will allow it. uh, increase the capacity of the kuzbass section of the trans-siberian. uh,
10:44 am
this year we plan to complete the last facility and launch a 500 kv line. e-e from nizhny angarskaya and substation e, 500 kw, nizhny angarskaya, which is located in the republic of buryatia, everything is proceeding, in principle, according to the first stage in the schedule , and this year we plan to completely close and complete the first stage, as for the second stage , then the second stage provides for seven main power grid facilities construction. this year. we plan to energize three of them, these are two 220 kilovolt lines, one zil halva moguchaya second komsomolskaya start in the far east and the kilovolt line ust-ilimskaya hpp escutt work on the second stage is on schedule. we are synchronized with the russian railways, there are no risks, disruption of the shift. we do not see, and we have more than a dozen contracting organizations. it is the largest contractor in the region. power engineers
10:45 am
more than 3.500 people more than 1200 funds special equipment. and what i wanted to say at the end about the eastern training ground. well, mikhail vladimirovich, if we have , in principle, everything is in order for the first stage of the eastern test site, and from the point of view of financing the entire sources, the sources are synchronized. uh, and in the investment program. they are what concerns the second stage, there are questions here, and the issues of sources of financing for the second stage have not been fully regulated. i would like to ask you to instruct the government of the russian federation to work out the issue regarding the sources of investment programs, uh, rosseti group of companies, yes , i understand that the task, there are large-scale , it is necessary to make every effort to solve all the tasks set as part of the implementation of this project. i will then instruct the deputy prime minister of the new wheel , valentinovich, and the minister of finance, anton yuryevich uvanova. work with you
10:46 am
on all issues related to both the investment program and sources of funding so that the second stage can be completed last year. we have e russian federation dreamed of four new regions , it is important to provide the appropriate network infrastructure facilities, and these new regions. please tell me what company is doing in this area. yes, the roseti group is carrying out work to restore the electric power supply to new entities. at the moment, i can say that more than 3,500 have been restored, and objects are objects of different voltage classes, including infrastructure. tour, which provides electricity to such cities as gorlovka, svetlodarsk, severodonetsk mariupol volnovakha also performed work, ensuring the issuance of power to the luhansk tpp connected. more than 1,000 apartment buildings more than 35,000 individual residential buildings we have connected more than 25 pumping
10:47 am
stations, more than 40 kindergarten schools. e. also, both stationary boiler houses and mobile boiler plants were connected for the passage of the autumn-winter period. what is important to say is that we also ensured the connection of power grid facilities to the russian energy system with the possibility of mutual reservations.
15 Views
IN COLLECTIONS
Russia-24Uploaded by TV Archive on
![](http://athena.archive.org/0.gif?kind=track_js&track_js_case=control&cache_bust=629883231)