>> please turn off any electric devices. before we went off in -- before we went on recess we announced we were taking items out of order. the next item will be item number 14. >> this case is a request for discretionary review to construct a 10-foot division -- i addition to the east side and a vertical i addition to add will lead you next's to a three- family residential district -- bad vertical to a three-family residential district. the department considers the current request would make the
6:11 pm
building more consistent with existing developments along both sides and with the underlying zoning clarification, by expanding to the side and increasing the building heights and by increasing the number of dwelling units. the proposed structure is consistent and the garage is a concurrent with the requirements. it does come to our attention of the project sponsor be able to determine the depth. it appears the rear property line may be closer to the existing building. the information may have been in error, and when sponsors ordered a survey, it will reduce the death of the building as necessary to comply with -- the
6:12 pm
depth of the building as necessary. since the issues are mainly concerned with the height, design, and other issues, the department suggests the commission hear the case. the department believes the project is not under exceptional circumstances and recommends that the project is consistent with the residential design guidelines and the project complies with the planning code. i would be happy to answer any questions. >> we have three requests, so we will hear each of you separately.
6:13 pm
>> good evening, commissioners. thank you so much for hearing us. our house is directly across from the project. i would like to show you the project is here in yellow, and this is our house across the alley. i have lived here with my family for almost 40 years, and it has been our home for three generations. my siblings and now my children and hopefully future grandchildren, too. i grew up here, and i loved it. we take care of each other. if anyone needs to go to the grocery store, we will pitch in and help. it is very special, and i feel privileged to live here. i would like to show you how
6:14 pm
narrow it is here. you know when they say, the neighbors will year? yes, you can actually hear conversations in our block. we are dealing with a project filling of the entire envelope, 40 feet wide, 40 feet wide with an additional head house. we have five levels. this looks like and will feel like a five-story giant. most of these homes are comprised of two story or three stories homes. this project does not fit the scale or the character of our neighborhood.
6:15 pm
we talk about the planning department. previously the board supported the project when the envelope was not even as large as the one before us. he wrote to the project architect, and i highlighted in his letter in yellow. opposition to nearby residents have been persistent and articulate. staff has conducted a site visit to the property to document the existing developing pattern
6:16 pm
staff has reviewed the project, and it is very important for the planning director. they do not predominate. 40 feet in width, expanding between both side property lines the height and scale. this continues on. given the fourth floor operation, they would not be able to support this. i want to summarize that the
6:17 pm
department cannot support the addition. i strongly request you eliminate this and modify your plans so the building has a height that is more compatible with neighboring structures and the scale of the densely developed portion of telegraph hill. i want to take you to the present. we have a letter from the planning department period is may 13, 2009. under the comments, the first line, which is the most important, reduce the height. that means to me that the top floor should go down, the fourth story. i do not know what happened here.
6:18 pm
i want to show you this board. i would like to specifically talk about this. >> was about five minutes? >> that was five minutes. >> you each get five minutes. the next speaker stereo -- the next speaker. >> good afternoon, members of the commission. i am here today as an architect but also as a neighbor. i have carve pumpkins in both sides of the matter. i have been to parties in this matter. these people are my neighbors and hopefully will continue to be my friends. i am here today because the scale of this project was too much for the smaller cali, and
6:19 pm
we have a cup -- the smaller alley, and we have a couple of maps that will show you. other than the pink fire station and a wide property and those on the end and those phones in addition to the subject, of orange lots indicate lots were the owner or attendancts opposed not the project but the fourth story of the project. let's be clear about that. when we look at the heights of the existing building on edith street, the first to note is
6:20 pm
that greenwich is parallel over to lombard street. these are going up hill from lombard or greenwich to edith', and there are 65 and 1/2 foot lots trapped were rear yards would normally be. they want to put a four-story structure. as you can see, to everyone who lives north of the project site, another four-story building to match the one built into 1952 before we had a planning code that limits buildings to 14 feet in height. before that, that building is fair -- there, and you will see that in the sponsors material. what we are trying to do is avoid another four-story building. there was a church on
6:21 pm
greenwich, and it is more easily accessed from the valley then from greenwich street. here is our charts of the building sites. you can see that is a backyard building. there is a front yard building as well, so it is very dense here. there is one on grant. it looks like it had an edition from the 60's. there is one that is a 20--- 20 by 24 foot building, and the addition they asked for was the only way to accomplish more area. that is one quarter of the sites in question or less than one- quarter of the site. the other is a four-story building built long before the code and before even if --
6:22 pm
before edith, so since 1910 and 1976, they stop to address situations like this where we are not dealing with 25 by 100 lots. that is what they a mansion -- what they imagined. if this is extraordinary to have a street in san franciscans that is only 12 feet 4 inches wide, i do not know what is. we would ask you take the fourth floor office building. when we were working with the neighbors, we pointed out they could follow the guidelines, and perhaps that would give a better sense of how the building should be oriented and arranged. we made an offer to the project sponsor that if they took off the fourth story and only had a
6:23 pm
penthouse elevator penthouse at that level, we would support a rear yard variants that would allow 3 feet, and by placing a new side walk down at the level, it would open up that alley, gives them an additional square footage to make up for the loss on the fourth story, and make a project that contributes, not simply exploits them for as much square footage as they can pack in. [bell] >> steve williams. i represent the third request. this case is exceptional. it is extraordinary because it involves a project that has now
6:24 pm
been reviewed by the department twice over six years that is completely inconsistent with aversive results. the department spent more than three years between july, 2004 and december, 2007 reviewing this project. it was up and down. the project decision team, which is the precursor of the residential design team, we now reviewed it since 2005. some of the most senior staff planners were there. they all said the same thing. later the project was reviewed at the highest level by the director of the planning department and by the zoning administrator. the conclusion by everyone after all these years of review was that based on the narrowness of the streets and the clear context of a three-story building, the project as
6:25 pm
proposed was out of character with ever prevailing pattern of this neighborhood. as the department strongly requested that it be removed. the staff report is incorrect. we are told the letter in 2006 was the last act the staff did on the first review. that is not true. there are two additional letters. those are attached, so the review went on for another year and a half after that, two more letters requesting changes, and the permit was are actually canceled. on june 14, 2007, because of the failure to comply to request by the staff. those plans did not do what the department was telling them to
6:26 pm
do, so on december 10, 2007, the department issued its last notice of requirements and said the project was going to be canceled if it did not comply and 30 days, so they did not comply. after all this review, three and a half years of review, 5 and have people asking for the removal of the fourth floor, -- 5 and a half people asking for the removal of the fourth floor, they filed an application. that is extraordinary. while this was pending, in order to get a different result, they filed a new application. that is unfair. that is unreasonable and bad planning. a complete waste of resources and time, a complete waste of
6:27 pm
neighbors resources and time to circumvent the process like that. if the department does not already have a policy against multiple applications on the same lot for the same project, they really ought to. the department believed the fourth floor needed to be removed, and it is grossly unfair, not only to the neighbors, but to all the other project sponsors out there who follow directives from the department, who follow directives from the planners would have to do it. the results sends a terrible message to the community. the message is that it is ok to ignore the request and just keep going, even if you have to file serial applications to get the results you want. it cents a message neighborhood character is arbitrary -- it sends a message neighborhood character is arbitrary. third, there is also a flavor of favoritism, pay to play, that
6:28 pm
if a certain market for his fourth of project, it is not going to get past, but if a different architect bring forward the exact same project, that is going to be ok. we urge the department, do not encourage these actions. it is not compatible with this neighborhood. there are 55 buildings on this block. four of them have four floors. that is 93% of the buildings are less than four floors. i urge the commission to take discretionary review and move the fourth floor which was so strongly recommended by the department at every level. >> now we will hear from those in support of the dr requester is. we're going to limit the time to 2 minutes. >> give me one minute. >> ok.
6:29 pm
up to two minutes. if you can keep it shorter than that, great. [list of names] >> good evening, commissioners. i am representing a whole bunch of people tonight. i am representing the coalition for san francisco neighborhoods, which is an organization that has 47 members as of last tuesday night. i am representing the san francisco network. i am a co-founder. i am also representing my neighborhood organizations. i am a former president. letters are being