Skip to main content

tv   [untitled]    June 14, 2011 5:30pm-6:00pm PDT

5:30 pm
it is my pleasure to be here. we are so enthusiastic about this being the new standard and also a great building that our employees will be proud to work in. thank you very much. [applause] >> thank you, mayor lee. our puc commissioners are the ones that actually make the decision about this building. all of them are here with us. the president of the department. [applause] >> thank you. it is an honor to be here for this topping ceremony. i want to thank my fellow commissioners who are here and also it knowledge a former commissioner, f.x. crowley, who was formally on the commission,
5:31 pm
who has helped. this will be one of the greatest municipal buildings in the country, if not the greatest. i have to refer to my notes because some of these stats are pretty incredible. this building will design 55% less energy than most office buildings anywhere. that is one-third less energy than most buildings consume. over the next seven to five years, it will save an estimated $180 million in energy costs. that is a lot of money that will be saved by our ratepayers. we also talked about the reclaimed water. all of the sewage will be treated on site, as well as the gray water. that means all of the demand for the low flow toilets and your girls -- urinals will be met, and over 700,000 gallons of water will be saved annually. it will also save an additional
5:32 pm
900,000 gallons that we are using at the sustainability district. it is a significant water savings that we need to pursue throughout the city. i also want to thank the mayor for his leadership on this. beginning in his early dpw days. dpw, p u c, department of environment staff, everyone who has worked so hard on this -- i remember, it must have been 12 years now when we were first identifying different pilot projects through the city that could be brain model the. this was one of the building that they identified. -- green modeled. it is so rewarding to see this be realized as one of the greatest buildings in the country. thank you for coming and we look forward to moving in next year. -- greenest buildings in the country. >> other members of the
5:33 pm
commission, andy moran, art kane is here, various members of the puc, the general manager for water, power, waste water, business services, and juliet ellis, external affairs. one of our stars is shelly campbell, our product manager. thank you. [applause] we're also joined by the department of the environment had. -- hea. d. we are going to wait for the fire trucks to go by. this started with the dpw project and we are a client now representing the dpw is ed
5:34 pm
riskin. >> thank you. as the general manager and commission president referred to, dpw has been with this project for over a decade it has really become a labor of love for the department. it is an extraordinarily complex building project, unlike our typical library or fire station that we work on. and it is not because of the exceedingly high environmental performance, but exceedingly high seismic performance, business continuity performance. this will be one of the most advanced office buildings in the country. it is really a great partnership that we have working with the puc to make this happen, but also with our private sector partners, kmd stevens, webcor and their construction team. it has been a collaborative
5:35 pm
effort. we are proud of the fact that we are not only getting this great building built that will serve the city for generations to come, but in doing it, we are putting a lot of local businesses and residents to work in the process. it is really a win win. i want to commend the general manager and commission for their bitter ship and foresight in seeing after this project had been stalled for many years, seeing this was a great investment for the repairs and people of san francisco. it was the smart thing to do. we are righproud to be part of . i want to thank the work of the rest of the pc team to get this done. starting with a man who is living and breathing this, has been for years, our project manager brooke. [applause]
5:36 pm
he is working closely with edgar lopez, who manages all of our major projects, but was here pretty much from day one. they are being supported by our city engineers and the rest of the department coming together to deliver a great project to the ratepayers of san francisco. we're so happy to be a part of this. congratulations to the puc on getting to this point, the topping off ceremony. [applause] >> as the owners, we are certainly willing to move in, but we are not building the building. representing the builders is andy of webcor. [applause] >> it is great to be here. most people do not realize this building almost did not happen. i was at a green building
5:37 pm
conference and i ran into mayor gavin newsom. he said, we are not going to build that building. we cannot afford to. i said, mayor, you cannot afford not to. this building will be an example of what all cities should build. with the energy savings that were mentioned, this building will be like no others. when the city starts to operate, they will say, why did we not do this before? it is a wonderful thing for the environment, the city, a wonderful thing for us being chosen as a builder. i am wearing a hard hat because i am a contractor, that is what we do. i want to thank my team. they are doing a wonderful job. [applause] recognize that this is not an easy building. it is a innovative and complex structure.
5:38 pm
the first time it has been done here. there is a very sophisticated mechanical system. we have some great consultants here. it is always a pleasure to work with a team at the department of public works. you are wonderful to be with. edgar, we have done this before. brooke, you as well. ed harrington, when he came into this position, he said this building would be too much. we brought it down to $140 million, kept it as lede platinum. everyone on this team is absolutely first class. it is a pleasure partner with the city. we are in good hands with mayor lee.
5:39 pm
he recognizes the importance of this kind of structure and it is always great to work with the city of san francisco and the mayor's office. thank you. [applause] >> thank you. just in time, the son has come out. mayor lee will lead us in having the crane operator bring a the beam up. >> everybody, on three, we are going to have frankie bring it up. we are going to say frankie, bring it up! >> frankie, bring it up! [applause]
5:40 pm
5:41 pm
>> is housed in a spectacular building described by the world renowned architect. it is the san francisco destination for provocative expositions and programs that explore culture, history, art, and ideas. the director of cultural affairs told us more about the mission and to give us a tour of the latest exposition. ♪
5:42 pm
>> today we find ourselves of the contemporary jewish museum. with me is the director of the museum. >> i am so happy you are here today. >> we're getting close to a milestone for the museum. it is your third anniversary coming up. >> it is. you were here to help cut the ribbon. it has been an extraordinary journey ever since. we welcome hundreds of thousands of people into the building. we welcome school groups, interests -- tourists. >> the addition of the museum to the cultural pantheons of san francisco has been phenomenon. you have fabulous exhibits. there is one i want to talk about, "seeing gertrude stein."
5:43 pm
>> gertrude stein is a local woman. she was raised in oakland. she was an extraordinary individual who helped create -- many people call for the mother of modernism. years ago, i was introduced to someone doing research on her. i thought it would be an extraordinary exposition to take her and understand her at all for complexity. that is what we have on view during the summer of 2011. >> it is full of wonderful drawings, paintings, and sculpture. >> there is incredible art on view. we have photographs. we have sculpture. we have a lot of different things. we have a little something made for her by picasso.
5:44 pm
there are five different ways of looking at her life. it is not in chronological installation. it is looking at how she is portrayed in help artists, painters, and photographers presented her and how she thought about her own style and presentation. many people think she always had short hair. it was not until she was 52 that she cut off all of her hair. the second element is called "domestic stein." alice b. toklas was her lifelong partner. they had several different homes. we know about their home in paris, the famous salon. you get a taste of what their domestic life was like. >> one thing recreated is the fabulous wallpaper. the black-and-white photos do not convey the color.
5:45 pm
>> in doing a lot of research, you discover a little tidbits. with an exhibition, at the find ways to make it come together. we found beautiful photographs of the interior of their home. then we found a tiny scrap of the wallpaper. we saw how blue and vibrant it was. we had a designer recreate the image of the wallpaper. we had it made into wallpaper so we could all experience what it would have been like to be in their home. it is dynamic and fantastic. they seem very monochromatic because you only know them through black-and-white photographs, but they had such a vibrant life. that is what the exhibition is also trying to show. the third one is the art of friendship. picasso and matisse were part of
5:46 pm
their second family. there were people she admired and worked with. we introduced the visitors to her second family in a sense. the fourth story is called celebrity stein. what a lot of people do not know is when she left united states in the early 1900's, she only came back once in 1934. we also have a section of every single first edition book she ever published. >> it is incredible to see all the first edition books. >> it is really impressive to realize not only was she a grand dame of paris, but she had an incredible writing practice. she was a prolific writer. the fifth level really looks at
5:47 pm
her legacy and how artists continue to be inspired by her image, work, and concept. >> this is a compelling reason for people to visit the jewish museum. you also have life and theater. >> we are a non-collecting museum. any time you walk in the building, you will always be treated to a range of very different and wonderful exhibitions. in our first floor exhibition space, we have an exhibition on the work of charlotte sullivan. she was a young artist in berlin. the nazis came into power. her parents sent her to the south of france to live with her grandparents. she put herself in a room for about 18 months and created 1200 small paintings telling her life story through a kind of reflection. it is another example of the way
5:48 pm
we try to bring a wide range of art and experiences to our public. we want them to find something meaningful to them. >> your institution has been in this neighborhood for three years. how do you like the neighborhood? >> this is the best neighborhood. we are the luckiest city in the world to have this kind of cultural district, to have so many museums and cultural institutions. the center of our tourist life is here because this is where the convention center is. people from near and far can be introduced to the richness of the bay area. it is so wonderful and unique. >> the city thanks you for providing such wonderful leadership and vision. >> we're so happy to be part of the city and so honored to be part of "culture wire."
5:49 pm
>> to learn more about the exhibition and other upcoming events, visit the website. thank you for watching "culture >> thank you very much for coming this morning and welcome to the rededication of the reservoir. we are happy to be here today. this represents one of the milestones in our project. we are happy to share this with you. this reservoir has been empty the last two years and today, you will hear the sound of water rushing to fill it again. it makes the city safer, provides water for customers, for firefighters, for after an earthquake. we will be updating our systems. this was originally built in 1885. 125 years old. it takes care of a good part of san francisco, places lower than this.
5:50 pm
it is an incredibly important part of our system in san francisco. it was a $39 million project and it came in under budget. we are doing it effectively and efficiently. we do appreciate the folks who worked on it. it is part of the $4.6 billion water system improvement program. this is about a half with point in that program. it is the last major project in san francisco that has been completed. there are a few more projects to be done. this is the last major one. san francisco is more safe than before these projects were done. there are a lot of projects that happened in district 11. the first was a tank replacement project that started a number of years ago. it is fitting we are in
5:51 pm
district 11 because we're finishing the major work on our program in district 11. we're happy to be joined by supervisor john avalos. he has been supportive of all of our programs and was a leader on having local jobs for people who need them. the work is happening to provide those jobs. in fact, at the end of this week, we will have six kids out worth $18 million that will help the new local hire ordinance legislation. we are certain the pilots for how to expand local hire. supervisor avalos? [applause] >> thank you. i want to congratulate you and the public utility commission, san francisco water, power, so were for your great work on this project and throughout the head ceci -- throughout the improvement program.
5:52 pm
we have projects being done across northern california and it speaks volumes about the puc staff, being able to bring these projects to fruition. these are paid for by our tax dollars. we owe it to the ratepayers to make sure that our public investments are made efficiently and a sound way for the budget. congratulations. i am excited about the track record of the puc on hiring locally in san francisco. for this project alone, we have 60.5% of the residents who are around the area working on this project. we have 6.5% -- it is 27.5%, sorry, much better. 27.5% of the workers are local residents. that is above what our current mandate is for the local hire
5:53 pm
ordinance that we passed last year at the board of supervisors. i wanted to congratulate you on that effort. 54.5% are from the bay area. 60.5% of the workers are apprenticeships workers, new workers, who are getting new jobs into this industry. the project helps to make that happen. congratulations on that. we are hiring carpenters, cement workers, and landscape professionals. we know we are providing employment opportunities for this project. i look at this as providing so many benefits to san francisco. we're providing reliable water. we are making our water system safe. we are also improving the process for many san francisco workers and businesses. those workers will go and spend money for their basic needs in san francisco.
5:54 pm
congratulations to the puc. i look forward to more of the work being done on our local monuments. thank you very much. [applause] >> thank you, supervisor. don't we love this almost summer weather? it is a wonderful place to be, isn't it? this is part of a larger improvement program and it is good when you have these ceremonies to have somebody who knows what is happening in back of us as opposed to those who come for the celebrations. julie is the head of the program and she will be talking about what we're doing here. thank you. julie? >> thank you. i am thrilled to be here this morning to commemorate the completion of this key retrofit project as well as to celebrate the construction completion of 29 other projects here in the city of san francisco. the university mount reservoir is the fifth to be retrofitted
5:55 pm
as part of the water system improvement program since 2003. i think it is important to remember that every time we complete a project like this, we are a step closer to making our system completely seismically reliable and to ensure our 2.5 million customers have drinking water, and that we have an adequate supply to fight fires following a major seismic event. how did we seismically retrofit this 125-year-old structure? we installed a number of super frames to support the roof structure. we added multiple sheer walls and stained -- and frames. we also drilled 500 miles through the bottom of the reservoir to anchor it to the bedrock to prevent it from sliding. we completely sealed and
5:56 pm
waterproofed the roof. with all of these upgrades completed, this reservoir will be possible of heating be -- feeding the entire city following a major earthquake. be completed some improvements to the inlet-outlet piping of the reservoir that will allow us to backseat our transmission system so that customers in the upper peninsula do receive water following an emergency. i am really proud of the hard work of our project team. there to be commended for successfully delivering the project and also for their dedication to the program. i also wanted to highlight the pretty impressive track record of the regional project manager, howard fung. job well done, howard. [applause]
5:57 pm
thank you. >> thank you. just to make sure we understand, this is a partnership of a lot of folks. the general manager of the puc, the general manager for infrastructure, the assistant manager for external affairs, and a lot of you who have worked hard for the puc, we appreciate it. we also have the leadership of the puc, the commissioners to make the decisions. we have the president and the vice president of the commission. francesca is here to make another announcement today. [applause] >> i am so happy to be here to celebrate this project. i think it is appropriate, the weather we are having, as we dedicate the reservoir. it is a little strange to be getting this rain, but we appreciate every drop of it and we are happy to have a big reservoir. i am excited to announce that we have plans to install three small hydroelectric generators
5:58 pm
here on site. that is a clean, renewable energy source, something that we are committed to. it will replicate on a smaller scale of our large scale hydro project up that hetch hetchy dam . we are thrilled that will be on line. that will be done by 2013. 200 kilowatts per day will be generated by those three facilities, those three generators, enough to power approximately 200 homes. we are excited about that as part of our efforts to move away from dirty, empowered -- imported power sources in san francisco, and an example to our commitment to a clean, renewable energy future. we are excited about that. i want to congratulate the power enterprise staff for this project. they are doing everything they can on the efficiency front to make us a clean, green city.
5:59 pm
i want to acknowledge them as well. it is a team effort. not only the water enterprise, but the power enterprises making this a success. thank you to them and to everybody at the puc for making this happen. [applause] >> now we have a few gifts for the people who are speakers. then we will walk down and turn the valve. when it is totally open, it will bring in 2.5 million gallons a day into this reservoir. it holds 80 million gallons. it will take a month to fill up completely. you are welcome to come down. watch your step. we will make the last turn of the vowels. you will start to hear the rush of water going into the reservoir. [water rng