Skip to main content

tv   RIK Rossiya 24  RUSSIA24  October 29, 2023 12:00pm-12:31pm MSK

12:00 pm
in the application or on the website. no news, we continue to monitor developments, in some parts of the gaza strip, internet connectivity was restored today, according to representatives of bapor, the un relief and works agency for palestinian refugees in the middle east, they say that thousands of people broke into the agency's warehouses on the territory of the enclave and took out flour and hygiene items. bapor claims that local authorities are failing to restore order in the gas sector. against this background comes...
12:01 pm
message about a new exchange of blows between hamas and israel, the topic will be continued by maria skorodilka. as night falls, the attacks on the gas become stronger, and israeli ground forces enter the enclave. at the beginning of the second phase of the military operation, netanyahu said. the war inside the gas sector will be long and difficult, but we are ready for it. this is our second war of independence. we will fight for our dear one. this will be the victory of good over evil, light over darkness, life over death. the chief of the idf general staff spoke with policy statement. the goals of our operation are the destruction of hamas, ensuring security at the borders and the return of all prisoners. the israeli army is ready for all scenarios in all directions. in response to khamasirova.
12:02 pm
shells israeli cities, dozens of missiles were fired from gaza territory, most of which were shot down, but not all , footage of the consequences of the flights is spreading on social networks, in this video there is a direct hit on residential buildings in tel aviv and azhdot, there are wounded, the media write, and this already israeli kiryat she, the rocket hit the parked car building, firefighters fought the fire for a long time, meanwhile the arab media reported about the landing of hamas militants from the sea , there was alarm in the area of ​​​​the border israeli beaches, explosions were heard in the city of beidkhan on the border with israel, prime minister netanya... meeting with relatives of those abducted in gas, made a statement, before we delve into the details that can be discussed, i must tell you that the efforts not only have not stopped, but continue even more actively, we will find and use every opportunity to return the abducted people home before or after the start of a ground operation, this is an integral part of our goals. hama stated that the movement is ready to release the hostages if israel releases palestinian prisoners from prison. israel, from
12:03 pm
several sides at once, one of the leaders of the yemeni usites announced a quick missile strike on the underground tsahal base in southern israel. earlier , the israeli army fired at a number of hezbollah military installations in lebanon. according to newspaper reports, the transport infrastructure, including the military complex observation posts, came under attack. in response, hezbollah threatens israel destruction of high-rise buildings in tel aviv. this video appeared on lebanese social networks. commenting on the situation, israeli authorities said that allies in western and arab countries understand the goals of the war with hamas and wish israel victory. in the usa they promise. to support him, but it will take a long time to help, experts believe. i hope the us continues to do what it must, israel should be given the time and space it needs. we are not talking about hours, we are talking about months that it will take to defeat hamas, these are the necessary conditions, conditions are mandatory to ensure the safety of the israelis, and as we have seen, the americans too, that this escalation of the conflict will be protracted, they say in the united states, up to 4,000 armed members of hamas and a thousand
12:04 pm
are ready to meet the israeli military with gas, the new york times writes, citing sources. hamas is constantly introducing innovations in the field of underground warfare, experts believe. in addition, palestinian fighters could prepare tunnels and mine them, so hamas could wage a war in complete isolation for up to 4 months, experts conclude. meanwhile, the death toll in the gas sector has already exceeded 8,000, they say. data from the palestinian ministry of health. maria skorodilka, news. vladimir putin congratulated turkish leader recep tayyip erdogan on his centenary. topics of the formation of the republic: according to the russian president, turkey has passed many tests, achieved success in social, economic and other spheres, he noted that the country rightfully enjoys great prestige throughout the world. putin emphasized that relations between our countries are developing in the spirit of good neighborliness and friendship. in addition, moscow and the nkrs coordinate the resolution of important issues on the global and regional agenda. well , now to the reports of the special military operation. the russian military destroyed the czech republic.
12:05 pm
dana howitzer. an enemy self-propelled artillery unit was discovered using a drone. at a camouflaged firing position of the ukrainian armed forces, the howitzer was destroyed by loitering ammunition. and more footage from the ministry of defense. the southern group of troops discovered field storage sites for the ukrainian armed forces' ammunition, and the enemy positions were destroyed with precise strikes by drone operators. in the department reported that everything happened in the disputed area in the donetsk people's republic. moscow does not rule out a symmetrical response in the event of europe's theft of russia's frozen assets. the chairman of the state duma, vecheslav volodin, wrote about this in his telegram channel and drew attention to a number of european politicians, led by the chairman of the european commission, ursula fonderlya. conversations have again begun about using our country's frozen funds to continue the militarization of kiev. in this case , volodin warned, they will be confiscated where greater assets belonging to unfriendly countries than russian funds frozen in europe.
12:06 pm
the search for missing miners continues at a coal mine in kazakhstan. according to the latest data from the ministry of emergency situations, the death toll has risen to thirty-eight. the fate of eight more workers. still unknown. 10 mine rescue teams were involved in the search work. let me remind you that the tragedy occurred the day before, previously, methane exploded in the mine. about 200 people were brought to the surface, 18 of them were hospitalized, immediately after the incident, president kasym zhamar takaev instructed the government to stop investment cooperation with the arcelor mittal temertao enterprise. today a national day of mourning has been declared in kazakhstan. at vdnkh, now are the final preparations for holding the grandiose exhibition of russia, there are only a few days left before its opening , all regions will present their achievements, science, industry, culture, from the pskov region, the holder of the title of the soul of russia, the famous potter, yuri peresada, has been delegated, what
12:07 pm
will surprise you, igor danilov learned, is the stone mass yuri makes the blank for the future product himself; before starting work, all the air needs to be expelled from it. to work, it’s better to crush it a little, it’s like these connections shift a little, it’s so much more flexible and for work it’s, well, better, only then can you start creating products, as gonchar himself admits, he prefers to do what he can used in everyday life, he specially makes each mug unique, unlike the other, and puts a special meaning into its creation. a mug is an object that each of us takes it in the morning, fills it with what he likes. and then he hugs and kisses her, that is, this is a very personal intimate thing, and it’s great when she is special, yuri has been making ceramics for 30 years, he says he was miraculously lucky to meet this business, to fall in love with him, although he is not a native pskovite, he thinks pskov region is his home, the region leaves an imprint in his works
12:08 pm
, for example, in the subjects of tiles, i am sure the guests of the exhibition at vdnkh will appreciate his skill, the work is worthy, good, i just adequately understand that the levels... he good, i like it, i want to make beautiful, high-quality ceramics that are accessible to ordinary people, that is, this is important to me , that’s why i think that it will find its buyer there and will make someone happy, i’m sure of it, the main thing the goal of the exhibition is to tell as much as possible about the pskov region, it is thanks to the masters that the tourism potential of the region can be revealed. on the 20th , on the day of the regions, we will have a presentation at the site of the national tourism-hospitality industry project, which will be organized by the ministry economic development, and here we will actively present the tourism potential with the participation of both craftsmen and representatives of the tourism industry, tell, show, conduct master classes, also conduct quests, i note that the large international
12:09 pm
exhibition russia at vdnkh will run for six months, and once every few weeks the theme of the stand will change, for example, the first one will be dedicated to tourism. safe roads, in total this year 500 km of road surfaces were repaired, more sidewalks, pedestrian paths, two dozen bridges in border areas adjustments are made by the operational situation, vladislav kharchenko will tell you how road repairs are progressing in shibekino. on belgorodskaya street, the main installation work is at the final stage. layer of asphalt concrete. in just a month, almost 3 km of road surface was renewed here. the work is being carried out within the framework of the national project for safe and high-quality roads. since the beginning of august , 10 transport arteries have been put in order in the shebekinsky urban district, their total length is more than 10 km. repaired the storm drainage system,
12:10 pm
we were building edge trays, so i think that in the next 5-7 days we will physically... complete the asphalt work, after which we will begin applying road markings. during the renovation work, it was also decided to improve transport logistics at the entrance to the city. the terrain allowed the road to be widened to three lanes. two of them are on the rise, now low-speed freight transport will be able to move on the right, and the main left lane will remain at the complete disposal of passenger cars. in 2023, belgorod region entered the top 10 regions of the country in terms of road quality, where it is in sixth place; high-quality road surfaces are the calling card of our region. this year , more than 500 km of roads, 21 bridges and almost 50 km of sidewalk paths are being repaired in the region. the work is proceeding according to schedule, unless the weather and the operational situation make adjustments. everything will be completed on time. vladislav kharchenko, vyacheslav podzolkov, vesti belgorod. in
12:11 pm
a couple of minutes, the broadcast of our channel will continue the investigation of eduard petrov. the switchman will be responsible for everything. doblik for searching for a purchase apartments of your dreams. the largest database of advertisements. real estate service is number one in terms of the number of advertisements for the sale of apartments. in ural sea, we know that prospects are where they feel, where they wait, where they love , there are prospects, with uralsip bank, they become reality, ural and prospects are where you are, well, how are you, a cold, i report i apply, we’ll handle the report, but first, they strengthen each other, acting against heat and pain, that’s it, i passed, together we are
12:12 pm
strength, double strength and booklins double strength against heat and pain, where the milk comes from, in order to know everything about the dairy product, to have detailed and accurate information, about the composition and expiration date, where the cow is from, what region it is from, you need to do this, check everything in the application honest sign, honest sign the path of milk from to you alfabank was the first in russia to cancel commissions for all transfers and payments. order a free alpha debit card. not just profitable, alpha profitable.
12:13 pm
traders with the authority of the former deputy head of the krasnoyarsk railway andrei vlasov are accused of receiving large bribes. hello, eduard petrov is in the studio. we believe that lasov received a bribe, a mercedes kelntvagen was given as a bribe, the cost of building 1 km of railway was approximately 300-350 million rubles. everyone thinks that we gave a bribe so that we would work here, who did you go to, yes, you are so super positive, no comments, but you know this, i guess everyone is interested in ensuring that these actions do not come to light, so he removes the envelope . in your pocket, with someone, but not with me, yes, so do i
12:14 pm
believed, according to our information, currently 5 years ago , every year more than 100 criminal cases of crimes committed by railway workers are investigated in our country, initially there was a switchman, a switchman is a real person who moves the switches or not, this was directly translated by hand, that is at that time there was still such a thing... the construction and maintenance of a railway was a troublesome and expensive matter. the state spares no money on this. of course, the transportation of passengers and cargo, delivery speed and safety are at stake. especially when it comes it's about the vast expanses of siberia, where the steel highway becomes the only way to get to your destination. however, some officials are more worried. not the state of affairs on the right part of the path, an opportunity to profit. in this
12:15 pm
program we will talk about several high-profile criminal cases brought against railway workers at different levels. how much does it cost to build and maintain a kilometer of steel in russia? how did the investigative committee examine the case of large bribes at the krasnoyarsk railway? road, why the switchman will be responsible for everything. took up this matter and conducted their investigation.
12:16 pm
12:17 pm
andrei valerievich vlasov is a respected man among siberian railway workers. studied at a specialized university, worked as a track fitter and rose to the position of deputy head of the krasnoyarsk railway, supervised construction issues, they tried not to argue with vlasov, firstly, he is an expert in his field, it is simply impossible to deceive him in professional matters, and secondly, his signature is expensive, apparently that’s why the contractors tried their best to please the demanding... and strict boss, vlasov himself behaved quite modestly , did not appear on television screens , did not give out interviews right or left, but only a few words in a departmental newspaper, and then on specialized topics, he lived in a modest apartment in irkutsk, had a dacha on the baikal highway, well, all siberians, as usual, love to relax near a place of power.
12:18 pm
was andrei valerievich not indifferent to expensive cars? for several years he... drove the prestigious range rover on the roads, but so what? the salary allows, but the status obliges, only recently vlasovo began to be noticed driving a luxury mercedes suv gelentvagen. true, the railway boss did not have time to enjoy driving a luxury german car; people in uniform came for him. at the end of december 2022 , a case was initiated against ulasovo and was carried out. urgent investigative actions, searches were carried out at work in the home, a car was installed, this same glentvaden, transferred yes, as a bribe, in a house built already, where
12:19 pm
lasov lived, according to the investigation, in 2020, the deputy head of the krasnoyarsk railway, andrei vlasov, went to inspect the construction of a railway track on a remote stretch between the lukashevich-koy stations, at the time of the inspection he allegedly demanded a prestigious foreign car from a representative of the contractor’s company, and soon the car appeared. money in the amount of 20 million rubles was found in the trunk of a lasovo mercedes-klentlagen car. packs of five thousand. banknotes in a plastic bag were carelessly lying around in the trunk of a luxury car, the detained vlasov could not explain anything about the origin of such an impressive amount. he was sent to prison for the duration of the investigation. we believe that vlasov received a bribe from representatives of a contracting
12:20 pm
organization on an especially large scale, but as a bribe. a 2020 mercedes kelntvagen car worth at least 16 million rubles was handed over. for what kind of services did the contractors, representatives of a large organization , buy the official a mercedes? at first, local journalists were almost sure. that the builders simply didn’t finish something or saved on materials, and then asked the inspector to close his eyes to this and sign the certificate of completion of the work. but in reality everything turned out to be much more complicated. to understand the situation, our film crew went to the taiga village named after lukashevcha, which is 250 km
12:21 pm
from krasnoyarsk. our information: the village named after lukashevich was formed during the construction of the abakan taished railway line, named after the commander of a demolition group, boris lukashevich, who died in 1964 during an ice drift. the road through the taiga turned out to be long, but very beautiful. when we got to the right place, it turned out that the settlement as such no longer existed. its last residents left several years ago because there was no work. and here is the railway of the same name. the platform exists, from it towards the koi station, the contractors were building a second track so that oncoming trains could pass each other, at the station we were met by the chief
12:22 pm
engineer of the contractors, andrei grachev, he remembered how construction began. gorachev said that all the work was carried out quickly, in a year and a half, and the inspector, and this there was andrei vlasov , already known to us, periodically on yes, i think the work was done well, i say again, there is something to complain about, would you now be able to find fault with something here? no, i think that no, he still found vlasov, no, he didn’t find vlasov, probably not so , a little, vlasov demanded to fulfill those assigned tasks that were currently facing him by the leadership of the order, yes, that is, in line enter objects. perform the work efficiently, accordingly, within the deadlines supplied to the russian railways company. together with the main
12:23 pm
as an engineer, we move towards koy station. it turns out that all the work was done perfectly, but if everything is so wonderful, then why could the deputy head of the krasnoyarsk railway andrei vlasov extort a bribe? we asked about this directly. everyone thinks that we gave a bribe, our management gave, or rather a bribe, in order not to do something, not to finish it, no, there is no such thing, why then did vlasov demand a car and money, just so that you could work here? , well, it’s hard for me to say, i didn’t participate in this, yes, perhaps, yes, so that we we worked here, so that's the thing, in legal language, it's called general patronage. if you believe grachev, with one stroke of the pen, andrei vlasov could deprive an entire company of work, especially since there were
12:24 pm
several areas where the builders worked; the contracting organization on the krasnoyarsk railway carried out construction and installation work, work on the construction of second tracks and also reconstruction of the tracks , well, there were three plots, there were three plots, and lukovichka, work was done there in the amount of 593 million, that is, with such the amount of course is to allocate 16 million for the purchase of a mercedes for vlasovo, but this is a drop in the ocean, but we finally got to the station. here, several young people in uniform orange jackets of railway workers were leisurely fixing something. we carry out routine
12:25 pm
repairs of motor drive disconnectors, scheduled maintenance twice a year, we check serviceability, test them so that the dispatcher can calmly control and operate these drives. in your opinion, is everything here done with high quality, or are there any shortcomings or shortcomings? well, with any work in during operation, some things come up, some improvements are always needed, but over time this is all eliminated, well, in particular, with checks like this. before returning to krasnoyarsk, we decided to meet the residents of the village of koy. the first thing we did was go into the village store and there was an elderly lady behind the counter. this is emma karlovna, she has been working for several years. it’s more fun to while away the time, and an increase in pension is very useful, what does the village do, but nothing, there is no work here, they only work
12:26 pm
on the railway, at school, everything is clear, you have a club ; yes, we live on this one, emma karlovna remembers well how the second railway line was built near the village, there were a lot of people then, because the road was built by completely different people, not from the village. well, we made the road, poured it, laid it down, of course, for the children who study, come, come to teach their grandparents, of course it’s good for them, we go out on the street, a woman comes towards us, and we all somehow incomprehensibly understand that she is a teacher, oksana richardovnava , now we have first to fourth grades,
12:27 pm
the children are all studying here, in a year we will already have a fifth grade, they wanted to close the school , but we defended it, but how many children do you have? seven, seven people in total? so far seven , well, our work is mainly male - this is the railway, of course, and even now there have been many layoffs, who are left without work, the woman said that the village founded mainly by strong pavolzhian germans and balts, that’s why everyone’s patronymics here are so unusual, and also about why the town... from time immemorial, it’s been customary for us to have a station here, and there’s also a village here , so it’s like- then this name is translated bear corner is bear corner and there are bears here after the completion of the construction of the second railway track , many villagers lost their jobs, now they are idle, like this local resident, his name is alexander, he says,
12:28 pm
what are you doing again? i can draw you know how to draw, but what do you draw in a row, yes, but where do you exhibit, the paintings where they are exhibited, i don’t know, there was such a thing, but now it’s not anymore, yes , the partisan exhibited, the partisan, of course, in contentment having walked around the taiga village, for in which the railway is one of the most important sources of livelihood, we are returning to krasnoyarsk , we are going to meet with the accused of taking a bribe,
12:29 pm
andrei vlasov, we want to ask if he knows how people live in remote areas, to directly ask why he demanded from mercedes merchants, if, of course, this is true, but here everything turned out to be not so simple, the former deputy head of the railway thought for a long time and finally agreed to answer any of our questions, but with one condition, the conversation should not concern his criminal case. vlasov turned out to be an interesting conversationalist; it is clear that he is very well versed in the field of railway construction, and it seemed to us that even now he cares about his favorite business. taking into account the growth of the cargo base, development was required the southern section of the road, namely abakan teishet, for which it was created, the site was created and designed, the complex development of the site, the interfluve section, almost
12:30 pm
the entire complex. the railway infrastructure had to be built on almost 120 km of railways, but it is possible, but it is possible to estimate, for example, the cost of one section of some section, for example, there lukashevich, you remember son, i’m probably on average, let’s say that cost of construction of 1 km of railway approximately cost about 300-350 million rubles in prices of the eighteenth year, apparently, is not very... it’s nice to remember the names of sections of the road because of the stories with which he ended up behind bars, but you have to give the official credit, he didn’t even bat an eyelid when they were mentioned . lukashevichka’s foray is the construction of a continuous second track, for which, in order to open up the junctions on the approaches to the sayanskaya station, this is a large transport junction on the southern part of the road, respectively.

33 Views

info Stream Only

Uploaded by TV Archive on