>> what we have this we need to have, if you will, a cushion for unexpected events, including but not limited to what we call catastrophic events such as earthquakes and fires and whatever because of those. that needs to cover the payroll for us, and because, probably, we're not going to have during the recovery, the initial time, is buried levels when you get into emergency recovery, but in the initial period of time, we will not be having people coming in submitted projects to us. probably in the recovery time, we will, but in the initial, so we have to be able to cover the payroll for that initial time. in a catastrophic event of getting any -- getting the six-
11:04 pm
something magnitude -- what is it called? anyway, magnitude 6 earthquake or something to that effect, there is some sort of measure -- richter scale. great. if we were into that kind of situation, having, you know, the 553 we ended last year would fund five days. we would have to somehow or other obtain funding for our people from another source. so the controller's office looks to us to be able to cover our payroll to continue during that time, so when we end the year and add more, based on this
11:05 pm
plan, we would end at $4.3 million. that still is only 29.1 pace -- paid days. it is the payroll in little over a month and a half. that is not enough. that is the point i'm trying to make, that we need to be prepared for an unexpected type of event. >> our customers are not bringing it in right now. do you have any suggestions on how we might get that fund up? >> just so you know, we are increasing our work order with the port to do more internal plan checking for the port until the customer base does increase some, so we'll be doingmou work
11:06 pm
with the port, so that will bring in additional revenue that can be completed by current staff but can be put forward into the operating fund at the end of this fiscal year, the one we are currently in now, so we are projecting in the budget that this both to the board of supervisors, that we will be adding to the fund balance each year from now on, not taking from the fund balance, so that is the plan going forward, that we will not prepared a budget and present the commission with a budget that will be pulling from the operating fund. we will be balancing the budget with current funds against current funds and adding to the operating fund balance each year. >> the other thing is that to the extent that we are seeing more projects come through, because they can defer their impact fee payment, if that concept works, we may get larger
11:07 pm
projects because some developers have been waiting for something to be, you know, and the test to be able to bring in stuff, and we are seeing that right now. what would be a comfortable balance in that fund? a couple of million dollars? -- >> what would be a comfortable balance in that fund? a couple of million dollars? they could say let's take it out and put it in the general fund, which they have done in the past. >> that is something i keep hammering home to the various entities that could make decisions on our budget, that we need to maintain a fund balance, and it should not be used for anything other than repairs, but you hear anything from having six months of payroll, which is in the $16 million range, which, as we know, when we were in the $14 million range, of the money was siphoned
11:08 pm
off and used for other projects. it is really kind of -- i think the best thing we can do is continue to keep in mind and remind others that we are good stewards of our money and that we need to make sure that we are prepared and that we are self- sufficient. >> we also now have the support of the mayor's office, and there is a recovery initiative out there and recovery program that also directs departments to start looking toward what their department would need in the event of a catastrophic emergency, and controller's office is recommending certain fund balances, even in the general fund for a rainy day fund, and that is, from what i understand, at least six months of payroll. commissioner hechanova:, have a couple of questions.
11:09 pm
this much is the accounting semantics with the projected increase in revenue of $3.9 million is due to -- there is a line there that says $134,000 shortfall in revenues in the interest and investment base. could you explain that to me? >> yes, what happened is that when we prepare the budget, depending upon what you are seeing your fund balance is going to be, you calculate, you know, a best estimate on the interest rate and then prepare the budget, and in this case, our budget was $332,000, and we are bringing in $198,000 in interest and investments, so essentially, what we are doing is next fiscal year, we have ratcheted down on that. one of the things we looked down -- we look to cont what theroller's -- we looked at is
11:10 pm
wha ttht the controller's offics doing. we're projecting we're not going to get much more next year than we did this year. >> that is what you are trying to match up to moving targets? >> lots of moving targets. >> second question, and this might be more in the category of the incoming, is there anticipation of a the projected revenues that would come in to thedbi as it is this the to sea --the dbi as it is associated with the -- it has a moving target for the next three to five years. >> we have been in talks on this because the america's cup is proposing to take several of the port buildings, and we have a meeting this afternoon with the port to discuss work orders with the port and how we would address emergency for expedited
11:11 pm
planchettes' for this. the work would have to be completed very quickly, and how we would manage that. we were talking this afternoon on it, so, yes, there would be another increase revenue because the port would -- they have asked to have a plan check, some of the plans that would develop. -- that were developed. >> thank you. he had done a great job. >> i would like to bring the commission of to what happened last night at the budget meeting in case you have not read the papers. they did finally passed the budget. there is four pages of at backs, and we have not been able to actually be viewed as yet. we will review them later today, and we will send the commission a copy of all the figures that
11:12 pm
we get, but from what we understand, our budget was passed. >> thank you. >> is there any public comment? seeing the and,3 itemb is update on proposed legislation -- seeing none, item 3b is of the on proposed legislation. >> after we lost our monitoring fee legislation last august, it has finally been passed and will become effective august 16 of this year, so that means we will be able to collect in for some of these -- enforcement fees at a reasonable time. we will be collecting the not five or six years after the fact, so that as part of this legislation that will become effective august 16. we also, per the suggestion of the mayor, i did send a memo to the mayor on july 9 explaining
11:13 pm
why we are requesting a june 2011 trotter amendment to change the name of the department to the apartment building safety, and i will send a copy to all the commissioners. one of the main reasons is we put in the same position in seven cities throughout the nation, chicago and new york, all have some kind of variation on the name apartment building safety -- department building and safety, etc. and so forth. that is the more modern name rather than the department of inspection, which is more interested now or more regulatory, so we want to be the helpful department, rather than the department of just straight code enforcement. so we are doing that. we have new legislation being referred to thecac -- referred to the cac from other
11:14 pm
departments. there are some modifications to the gray water ordinances, and it is all to other departments, so they will be referred to the cac for review and referred for action. that is all i have. we will talk about each specific ordinance as it comes back further on in the agenda. >> also, yesterday, the board approved a bond to four. this is a real effort of this commission and this department -- a bond to forward. hopefully, we will all work together to get it passed in november. >> the board of supervisors approved the charter amendment to the bond for the seismic grant program and for low-income
11:15 pm
housing and affordable housing and for some public buildings that need seismic retrofitting work on them, so this was a big advance it towards our soft story legislation and our mandatory stop story legislation. it was approximately $46 million, $47 million, in that range, so a very robust program that will move some of our recommendations forward, so thank you for -- thank everybody for working on that. >> how long do we get to pay it back? >> usually 20. some of it will be loans, and some of it with the grants -- some of it will be grants, from what i understand. >> any public comment? 3c is of data and permit tracking systems. >> we have all of the input back
11:16 pm
from planning on the new rfp we are putting out -- we have an update some planning. we have changes at our apartment once. we are in the process of merging them together, and we will be sending them to all the city departments prior to the issue in some of therfp. -- issuance of the rfp. this will be supplying all the licensing to what we already have on inflation and allowing other departments to come on after the initial implementation with planning. it is a different way of looking at the rfp, and it is more with dbi paying for the core system through the process that other departments will be using. >> is there a target timeline? >> we are trying to get the rfp out before the end of the year.
11:17 pm
>> public comments on this? seeing none. >> good morning, the commissioners. i just wanted to reiterate the importance of getting this system in place. i recognize that the first step was to put it on the agenda and get it tracked so we could monitor the system and watch it for continuous improvement, and i welcome that development and look forward to seeing it evolves and become an efficient system that might be a shining light for the rest of the nation for the people to be used
11:18 pm
by the people. thank you very much. >> and more public comments? seeing none. >> item 3d, updating activities on the administration of the department. >> yes, we are preparing and doing the final walk-through on our fourth floor remodeling project and getting ready to move our stop from 1650 over 21660, which will mean a reference department will be on the fourth floor of the entire records department. we have fire plan checksd andpw -- fire plan check and dpw fire planchette, and we will vacate 1650, and we have another tenet ready to move in, which means our rent will be reduced also, which will mean more income for our operating fund. we currently have budgeted at
11:19 pm
the rate of rent we are paying now, so that will be a reduction in iran. the other thing that is happening right now is we have implemented several changes, and i will be writing all of the operating procedures for the department, but to do that, first, i have to write theab -- the ab regarding how to write an office report, and i will bring that back to the commission so we can get it completed, so i can write the office t seizures. that will be coming to you probably in september -- the office procedures. that will be coming to you probably in september. >> public comment? see 9. >> item four, public comment. bic will take public comment on matters within its jurisdiction and not part of the agenda.
11:20 pm
commissioner murphy: you have three minutes. >> thank you. good morning, commissioners. i just wanted to mention one thing that is that we have had a lot of layoffs at dbi, throughout the city because of the economic situation. one thing i noticed and i was impressed by, really, was that nearly having retired a few weeks back, the director is working on the first floor hands-on. i think it is really great to see her down there, and i think everybody likes to see the director is not just sitting up on the sixth floor. they really want to be hands on on the first floor and dealing with the customers and staff. thank you. commissioner murphy: 90. next speaker please.
11:21 pm
>> commissioners, first of all, on the fifth floor, it is really working very well. it is a good system. but the one little thing that gives us trouble oftentimes, from an applicant's point of view is it was usually the wait time to pay, and you get the thing finally issued. it takes a lot of work. it is a good hour to an hour- and-a-half. we are sitting there on the fifth floor twiddling our thumbs, waiting to get someone to take our application. we are happy to pay the fee, but it takes an hour and a half, and it is a constant kind of irritation, so i just bring that to your attention to areas other than that, the fifth floor is wonderful. we can go from station to station a real quickly and get the information we need, even if we are filing for a permit that day or not. thank you very much. commissioner murphy: next speaker please.
11:22 pm
>> good morning, commissioners. i'm here to go over a complaint i have filed with the department of building inspection, back on april 19. the unit under construction just below my unit has been working without the proper permits. i have filed a complaint, and just today, i have heard that the inspector from my district is going out to speak to the owner. i have a few photos i would like to show you because the work is causing severe damage to my unit, and i have been pleading for assistance from department building inspection. i do not know if it is due to budget cuts and work furlough days that nothing has been
11:23 pm
addressed for three months, by -- anyhow, here is a copy of my complaint, and i have some before and after pictures of what it looks like, and you can see that permits are not exactly true. right here, you can see this is what the original structure look like on each wall of our building. this was the original entrance under construction of the unit at 1824 mean streak. this is one that they moved to the exterior wall, which started only major damage to my unit. i have given a packet to ann, too, for some of the commissioners. here's what the structure looks like now.
11:24 pm
here is more photos of what the unit is looking like now, which is quite a bit of an additional square footage. the damage is done to my unit are severe cracks in my granite counter top, severe cracks all throughout my unit. that is over my stove. walls, ceilings. on march 10, my tenants came home to a major home -- hump in my hardwood floor in the hallway that enters the kitchen. he is the level that shows how it has affected the floor. the contract came in and tried to fix it, and it is not actually what it should be. he has told me that he believes
11:25 pm
that at home was there prior, which there never was -- that a hump was there prior. due to the debris clogging our storm drain, there has been combustion up -- and how an -- yho -- anyhow. i was just hoping that the commission might be able to get thething achieved so that damages can stop to my unit, possibly a red flag the property. thank you. >> we will talk to stop and maybe get it on the agenda for the meeting. next speaker please. >> good morning, commissioners.
11:26 pm
i want to bless you and all your family. thank you again for the request that i have been given justice. i feel i am treated like a citizen, although many people in my community know me for my dedication to defend justice, not only at our city and county of san francisco that i love, but also that level when when i see is now societies decaying because of the idea that money is more important than people. after my public comment of last month on june 2010, i have been
11:27 pm
told that my case has no jurisdiction, so i would appreciate it very much if you could give me a written answer in detail of what you think i have no jurisdiction. i do want to tell you that i have been following the process for many years, and especially with the department of building inspection. i started at the department of building inspection in 2002, and there were alterations of what was a defective demolition -- a de facto demolition.
11:28 pm
wanted to convert the units into luxury units, destroying some of the units. he bought the building in 1994, and the remote on the unit went beautifully, and then he lived there for five months. since 1994, there were going to destroy it, from the very beginning. anyway, i have of the documents. he appealed the board of appeals, and he appealed the superior court, and then the judges made a decision in my favor that he could not touch affordable housing. it has to be preserved. so please, give me a chance, and
11:29 pm
thank you very much. >> can i just remind, back in may, i requested that we have a hearing basically reporting on our notification requirements when an adverse change comes forward. i think it would be helpful to discuss this because it could have maybe remedied this issue in the beginning. if we could just put that on the agenda for the next meeting may be, and let's talk about the process and maybe get a determination. if we could change the notification process, or if that has to go through the board of supervisors on an address change. >> we have added a report at this notification, as i stated, notifying the tennis -- we have added the breadboard -- we have added the rent board at this
11:30 pm
notification, as i stated, on notifying the tenant. >> i'm very glad to hear that the city budget questions have been resolved, that a lot of the and banks have happened. and many of them, of course, address questions of senior housing. -- many of the ad backs have been happeneing. the issue of senior housing is going to involve many departments. the apartment building inspection, probably not going to be a major one, but there are certain things that you can do, and i think one of them is to try to remedy the situation of jose morales.
11:31 pm
it is just the tip of the icebergs, but it is a festering tip, and it should be resolved. thank you. commissioner murphy: thank you. next speaker. i see none. >> item 5, discussion and possible action regarding and what it is amending the san francisco building code by adding section 105a.3.10 to require that an agenda and packet of materials for each matter to be decided by the access of appeals commission shall be sent to the mayor's office of disability at the same time and in the same manner as they are sent to the commission member. >> i do not see anyone here from the supervisor's office, so i will summarize what had been at thecac -- at tehe cac meeting.
11:32 pm
it was determined by the code advisory commission that we should amend the proposal to only include those items which the mayor's office on disability has input into, such as publicly funded buildings or any other buildings that they would have control over. otherwise, the plan check duty for disability access remain within the department of building inspection. so we decided that it would be appropriate to send the packages to the mayor's office on disabilities, that they do have some control or plan check on, and that was the recommendation in a letter that was sent to the commission. walker -- commissioner walker: so rather than just send everything? >> right, it is very expensive >> right, it is very expensive to reproduce the