prospective civil grand jurors. our goal is to develop a pool of candidates that is inclusive of all segments of our city's population. >> the jury conducts investigations and publishes findings and recommendations. these reports them become a key part of the civic dialog on how we can make san francisco a better place to live and work. >> i want to encourage anyone that is on the fence, is considering participating as a grand jury member, to do so. >> so if you are interested in our local city government and would like to work with 18 other enthusiastic citizens committed to improving its operations, i encourage you to consider applying for service on the civil grand jury. >> for more information, visit the civil grand jury website at sfgov.org/courts or call
4:46 pm
>> whom to the department of building inspection brown bag lunch. this is part of our ongoing series, third thursday of every month. one of the few walking tours we're doing this year. today we're going to talk about high rise buildings in san francisco. we're going to look at just a couple of them. to talk from an angle that most people don't usually see which is smied the buildin inside the. >> with everything stripped off, all the sheetrock, and the ceiling. you get to see the bones of the building. >> and the ventilation and the fire protection. so this is a really unique opportunity. should be a lot of fun. feel free ask questions as we go. we'll here with path buscovich, engineer, engineer for many of the high rise owners in san francisco. we have other snerkts from the e
4:47 pm
department of building inspection. we're going to start right now by walking down into the concourse lower level and take the freight elevator up. so come on with us, okay? [ ♪music ] >> okay. we are up here in one of san francisco's major high rise buildings, one of the tallest buildings. not the tallest but one of the tallest. >> the tallest occupied floor building in san francisco. >> everybody has a slice of really soon. actually the tallest building is the transamerica pyramid building. you could say it's the sutro tower, transamerica pyramid is the tallest building. we're here and we have the unique opportunity thanks to the building owners and the managers
4:48 pm
of the building to come in and take a look at how the building is made and ough all of its mechanical systems. what keeps a mooirj major high rise building -- how many stories is this building? >> 50 stories, plus or minus a few. it was designed in the '60s by the firm buneir, who are the preeminent structural engineers from 1925 until this building. and then after this building they were priced out of the market by architectural firms that gave away the engineering services. the form of brunier was about 30 years ahead of their time. their designs are brilliant. and if you look at buildings that they did in the '20s and '30s it was like this guy was so smart, it was mind-boggling. >> so this building is a high
4:49 pm
rise building and a high rise building is one which is more than 75 feet from the ground, from the sidewalk to the highest occupiable floor. >> which is generally seven stories. >> typically more than seven story buildings become high rise buildings. and in san francisco, there are about 500 high rise buildings. we are requiring the fire pring lers be added to all -- sprinklers be added to all high rise buildings except for certain residential uses only. >> and historic. >> historic buildings, now sprinklers are required in essentially all high rise buildings. so this is to pick up the ones that were built up to that period. >> one of the important things about the nuances of sprinkler systems. sprinklers are not intended to put out the fire. the sprik ler -- sprinklers are intended to keep the fire install enough for the
4:50 pm
firefighters to put the fire out. >> the high rise buildings able to be built, the thing that loud them to be built, you all know what that was, i hope. >> which was? >> 150 years ago, otis designed the first operating elevator with safety features so if the rope or cable broke wouldn't fall 14 floors. and that was in 1854. we just had the -- we all celebrated wildly the 150th anniversary of otis's invention of the elevator. and it was with that that we then could combine new methods of construction, steel construction and other construction, to build high rise buildings. >> because after about six floors you got kind of tired of walking to your office. there was an upper limit of how tall you could build the
4:51 pm
building, and get people to walk up to the top and rent space. >> there are super-tall buildings, how fast could you make an elevator accelerate and decelerate and make people comfortable. i'm lawrence cornfield, chief building inspector. the building code is very interesting, it addresses things beyond the structure of the building and the steel and the floor. it addresses things that make people comfortable. so how fast the elevator goes is the sort of thing that the building code addresses that are sort of social issues. for example, mod yuls of elasticity of flor. you want to stiffen the floor so you don't feel uncomfortable. >> one thing you don't want to have happen, you're sitting at a desk and someone is walk down the hallway. if a floor wasn't designed
4:52 pm
correctly, your body would actually perceive the vibration and it will be annoying to you. so there is design criteria not just for strength but for vibration control of something called foot fault. >> it all comes down to sort of the nonsafety nonstructural elements which are people being comfortable and in high-rise buildings that has a woal lot of factors. it includes elevator speed, includes how much a building can sway. >> includes the air. keeping a building cool in the summer and warm in the winter. because all of these windows, none of these are april rabble windows. this building is a completely contained structure. that is the design of all modern high rise buildings. >> let's get back to the building. now we can build since the 1850s a high rise building. and most of them are built to steel frame. >> the building code basically said after a certain height which was 65 feet, you had to go
4:53 pm
to a steel-frame building. and that code has been in fact since the -- in effect since the '20s. once you went above a certain height you had to go to steel frame. if you looked, even in the '06 quake, steel-framed buildings, almost everyone i know except 1 in the '06 quake went through the quake just fine except one that had a lot of damage. it's interesting, the structural steel institute did a survey of san francisco after the '06 earthquake, that happened was the only building they omitted in their report. >> the williams building which actually had -- >> a lot of damage. all the other buildings went through fine. >> the steel frame is comprised of a number of different parts. >> there is a square box column here. and underneath this box column
4:54 pm
is fire proofing. it is not asbestos fire proofing. you don't have to worry about the asbestos. this is a nonasbestos fire proofing. it's got this much fire proof coating, so that for four hours, you could have a fire here, and the steel column would be protected. and the code regulates, that this is four hours, the girders that frame into this are three hours. the beams that frame into the girders are two hours, and the floors must be two hours. and that tells you how much, how long a fire can burn before there can be a problem. >> right. so this is sprayed on, onto this field. underneath this blueish fire protection, there is a structural steel column here. >> huge. >> huge. it is holding up another 30-some floors above it. >> steel woen won't burn.
4:55 pm
>> so why do you need fire protection? that's a good question. >> what happens is around a thousand degrees fahrenheit which is somewhere the level of burn, depending on what kind of combustibles you have in the office, steel softens. and it's not good having a soft steel column. >> steel loses its strength. >> it loses its strength in fires. so this is to protect that. with the fire suppression system, so that the firemen have four hours to get here here. >> we have a teem column. this stuff is sprayed -- steel column. this stuff is blue, this particular building owner uses blue to show this is noncontaminated fire protection without asbestos. one of the big costs of retrofitting high rise buildings
4:56 pm
when you have to open it up like this is you have possible asbestos contamination and it's a big area to put the area into containment and to mitigate. >> they paint it blue because they really want to make sure everybody knows, this is not asbestos. >> okay. there's another way to do field fire protection. there's a kind of paint. and it's been used for the last 50 year or more. you can paint on steel, it's quite excessive -- expensive, it is fire proof paint. you have to protect all of the industrial elements except for those which are only for earthquakes. the presumption is, you're not having an earthquake at the same time there is a fire in the building. >> income, you could have an erik and a fire. >> and then an after-shock. all the elements have to be fire protected. so we've got the column, the
4:57 pm
girder. >> if that girder frames into that column right there on that corner, in between the girders are beams, as you can see, these bumps. and then spanning between the beams is a concrete floor with a metal deck. and it got fire proofing on it also. so lots of fire proofing, concrete also doesn't burn. so they're very conscious ever making sure that the basic structure of this building is not combustible. and so the sprinklers are basically for what the tenant brings in. >> now, you see the big holes up here in the girders. doesn't that weaken the girders when you put giant holes in them? >> some of the holes don't have reinforcing rings. the other holes do. if you go to the original design you'll see all these holes all designed out individually and when they finally do a build-out those holes are there to install
4:58 pm
these deducts. and -- >> so a lot of times when you go into a building, especially a wood-framed building, they're up there cutting holes in the industrial members. >> in the wrong spot. >> in the wrong spot and the building inspector says, you have to get your building inspector to check these things out. >> every one of them, there are about 40 sheets showing every one of these beams with every one of these holes in them. some of these deducts have been taken out and when they come back in and put in the heating, ventilating, air conditioning system, they'll put the deducts back in. the air comes into the building, through these deducts, from below, and -- ducts from below and come in to theseth louver system and the air comes in and the air gets sukt out through the ceiling. and they are recirculating the
4:59 pm
air out of the system at a very high rate. >> one of the requirements of heating and vent lating is that you put fresh air in to mix. you you have to have fresh air. it's very finely tuned how much fresh air and how much -- and the new california energy code standards are very strict as to exactly how you balance it so you don't have to use too much heat or too much cooling power in these buildings. >> yes. and a libera little bit of a ner too is they can pressure nuance, the building is at a higher pressure than outside. all buildings have little leak points. if they want they can pressurize this building slightly higher than the pressure on the outside such as this air is being pushed out as opposed to the outside air being sucked in. >> and speaking