tv [untitled] July 28, 2011 3:30pm-4:00pm PDT
3:30 pm
the coverage maps that we received are fairly uniformly coded. it is ready for not very good coverage. yellow is usually sort of a coverage but it isn't great. green is indicated in those areas where coverage is fairly good. and we usually get maps that show the existing condition and what happens after the end had a dozen. the language is not all exactly the same. verizon uses yellow to mean marginal coverage. at&t uses the service-under high demand periods.
3:31 pm
verizon and at&t, are these maps the same? as far as the department is concerned? >> that is my understanding. president olague: i call a question. >> on that motion. commissioner antonini: aye. commissioner moore: aye. commissioner sugaya: aye. commissioner miguel: aye. president olague: aye. >> so moved. it passes unanimously 5-0. you are on item 16. request for a conditional use authorization. commissioner moore: would you call it by name please? >> mycology's.
3:32 pm
3:33 pm
with the requirement of the planning cut and is consistent with the 1996 facility guidelines. the proposed location is a preferred site for wireless transmission and it is the location preference. the project's sponsors comply with all of the strategic requirements. including holding a community outreach meeting within 500 feet of the proposed location. it will consist of maintaining a completely -- it is a service that is in demand for public goods. from the proposed facility, it was reviewed by the department of public health and found in compliance with the public exposure. staff has received no opposition to this project. given the findings discussed, we recommend approval with conditions.
3:34 pm
president olague: project sponsor? >> i represent metro pcs. this is the location of an existing site and we are proposing to modify it by removing a couple micro sells and replacing it with a new panel. i want to clarify the project description. their proposed inside the building. i can be available for any questions, and there is also the engineer that is available as well. president olague: public comment is closed. commissioner sugaya: i have a question for the rep.
3:35 pm
if you were here earlier, you heard testimony on part of at&t a stating that the coverage was approximately four square blocks. your coverage seems to improve more area of then forced her blocks. based on this coverage map. is that because you are using different technology? >> in this case, the area in which we are intending to provide coverage is a little unique because it is adjacent and our coverage is trying to get along the adjacent neighborhood association. the coverage objective is different. commissioner sugaya: i move to approve. commissioner miguel: second.
3:36 pm
>> on the motion to approved commissioner antonini:. aye. -- approve. [roll call vote] the motion passes unanimously 5- 0. that will place you ought items 17. consideration of the adoption of ceqa findings. >> they're here today seeking authorization to propose construction of the 68-foot building, and ground retail, spaces, at 306 parking spaces.
3:37 pm
the project also seeks exception for exposure, off three loading, horizontal mass production, and the products complies with the first source hiring program. the product will convert to a site into a productive mixed use development that includes a significant site upgrades. the project's design is consistent with neighborhood character and is inappropriate and development for transitional development patterns. project will utilize controls and have the appropriate impact fees. additionally, the existing treaty rights of way has been planned for the development of a public park. on july 18, devoted to support
3:38 pm
the incoming agreement. his it is designed to include a play area, and of running, and landscaping. with that, i conclude my presentation. staff recommends approval with recommendations. president olague: project sponsor? >> i am the partner representative. the last time we were in front of the was back in april of 2009
3:39 pm
when the commission certified unanimously our eir. after the city approved area plan, primarily urban makes use with a height limit. since then, constrained capital markets have delayed our request for a large project authorization. they gave me the green light to take the project into implementation, provided that i do so using resources other than their own. so we decided to partner of and have worked collaborative lead with your staff in finalizing the design. i simply want to urge the commission to grant the authorization and to do so today, if appropriate. as indicated, this site has been in design since 2004.
3:40 pm
i have participated in a hundred community meetings, planning meetings, public presentations over the course of the last seven years. i am proud of the project, our team, and your staff that have all worked hard to bring you a great project on the strategic plans site the i believe will ignite the implementation of the area plan. i will turn it over to the vice- president of development. >> we are both excited and thankful to be here. we have a great project a share and we're thankful because it took a lot of hard work by city staff to get us here.
3:41 pm
they are a developer and operator of the accused community. we are long-term holders of our assets. wheat on the two communities in san francisco. both of those were communities that we purchased after they were up and running. since 2007, we have been working with the task force at the golden gate bus parking yard. we have attended a hundreds of meetings with them, and it has been a very slow process to come to a meeting of minds about what it is that makes a good development for community while making sense for a project sponsored. that is the reason why we got involved in this project. i was tracking his efforts to get the project of this point, and we are excited to be part of it going forward.
3:42 pm
as you know, the sight which changed in 2008 -- site was changed in 2008 to allow mixed use housing and a height of 68 feet. this doesn't happen by accident. it has taken seven years, hundreds of meetings, over 30 iterations, and since we got involved, we have changed in the color palette to accommodate feedback that we have gone from the community. that is why we encourage you to approve the application before you tonight and allow this project go forward because we think it is time. our goal was to employment the area plan to the best of our ability. we paid particular attention to
3:43 pm
land use policy that encourages development of making income housing along sixteenth street. as you will see, the project includes the construction of 467 units, and average unit square foot of 765 square feet. and the inclusion of the affordable housing requirements totaling 55% of san francisco median income. there were presentations with the various community groups, individuals with the community designed its. those efforts have resulted in endorsements from various groups and individual community members. while david will talk to you about how the site relates to context, i want to highlight a
3:44 pm
couple of things that are amenities for future residents. we find that residents want amenities within the project and very close to the project. this is away for them to accommodate what they need inside their homes. the need for secure parking on the level in which people live. community gardens, there are stations that allow for things to be done outside of the home. david will take over from here and walk you through the site plan and product design. we will finish with where we are on the process can be available for any comments that you might have. >> i am the architect. his knife cannot be here at 10:00 at night.
3:45 pm
sorry. [laughter] this is a gateway site which is a combination of three neighborhoods. as we said, it sounds like an extinct species, but it is a mixed use housing. zoning is in place, and we have in a buffer zone. the height limit which is great to have that done. we are in walking distance. it is 31,000 jobs here.
3:46 pm
it is a great place to do housing and in terms of linkages, it is located at a couple of major bike paths. it gets relocated to stop in front and is about a mile to the west and to the east. you can go to the train station and about 15 minutes. here is the site plan. it is a very funny piece of land. the right of way was originally a giant boulevard. it will go all the way to the bay only a part of this got built. it divides the site into two sections. we're calling it the flatiron
3:47 pm
building in the north building. part of this plan was breaking these blocks. there is a pedestrian public muse. you'll see a 32 foot strip of land that is the 18-foot high buildings with an open space on top of the faces the restaurant. at that corner is a little point for will have some seating and community garden next. this shows the retail areas set up for restaurants. we have a 17 foot floor so that you see the major areas for retail.
3:48 pm
in between those, we are doing a flexible yet so you can set up a more industrial partisan units. this shows the space with 7400 square feet of that. the notion will be that this will be a fairly small space. there is a bike station, and there is a viper room on the flatiron building. there is room on each floor so that you take your bike up and park it on your floor that is more secure and makes more sense. this shows the parking spaces. the spaces are not on a list, but everything else is.
3:49 pm
the time we get all of these activities is in, they're not a lot of ground level left. it is a 0.65 parking ratio. this shows the active edges. the runaround the entire site. there is some service within that period it shows the exposure that is 110 feet long. 6% of the perimeter. we have an idea that will make it an interesting exposure. iran water garden and you see the lift going up and down behind. this shows where the lobby and
3:50 pm
trees are. it is a large building that is not a high rise. we have three major lobbies and related injuries are spread all over the site. one reason we are asking to do the street loading on st. in three locations we think makes more sense to residential people and makes more sense. it makes use for more productive uses. it is 42,000 square feet, 10% more than the requirement. and the light green is on the second level and private. there is the roof deck as well.
3:51 pm
this is a dwelling in exposure, it is one of the exemptions we are asking for. there are seven units at 1.5% of the macau that don't quite meet the courtyard exposure requirements. there are located in that area. cahow a sidewalk would have set the ground floor of the building back about a wider public right of way. so from the face of the building, it is 15 feet. and we are proposing being willing to do sidewalk extensions. it would be an additional 7 feet.
3:52 pm
this is a challenging building because it is large. live been thinking about the colors and this is our diagram. we have the kind of colorful colors. it was sticking out, and so we sampled the san francisco skyline. we came up with this palin which we will apply unbacked. here is the site from missouri, and we of the building next. the show's the flatiron building proposing metal building with cut ends. it has the high ceiling commercial on the ground floor and next.
3:53 pm
as you walk to the park, this is the second floor and you would look in. and then to the left, you see the lobby covered by a green screen and the community room that overlooks the park. it is a screen with plants growing out of its. looking back to the building. you've seen what we have done their working with the planning department. there were concerns about this building. so we may get better. this is a look down town, so they don't look directly at the freeway. this is the grudge. this is the exposure at the bottom and you see the
3:54 pm
corridors. [chime] president olague: how much more time? >> i will talk very fast. this is the county restaurant looking back below, the public space. the building above. this shows how that works. you see how high the ceiling is. this is looking through the building, that public way. 20 feet wide. 40 at the top. there are patios and decks, there is the public open all the time. this shows the bike station and people are using it right now. this is the view from the corner
3:55 pm
of connecticut. there are some outdoor seating that his restaurant space. you see what the code calls for. what we have done is put a bunch of little notches all along and we think we have articulated a more 5 way. finally, here is a picture of the park. president olague: close out, i think we arand we may have quesf course. there are several speaker cards.
3:56 pm
>> of the afternoon, president and members of the planning department. we are not opposed to development of this area and will afford to removing the blight. who have some concerns regarding the large number of units as well as just for the size of the property. we do believe that these exceptions should not be granted. i have a list that i will quickly go through. the planning cut section, and the project does not comply with this section and several areas not limited to the requirement of 25% rear yard the death -- depth. we're not sure it will be a public park. it looks like it will be used to
3:57 pm
allow for this exception. we are concerned about that. we're concerned that it will be the appropriate 25% rear yard. these will be included but not limited to the requirement facing the street. >> the purpose of this cut is to foster healthy community of advantages. and we believe that the disadvantage will be exploited in this case. additionally, the lack -- there
3:58 pm
are minorities and other economic disadvantages. we believe that allowing this is a family friendly. this is included but not limited to the requirements for active use there is nothing to improve local businesses available and service companies, thereby we believe it will increase the crime rate. we believe that the planning section cut is in compliance with -- it is included but not
3:59 pm
limited to the requirements of all to the living spaces for residential use and the mixed views in the urban district. when the area between 200,500 thousand square feet. -- 200,000 and 500,000 square feet -- [chime] president olague: thank you. >> afternoon, commissioners. president olague. i'm the co-founder of the neighborhood coalition and i know that ma
124 Views
IN COLLECTIONS
SFGTV2: San Francisco Government Television Television Archive Television Archive News Search ServiceUploaded by TV Archive on