determine our other services. the graffiti index and intensity index allow for specific locations within the neighborhood. we found we had significant results over the first year, in terms of the decrease 42.7 percent and while we have leveled off this year, we are confident that by analyzing the neighborhood data we will be able to make strong changes to our programs to be able to effectively decrease that number again. five neighborhoods accounted for 46 percent of the graffiti vandalism, compared to 60, 2011, 10 taggers responsible for 40 percent of the graffiti, 88 percent of the graffiti was small or extra small and 90 percent of it is text only. 71 percent was on private property. so that's basically the graffiti audit in a nutshell. but i always like to show this slide because nothing speaks better than a picture whether you are doing, how you are
5:01 pm
actually doing. and this is a tag that was created out of our logo. our logo is capital city clean up, wiping out graffiti. and the taggers are so angry with how we're doing, they've taken our logo and changed it to taking out creativity and they are stenciling it all over the city. i'm happy they know who we are and we are annoying them. this is just our sponsors, capital city clean up is fortunate to have a vast array of corporate sponsors, especially media partner. any questions? >> you said that 19 percent of the incidents were on post boxes. do you guys make them pay for that? >> make the --. >> canadian --. >> canada post clean it up?
5:02 pm
we have a special relationship with canada post. it was a funny way how we got that relationship. they were arguing they couldn't keep up with cleaning them, so bylaw officers started sending notifications to the owner of the canada post boxes, who happens to be the post master general in ottawa. they take them over a week period and canada post has a contractor go out. we have two kinds of mailboxes in canada. one are the drop boxes that the mail carriers use, those are the gray ones that are mostly getting tagged: other ones red letter boxes where you are dropping off your mail. those have been wrapped now and we found very little graffiti on the wrapped boxes. we are quite excited that canada post is going to be changes their policies with respect to the gray boxes and they are
5:03 pm
actually eliminating them. >> that's what we're seeing in arizona, utility companies, whether it's gas, cable, water, their boxes are being tagged. the utility companies making millions of dollars in profit don't want to pay for the clean up because they consider themselves the victim. >> we started serving tickets on them. >> interesting too as far as the boxes, the can canadian postal service has come up with a very busy deco design that is really, it looks very, very nice but if you put a tag on it you can't see the tag. that's been extremely effective. those boxes get tagged i would say 1 in 10 compared to the older ones that have a nice
5:04 pm
gray surface. so that's been a very effective program and edmonton serves notice on the postal service to clean those boxes up and the telephone companies and the utility companies and they clean them up. >> question in the back? >> hi, you indicated that while conducting one of your surveys you found 90 percent of the graffiti was text only. >> yes. >> approximately how many pieces of graffiti was that 90 percent? i mean was it 50 --. >> in the 2012 audit, the graffiti that was found over that two-week period, 1,116 pieces of graffiti that were found. so 90 percent of that was text only. >> is that the same trend the other two years as well? >> that's a nice number, thanks. i had a second question. earlier in your presentation you mentioned, you made a
5:05 pm
comment about free walls but you really didn't give as much detail. am i to believe you are not an advocate of free walls? >> i am not an advocate of free walls. i can honestly say that, although the city is looking at putting up one but we are looking at doing it as a pilot project with the arts council. what we've done, i wouldn't say we've set them up for failure but what we are doing is we're taking the same approach with the free wall as we do with all of our other projects. as you can see, i'm really interested in having a solid foundation for the programs that we offer and that's part of why we do the graffiti audit. so we have the arts council in agreement that when we coordinate putting up our free wall, we will be doing -- haven't talked to mark yet -- but we will be doing an audit of the location in concentric circles of the naibltd around where the graffiti is or where the free wall is supposed to be. that's one of the criteria.
5:06 pm
the second criteria is that in order to put up the free wall, a crime prevention through environmental design study has to be done of the area so if there are any factors that need to be changed to the physical structure of the area will have to be made and made by the arts council prior to any endorsement by the city putting it up. the other factor we're looking at is that on-going community consultation into the project is going to have to be a priority and the city community recreation department have to sign off on any public consultation. so we're looking at it being an audit process before, during, during the pilot and it's only going to be run as a two-year pilot project. so we're running all of these analysis will happen before the project's initiated as well and then so that we don't have any trouble with them claiming after the fact if it has to be taken down, it's
5:07 pm
art, you can't destroy it now, any area we determine to be a free wall is going to be put on panels that are movable so we won't have any issues with that and we're going to be looking at ensuring there are guidelines posted and looking at what type of monitoring of the area can be determined, as well as who is going to be responsible for spillover so we're going to try to make the arts council, they are going to have to be responsible for maintaining the property as well as an area outside the property as well in terms of clean up on civic structures. so we're taking that sort of scientific approach in terms of the analysis that's going to happen and we're running it as a project and we want to find out because you could have a community that's saying, fine and great, you are getting rid of the graffiti and in 6 months it's completely different. >> you are going to monitor
5:08 pm
the area for two years? >> yes, for two years, then we'll do post-audit. i'm hoping to be able to do two audits on this area as opposed to one year. how are we doing for time? any other questions? >> i might have missed this in the beginning, but i was curious, how do you guys get funded for this program. >> capital city clean up is a city of edmonton program. it started in 2005 as a litter reduction program and when our bylaw changed in 2008 our city council was very thoughtful in determining they needed to put their mouths were. basically they were going to require the property owners clean their graffiti, then they needed to put some effort into cleaning their own graffiti as well as supporting property owners in those efforts. >> so you have steady funding?
5:09 pm
>> yes, i have steady funding for the audit and the clean up program. >> how often do you share your data with other departments? >> always. mark and i just finished finalizing it last week, but we will be holding a press conference basically when i get back, so we will be sharing the information with all the city departments as well as the city in general and going through that. we're very open about the results. the only information that we don't publish is we don't publish the tagger names. if you were in our other presentation, we're very careful about not giving them air time. we don't want brute knowing he's the most prolific tagger in the city. that's not to my benefit, only to his. but we will say, for
5:10 pm
example, of the top 10 taggers one has been arrested. we will make that information known in a generic way during our press conferences. >> what type of material are you using for the panels. >> the panels? >> yeah. >> we haven't determined yet what we're going to use for the panels. it will really depend what structure we end up looking it on. we're looking at 4 locations for the free wall at this time. again, everything that i've seen shows that they don't work. we're kind of caught between a rock and a hard place on this in that the public art plan was approved by city council that includes the creation of free walls so we figure better to control it as opposed to fight it because we weren't going to win the fight. again, by taking this approach we think we'll have some really good empirical data at the end of it to say, look, this is how much graffiti in that neighborhood increased over the last two years. this is how much
5:11 pm
additional graffiti was on each of those streets. this is how angry the property owners are now compared to what they were then and these are the physical changes. we'll be looking at, again, safety and security issues as well as we go through that project. any other questions? >> i just have one more. i was curious if you guys take into account any other sort of statistics, say, like the neighborhood of which area is getting tagged, do you take into account the demographics in the sense of ethnicity or their economy of, you know, which type of --. >> we haven't to date, but we haven't really done that type of analysis. i think that's something we'd like to look at in the future in terms of getting down into the types of tagging. the graffiti i think it would be fair to say that the neighborhoods that have the
5:12 pm
highest incidents of graffiti tend to follow along where those business revitalization loans are or in areas of lower economic income, but we haven't done anything about ethnicity -- what you said. but we are actually looking at it. my director who just started with our branch last year is doing her master's in the area actually so that's something she wants to look at in the next few years. >> just wondering how long does it take to do an audit for a 4 by 4 block radius. >> it depends on how much graffiti they find, but the audit generally takes about 10 days. >> 20 to 25 neighborhoods, we can do about 2 1/2
5:13 pm
neighborhoods a day. >> say that again? >> two neighborhoods, 2 1/2 neighborhoods a day. you are literally 4 blocks by 4 blocks doesn't sound very big. you are doing every alleyway, behind every house, so if there's a lot of graffiti there it's pretty slow going. >> other questions? >> you have a lot of different components to your program. my question would be what are your performance measures? >> this is one of our performance measures, the results of the audit. we also do a survey on an annual basis of every property owner who does a, receives a notification to remove graffiti off of their property. so we do independent survey with them. we have about a 10 percent compliance rate on our survey, which is
5:14 pm
quite good statistically, given the number of surveys we send out, so we are able to analyze the response by the community. we also do an omnibus survey, we tag on to another existing survey to determine what the community response is how they feel edmonton is doing, we've seen really positive results to that in terms of people feeling that the amount of graffiti is going down within edmonton. i have individual program surveys that i do with all our programs. for example, the professional cleaning program, all of those people are contacted individually to determine how they felt the program worked. i'm a data junkie so any opportunity i have, we're really looking at that. we've done focus groups with the edmonton police service, the arts community, with school groups, various community service agencies to see what their responses to our programs, to see what other
5:15 pm
avenues we could pursue. so we have a lot of measures in place to evaluate each program area. >> as far as the city factor, do you track the square footage of graffiti removed and is that even beneficial? >> we have an estimate. we've been basing how much graffiti we've seen on thest estimates from the graffiti audit. we've take every operational department and again efts estimate it. that way we track all the graffiti in our individual program areas. i could tell you exactly how much graffiti was cleaned in a wipe out, in a professional cleaning program and then take the number of notifications that come in. this year we cleaned about 50,000 square feet of
5:16 pm
graffiti. >> last question, i'm not trying to hog everything. you already ask eds your question, i see you over there. now i forget what i was going to ask because i was so engrossed and trying to hurry up and squeeze it in. after the audit do you go out there and actually clean up the graffiti? >> yes. well, we don't go out and specifically clean it, but because of the bylaw officers the company, the auditor out there, they create notifications that go out to the property owners. because we do the audit at the end of the season when it's too cold to start cleaning, so notifications are sent out to them in the spring to remove their graffiti but what we do ensure is in the top 20 neighborhoods where we have the graffiti, we send out a poster, a blilts to those neighborhoods letting them know that they can contact us for assistance for clean up. we send an application and a notification to every property owner so they
5:17 pm
can access our program as well. it sounds bad that we're sending them a notification, but we ensure every time a property owner is contacted they have information on our programs so they can access them. >> okay, thank you. >> when you indicated it took 10 working days to do the audit, i'm just wondering how many people would be involved, one, three, 7 people? >> it includes mark. >> two auditors and one (inaudible). >> so about 4 people working 10 days. >> the bylaw officers, they start together so they get the same rhythm of identifying the tags then they alternate but the two crew from mark's company, himself and his assistant. >> 32 to 35. >> thank you. >> any other questions? if not, i'd like it thank you very
5:18 pm
5:21 pm
>> san francisco is home to some of the most innovative companies of the 21st century. this pioneering and forward looking spirit is alive in san francisco government as well. the new headquarters of the san francisco public utilities commission at a5 25 golden gate avenue is more than just a 13-story building and office ablation. instead, city leaders,
5:22 pm
departments and project managers join forces with local architectural firms ked to build one of the greatest office buildings in america. that's more than a building. that's a living system. ♪ ♪ when san francisco first bought this land in 1999, it was home to a state office building. >> this was an old eight-story brown building the state owned and the workers' comp people were in that building. it was an old dee correctvth it building for decades. when i was a member of the board of supervisors, all of us wondered why we hadn't done anything there and the mayor thought the same. >> if an earthquake happened, the building was uninhabitable. it sat there vacant for quite a while. the city decided to buy the building in 1999 for $2. we worked and looked at ways
5:23 pm
that we can utilize the building for an office building. to build an icon i can building that will house a lot of city departments. >> the san francisco public utilities commission has an important job. we provide clean, pristine public drinking water to 2.6 million people in the san francisco bay area from the hetch hetchy regional water system. with also generate clean renewable energy for city services like public buses, hospitals, schools, and much more. and finally, we collect and treat all the city's wastewater and stormwater making it safe enough to discharge into the san francisco bay and pacific ocean. >> in 2006 the puc was planning a record number of projects. >> the public utilities commission is a very infrastructure-rich organization. we're out there rebuilding the water system. we've budget working on power generation in the country. we've been doing sewer for the city. we're looking at a brand-new rebuild of all watt systems in san francisco and we haven't had a home that's been other than mental.
5:24 pm
>> they staff over 900 people. the puc is in two office locations. >> you know, this is such a great place for a building. if the puc owned that building and we could make that the icon i can sustainable building puc represents, wouldn't be a dramatic idea? >> so, one of the major decisions we made was we wanted to make a statement with this building. we wanted this building to be a lead platinum building which is very few buildings in san francisco that achieved this mark. >> leadership and energy environmental design, it takes a look at the way we think about the places where we live and work. i like to think of it as designed for human and environmental health. lead addresses five categories that enhances environment. indoor air quality, energy, water, materials and resources, and sustainable sites are the
5:25 pm
five categories for the lead. you can go for several gold or platinum certifications. >> the city wanted to be silver lead status. . maybe gold was a stretch. and people said, if we're going to be a sustainable organization that the pucs this has got to be the top of the line. it's got to be a lead platinum building. what does that mean to us? we run water, power, and sewer. so, those are some of the biggest things involved in lead platinum. ♪ ♪ >> by late 2008 the project, as we got the contractor on board and we were able to start pricing it, we're a multi-, multi-, multi-million dollar over budget. >> the story a lot of people don't know after we got select today do this project, the first price we came in with was $180 million. and the city said, you know, this is a great building, but we just don't want to spend that much money.
5:26 pm
so, the project was on the verge of being canceled. >> if you're looking at why this building came to be, in many ways it also included mayor gavin newsome, particularly, who really had an affection for this building. he saw the design. he saw the potential. he wanted to make sure that that building got built. and he said, do what you need to do, but please, if you can make that building work, we need to have that building in civic center. >> i happened to be at a green conference santa clara. he said you shouldn't cancel that project. can you work with us? michael cohen phoned me up the next day. can we cut $40 million out of this project? it was one person more responsible than any others, it's tony irons, was the architect that was responsible for the revitalization of city hall who came to my office and said, we cannot abandon this. we can't walk away from this project. we have an opportunity to really take a lot of our values and principles, particularly raising the bar as we did as a city on our green building
5:27 pm
standards, mandating the most aggressive green building standards for private construction anywhere in the united states. and showcasing them in this new building. >> the city for the sfpuc, it was critical that the building stay as a lead building. the easiest thing to do to cut out millions of dollars, let's just go from lead platinum to lead gold. but that wasn't the objective. this needed to be the best example of energy conservation of any office building in the united states. >> we became involved in the san francisco public utilities headquarter project during the time when the project was at a stand still for a number of reasons, largely due to budget issues. and at the time we were asked to consider an alternative design using concrete rather than the scheme that was potentially planned for previous to that, which was a steel frame structure that used hydraulic dampers to control seismic motion. >> so, i met with my team.
5:28 pm
we worked hard. we came up with a great idea. let's take out the heavy steel structure, let's put in an innovative vertical post tension concrete structure, great idea. we did that. a lot of other things. and we came up with a price of 140 million. so, we achieved that goal. and, so, when we first started looking at the building, it was going to cost a lot of money. because of the way it was being built, we could only get 12 floors. we wanted more space for our employees. we ended up going and saying, okay, if we do a concrete building instead, which was web core's idea, we can get 13 floors, not 12 floors. the concrete doesn't require much space between the floors as a steel building does. and it could be cheaper. yes, more space, less money, great idea. ♪ ♪ >> we know that right now there are things happening in power, with sewer, with water that are not always proven technologies, but they're things that are
5:29 pm
enough proven you should take a bit of a risk and you should show others it can be done. >> we're showing the world, suddenly had wind turbines which they didn't have before. so, our team realizing that time would change, and realizing where the opportunities were today, we said, you know what, we started out as really something to control wind as an asset, when you combine today's technology becomes something entirely different. >> wind turbines in an urban environment is a relatively new concept. there are a few buildings in other major cities where they have installed wind turbines on the roof. and wind turbines in buildings are effective. >> the discussion was do we do that or not? and the answer was, of course. if they're not perfect yet, they're building a building that will last 100 years. in 100 years someone is going to perfect wind efficient turbines.
5:30 pm
if these aren't right, we'll replace them. we have time to do that. >> the building that's two renewable energy generations. wind turbines located on the north facade. two different levels of photo volume takes. >> we have over 600 solar panels and three platforms on the building, and four integrated wind turbines. the wind turbines and the solar panels produce 7% of the building's energy. and we're reducing the use of energy here by 32% in the office building. >> the entire building is controlled by a complex computer system which monitors and adjusts air, heating and lights as well as indoor shades. >> the building is going to be a smart building. it's going to have all integrated features. so, it has a monitor on the roof that knows where the sun is. as it gets warmer or colder, it heats and cools the building.