tv [untitled] February 14, 2013 1:30pm-2:00pm PST
1:30 pm
retrieval shaft. misrepresents the soil investigations that have been and will be performed before construction begins, and incorrectly describes the impacts of construction onto nearby properties or the associated effect on the adjacent groundwater table. in conclusion, we're very confident that the work proposed is structurally sound and statements to the contrary are without merit and should not influence the city's or stakeholders' evaluation of our proposed tbm retrieval plan. that concludes my presentation. i'm available to answer any questions you might have. >> thank you. we may have questions later. >> good afternoon, president fong and members of the commission. my name is kevin guy with planning staff. i'm here to speak to the development project that is associated and up for consideration today and the entitlement actions and the specifics on those. so, the request before you
1:31 pm
today is for conditional use authorization to allow development on the lot greater than 5,000 square feet, to allow a nonresidential use greater than 2000 square feet, to allow the demolition of a former movie theater, and to allow restaurant use for the type 47 abc lice license. and then the commission would also make recommendations regarding the proposed reclassification of the site from a 40 foot to a 55 foot height limit and the adoption of a special use district or sud for the site. so, the development project involves the demolition of the existing vacant feeder and the construction of a new five story over basement mixed use building containing up to 18 dwelling units, a restaurant measuring approximately 4700 square feet, and up to 27 off-street parking spaces. and as has been described, following demolition of these existing building and prior to the construction of the new building, the site will be utilized for extraction of the tunnel boring equipment associated with the central subway project. a project was previously approved for this property to rehabilitate the existing feeder and convert the building
1:32 pm
into a very similar program of uses as a building proposed by this application. the purpose of the sud is to allow the construction of the project that was previously approved in a manner of >> rehabilitation project to resolve areas of conflict with the planning code that would not allow the project to proceed as new construction. and to address several specific issues regarding the program of uses. so, the sud would address rear yard dwelling unit exposure, off-street parking, building height, ground floor ceiling heights, the allowing of a restaurant use at this site, allowing a nonresidential use exceeding 4,000 square feet, and allowing the reconstruction of the existing blade sign that is on the theater. so, i'd be happy to address any of these sud provisions in more specific detail. i should note that as introduced by the board of supervisors, the sud would only become effective once a lease for the use of this site is authorized by the sfmta and five years from the initial effective date. so, to reiterate the purpose of these actions is to enable
1:33 pm
construction of the project as previously contemplated and approved by this commission. in the previous approval the commission did find that the project was designed to respect the overall character, massing, scale of the district. and the project was desirable for and compatible with the neighborhood. the newly constructed building would reflect the design of the previous rehabilitation project and would not exceed the height or roof profile of the existing building. the only minor changes that i would note to the project are to enlarge the restaurant space to include an area that was previously a separate retail space. also subterranean vault that would be a remnant of the extraction of the boring equipment would be retained and used as accessory space for residential units on-site. there are a couple of items that i'd like to pass out to you now. the first is a set of communications in support of the project that were not included in your packet. the other item is an amendment to the draft motion for one of the conditions of approval to do with approval term.
1:34 pm
essentially as drafted in your draft motion right now there is a five-year approval term for the conditional use. this amendment would sink row nighx the term of the approval to the term of the special use districttion and this change is being requested to coordinate with the terms of the lease that were agreed to. just recently following publication of the staff report. so, in conclusion staff recommends approval of the conditional use authorization and staff recommends that you recommend to the board of supervisors to approve the sud and height reclassification. * this concludes my presentation. i'm available for any questions you may have. thank you. >> thank you. >> good afternoon, commissioners. i'm brett gladstone, partner in the san francisco firm of hanson bridget. i'm here today speaking on behalf of the project sponsor royal campus. i'd like to introduce some
1:35 pm
members -- is it 3 minutes? some members of the team and i'd like them to stand up as i introduce them. first of all, my client [speaker not understood] campos. and my co-counsel, jonathan rodriguez. jonathan will be available for questions on construction issues and lease with the city if you have any. i'll be talking about the planning issues. i'd also like to introduce consultant martin kirkwood and consultant jorge mandragon. first, i'd like to thank the city, particularly scott sanchez and kevin guy, for their hard work on this in the recent weeks, and david chiu, supervisor chiu and his aide, justin true as well. this is the third or fourth time i've appeared in front of the commission in the last 20 years on this project. i represented previous developers in trying to make
1:36 pm
financable a rehab movie theater with a dinner theater on the second floor. we had to go through conditional use and rezonings. that didn't prove to be economically feasible. silver leathers came before the commission. however, this is the first one by mr. campos, my client, and i was at the commission in 2009 when you approved this 6 to 1 with dozens of community members supporting it in 2009. unfortunately, as you know in that period, the econ kind of fell apart and financing and so did equity. and when you approved, it was not a good time to get financing and start construction. * economy now the aloe am -- economy has come back, lending is available. the client is ready to go
1:37 pm
forward and start with all the final permitting when the city claim to the client a few months ago and asked that his construction be delayed by reason of using the site for up to two years for removing the boring equipment. and since then my client has agreed to delay his construction. and there are some risks. however, it seems like it's what's best for the city and the neighborhood, and was willing to come back before you and is today on essentially the same project. but instead of a demolition -- excuse me. instead of a rehabilitation of the building, it is, of course, a demolition. since the three city officials before me have described the project in great detail, i will not make any further remarks, but i am available for questions as is my co-counsel
1:38 pm
jonathan rodriguez. thank you very much. >> thank you. opening it up for public comment. i'm going to call a few names. michael barrett, howard wong, aaron peskin, and richard hanlon. good afternoon, commissioners. i'm michael barrett. i'm happy to be working with save muni and i'm against this project. other reasons i'm against the project is because the tunneling was fine at the old location, which we weren't too excited about. but since that we've done research and development and every major city from budapest to stuttgart has had terrible reaction with tunnel boring
1:39 pm
machines causing tunnel collapse. that's something that we should definitely consider. now, i'd like to mention that last month, ed reiskin made a proposal saying that i'm happy to report that we continue to make progress with the pagoda palace plan. the effort to change the retrieval site has involved a significant amount of work on a very tight timeline. the strong support of supervisor chiu, the mayor's office, we have worked closely with several city agencies including the planning department, the city attorney's office, and the department of building inspection to try to make the pagoda palace option a reality. one thing that was left out by mr. reiskin, all of the employees of the mta, were these citizens of san francisco and the business owners in
1:40 pm
north beach. if anybody were at the meeting in november, the first time the north beach merchants were really notified by the mta or anybody, there was a huge uproar against this project. it should stop in chinatown as originally planned. there is much less risk of problems with the tunneling. and quite truthfully, commissioners, i don't know how many of you take public transportation, the muni. i take it all the time. coming down today we had outrageous service from muni on a bus on van ness packed with people. in the middle of the trip, two [speaker not understood] from the mta got on to check everybody's id after everybody had paid already. my attitude towards that is why give them tunnels and tunnels when they can't even run the
1:41 pm
above-ground properly? thank you. howard wong with save muni.com. i will be submitting today a supplemental letter from our attorney lipe gaffney wagoner dated february 14th, which will supplement the original letter and exhibits that were submitted on february 5th, 2013, by lgw attorneys. we had submitted one original letter. i'm going to submit seven copies of that february 5th letter and eight copies of the -- our new february 14th letter. we stand by our original contentions that the pagoda theater extraction site does require a subsequent or supplemental e-i-r.
1:42 pm
in particular, i'd like to read item 2 of today's letter. approval of the special use district violates the conformity requirement of state law. the proposal to adopt the so-called special use district, the one parcel of land is for the express purpose which is to grant the owner an exemption from numerous zoning rules is in essence a variance. as such, the city must comply with the procedures and make the substantive findings required by state and city law for approving a variance, which this proposal fails to do. the pagoda theater site is obviously much better than the columbus avenue extraction. we have worked and supported. our neighborhood merchants and
1:43 pm
neighbors not disrupting the business community for over a year or two. we also have a strong feeling that the pagoda site's $9 million expenditure to extract tbms which have salvage value at most 4.4 to $6 million is illogical. by not even extracting the machines at the pagoda, by varying the machines as has been done in new york city, in brisbane, australia, in the tunnel in the english channel, where machines are either lowered below tunnels or shifted to the side or [speaker not understood], that machines can be buried. machines can be extracted technically at any point in a project. the chinatown retrieval of the tbms was the base project in the approved e-i-r.
1:44 pm
it is technically feasible. it saves two extending tunnels that are about 4,000 total feet, saving about $70 million. why not save $80 million and put it into muni? thank you. president fong, commissioners, my name is aaron peskin. i had the pleasure of voting for the environmental impact report in this matter a number of years ago. i think the previous speaker spoke to some of the alternatives. i think the current modified proposal has not been well thought out as a matter of policy, as a matter of fiscal policy, and has not been adequately analyzed. but i am not here to speak about that or my beliefs that section 106 of the nhpa have
1:45 pm
not been complied with, [speaker not understood] has not been adequately complied with. i'm here to speak about item 7c on your calendar which is really the substantive thing before you today for the board of supervisors would have to act on the text amendments in the first two matters. it is my contention -- i'm sorry that deputy city attorney ms. stacey is not here for perhaps she can render an opinion for you -- that the conditional use is not legally before you today. i do not believe that you can consider the conditional use until after the sud has been adopted by the board of supervisors. i don't believe that you can consider a conditional use for various uses that right now are not permitted under the code. section 121.2 provides in the north beach ncd, nonresidential use sizes of 4,000 feet and above are not permitted.
1:46 pm
i don't think you can consider a 4700 square foot thing until the law has been changed. section 7 80.3 is implicated, as is section 22 1.1. the bottom line here is that i believe as a matter of law, commissioners, respectfully you have the cart before the horse and you cannot adopt this matter until the law has changed in such a way that you can issue the conditional use. * thank you for considering my comments. tough act to follow. commissioners, my name is richard hammond, long-time resident of north beach. and a couple of decades ago in my capacity as a concrete contractor and a foundation contractor, i dug a tunnel under bake man broadway for parking garage. you can see it when the garage doors open.
1:47 pm
i did another one down the street, another long tunnel, 30, 40 feet. i did one on larkin street. there is nothing exotic about the -- in construction terms about what's being considered here. there's nothing unique and nothing dangerous and nothing exotic, nothing that hasn't been proven and done. >> thank you. i'll call a couple more names. joan wood. nan wroth, and lance curtis. good afternoon, commissioners. i'm going to take just the narrow aspect of this. the director reiskin and the project manager funge and david chiu particularly have all resisted explaining why the chinatown -- >> excuse me, ma'am. could you state your name for the record?
1:48 pm
i'm so sorry, joan wood. and i've been since 1962 continuously a resident of north beach. and my particular objection is that the extraction, the boring machines in chinatown has not been explored. questions that we've been firing off for a couple of weeks to director reiskin and project manager funge and particularly david chiu who was thought to be our savior for a while of the north beach merchants, but he's gone over to the dark side, is one way i might put it. i've been going to meetings in mr. funge's jurisdiction four or five years. in the beginning they were going to back up the boring machines. for months every time i went to a meeting he talked about backing them up all the way from chinatown to fourth and king street. and then that plan never was heard from again. the city was going to rent them at that time. then it became that the city
1:49 pm
was going to buy them. we didn't hear any more about the extractions and we assumed they were still going to be backed up. north beach really wasn't surprised the fact there was going to be an intrusion upon us. we did know if we red the e-i-r there were going to be 7 extra blocks of digging of the tunnels from the last station in chinatown. and it was kind of late in the game when we learned about it and we did object to that, but nobody paid any attention. so, suddenly drilling started. they were moving the utility lines right at washington square park. and that aroused the ire of north beach. and david chiu stepped in and he was going to help us and there is a lawsuit by mark brewin owe about it, but somehow the extraction of the machines that's been moved all right. it's been moved across the street. * and somehow an e-i-r, supplemental e-i-r was almost immediately issued building on
1:50 pm
the previous awards permits that were given to [speaker not understood] campus who had abandoned his project. we are told now he couldn't afford it then he could afford it, and then his lawyer said months ago -- now, this happened in november. i kid you not. months ago, however, the city approached him about holding off on building something a little suspect there. we want to know why these machines cannot be extracted in chinatown. it would save $70 million. the only explanation mr. funge has ever given is it would disturb the community and it is deeper in chinatown than it is in north beach. i don't accept those as valid explanations for why these can't be removed in chinatown. thank you. hello, my name is nan wroth. i've been a 50 year resident of telegraph hill in north beach. and also i worked as a city
1:51 pm
planner in my working days. i'm now retired. i had some experience with environmental review. i first of all, because i might get cut off short here, i want you to understand i support not extending the tunneling to north beach and not extracting the tdms at the pagoda site. i also urge you to consider the potential extension to fisherman's -- to not consider the potential extension to fisherman's wharf until adequate engineering studies have been done to establish the feasibility and potential impacts of that. now going on. i would like to know to what extent the conditions attached to the original planning commission approval for the pagoda project have been modified in regard to the project being presented today. i notice some significant differences in the legislation going to the board of supervisors. for instance, it was my understanding that the project as originally permitted was not to exceed the envelope of the
1:52 pm
original theater structure. the legislation being proposed at this time simply says that now new construction is not to exceed 50 feet. without mention of the original building envelope. the original planning commission approval came as a result of hearings and consensus building on the part of the planning department and the commission. now all there has been, very restrictive community input, heavily altered by the mta. for example, misrepresenting community support of the pagoda alternative. at both of the community meetings, the majority of people in attendance opposed it and negotiate behind closed doors, back room politics to say the least, what other changes are being contemplated or negotiated that we, the public, may not be aware of? furthermore, many questions have been raised in regard to the risk to adjacent properties. not even mentioned in the e-i-r is the most at-risk structure on the northwest corner of
1:53 pm
columbus and filbert. the narrow e-i-r does not mention that building or the playground across the street at st. peter and paul school. the building was tagged after the 1989 earthquake and never repaired. the shifting of the building is quite evident from the street and many of the double hung windows no longer function. an e-i-r process that ignores this issue is an inadequate e-i-r process. it struck me as a cut and paste project. i also understand the tunneling will go underneath the bank of america building at stockton and green, again, omitted from the e-i-r addendum. this is not a modest development project. it has significant potential impacts on the community. it deserves a more thorough environmental review. up to now it was treated as an afterthought, not likely to occur. that is no longer the case. thank you. >> lance carnis.
1:54 pm
good afternoon, my name is lance carnes. i'm a north beach resident. i'd like to hit two points. one is the underground water flow problem at the pagoda site. and to this presentation by mr. reiskin and mr. funge, they did note that they could drill this -- dig this hole, pump out the water and everything would be just fine. however, behind their presentation was -- these are actually fairly serious problems and their timelines to solve them in one month before construction begins. this problem scuttled a previous project at the same site in the early 2000s and i think if it's not adequately
1:55 pm
planned for and taken care of, this will be a serious problem. the project may not be successful. there may be a hole there for longer than they anticipated. there were some problems with overflow of the water into adjacent properties and businesses. the second area, disturbance to the neighborhood is a restaurant right in the shadow of the pagoda theater called piaza pelagrina. with construction and noise likely to be there, it would probably ruin this business. there are three other businesses nearby that the site, bottle cap restaurant, sushi hunter restaurant, and an office building will also be adversely affected. in addition, the yacht races are coming up and this is a very popular area to come and celebrate, spend some money.
1:56 pm
i think with construction going on there, with cranes and whatever going on dust, people would probably not go in the heart of that area to dine during the yacht races. third is i'd like to encourage the mta and i'd like to encourage you to deny this project, but encourage mta to bury the tunnel boring machines in chinatown. i was a little stunned today. once again here, mr. reiskin said burying the tbms in chinatown would further [speaker not understood] the project. i don't know. dos of other projects around the world, the tunnel boring machines were pulled out to the side. future progress wanted to happen it could certainly occur. * so, yeah, i'd really think that burying in chinatown is the
1:57 pm
logical solution. in the future if funds are available and plans to extend further north ward, i think that would be the time to consider a north beach station and beyond. thank you. >> is there any other comments, public comment on this item? you can leave it there and step up. commissioners, my name is mark bruno. it was mentioned earlier that i'm involved in a lawsuit. what was not mentioned is that lawsuit against the city is funded by and includes many businesses in north beach, many of the businesses that you probably have gone to, restaurants and retailers in north beach. and my only question for the commission with regards to this special use district is this one. we know, because we begged supervisor chiu and director ed reiskin and others, to move the extraction site from columbus and union over to the pagoda palace. and they've done their best to
1:58 pm
do that. it's quite an accomplishment. but i think from a policy issue, whether it's about this project or any other, why should the city take a risk with something that already works, something that's already successful, something that hires hundreds of people, businesses in north beach? we have been told in passing, because we had at least six meetings with mr. funge and sometimes with ed reiskin and often with mr. chiu, that the golden gate bridge couldn't have been built if those who objected to it said no. but if you look at that history of the golden gate bridge, there was nothing there. there was nothing to destroy. there was no risk to take with employees and businesses and residents. so, why should the city as a matter of policy risk those things we have when we know that there's a reasonable option already approved by this
1:59 pm
board to leave the tbms in the ground, to not destroy those businesses, to not disturb the residents, to not make it impossible to use the playground on the park, to not take any risk whatsoever, and allow and encourage the subway which is a good thing to be built? in other words, there's two good things here, the subway which i'm in favor of, and the businesses in north beach, which all of us are still in favor of and the peace and quiet of the residents which they expect when they come home to find a clean apartment, clean house, to find quiet in the afternoon if they work at home and many people in north beach do. all these things are good things and they can exist. they can coexist in the city. and as the city becomes more urbanized, there is no reason that we even have to have these discussions had we had as a group, as a city, the foresight from the beginning to never ask the question. can we extract this equipment from the middle of a busy neighborhood? it should never have been questioned. it never should have been