10:30 am
stations that necessary to get water off of the island. after 16 inches of sea level rise, we will need to adjust. that is what the project pays for. president vietor: and the project will pay for it? >> correct. >> there will be a shared cost. there are certain things we are paying for. we can talk about that. we would pay for the waste water treatment plant. but the infrastructure to deliver the water there is a mixed cost. we can go through details. >> pc level question -- he would not be paying for those -- the ec level question, he would not be paying for those. vice president moran: we would
10:31 am
be talking about the cost of the waste water treatment plant? >> for certain items on there. there will be a number of rate increases over the next 10 years to pay for residents in the southeast, for example, that provides no benefit to treasure island. if treasure island was paying these benefits for the mainland, there are no benefits. in some ways, if you were not saving it ratepayer money, treasure island would be subsidizing the mainland. vice president moran: it is not fair for treasure island to be bearing the cost, right? >> if you at 8000 units, plus the hotels -- if the waste water
10:32 am
treatment plant comes in at the numbers we are looking at, it is about the same cost for those people as the people living in san francisco bay. and we can walk through those numbers with here. vice president moran: what hotels are going to be there? having made a decision yet? >> i do not think so. vice president moran: there would be two hotels. one with 50 rooms. another with 450 grams. >> we've not entered any agreements with developers. vice presidentmoran: in that situation, does that ratepayer pay for part of the incentive as well? >> everyone on the island should be paying for the infrastructure on the island. >> sorry, i was going to save -- yes. the waste water capacity charges would apply to both residential and commercial uses on treasure
10:33 am
island, the same as they would citywide. >> ok. for now. [laughter] >> moving into the utility infrastructure, let me look at possible water demands. the project will reduce demand for a new development, starting with 2.29 million gallons per day. we've reduced that to just under 2 million gallons per day by eliminating water irrigation. i will talk about the recycled water plants in a minute. we have used water conservation methods and utility fixture units and things.
10:34 am
that has reduced 3.6 million gallons a day. we dropped it by another 2.2 million gallons a day for all non possible water uses, a toilet flushing -- non-potable water uses, toilet flushing, and so on. president vietor: i sound like a broken record. what about collection facilities for each unit? do they collect the water and treated so we can be even more aggressive? >> we are being as aggressive as we can on water use based on recycled water. we are using everything we can that is not potable. this is something to be explored in the commercial area with commercial buildings. we are not promoting the collection of rain water.
10:35 am
president vietor: wouldn't that be to our advantage? the -- minimally, probably. >> it cannot change the size of the waste water treatment. -- it can change the size of the waste water treatment. >> that would not change the waste water treatment use, because we of separate systems. the only thing it would change minimally is the amount of recycled water he would produce when you have the water available. but that would be maybe a third of the year, at most. in the areas where you have combined systems, he would have the sewers system any issue you have with the -- you would have the sewer system and any issue you have with the treatment plant. vice president moran: has anyone
10:36 am
done an economic eir? i know that the decisions of probably been made, but i think it is important for the public to know what benefit this brings to the city of san francisco. >> in terms of the overall economic structure of the project, it is fully self- sufficient. the project is paid for by the revenues generated for redevelopment of the -- vice president moran: i understand. what benefits come to the city and county of san francisco residents? >> we've done a study. vice president moran: i would love to see it. commissioner torres: that is a narrow benefit. what about the macro benefit to the city and county of sentences go? is it possible to get a copy of that report? >> sure. there are a number of documents we can provide. just to give you a snapshot --
10:37 am
2000 construction jobs and permanent jobs. this is an 18-year development. over the life of the project -- 40,000 construction jobs are going to be created. commissioner torres: if i were looking for a home on treasure island, what year would be able to stop -- to start shopping? >> depending on when we first put bubbles in the ground, it is a two-year construction phase before new development would happen, and 12 to 18 months after that. commissioner torres: so opening that new townhome would be 2015? >> 2015. >> i will be off this commission before that. >> again, looking at potable
10:38 am
water for the island's -- we will be replacing all the utilities over time and building up the islands. so, everything within the new development area, we will be able to continue relying on existing systems and the areas that are operating until we get into those phases of work. domestic water is brought over from san francisco over the bay bridge. the capacity in that pipeline is sufficient to serve the average daily demand. there is an emergency supply coming from oaklands, over that side of the bay bridge. that supply can also handle all of the average daily demands. because of concerns about the location of the island, we are also drawing 4 million gallons of storage on an yvi for an emergency storage solutions.
10:39 am
vice president moran: those infrastructure pipelines are intact now? >> that is correct. vice president moran: will they be impacted at all by the new bridge? >> the new bridge has water lines in it. vice president moran: that was not part of this cost? >> that is correct. >> i believe there needs to be in new station. >> yes, it needs to be replaced. commissioner torres: where is that in the budget? >> it is not in the budget right now? commissioner torres: i am sorry. the state budget? >> no. >> the proposal -- the puc one. that is what we can bring back.
10:40 am
what the balance is. >> for wastewater, again, this system will be replaced over time as we build up the island. there is a waste water treatment out there today that is operating. that would be replaced. the new system is going to be billed to the city standards. more efficient. we are going to reduce the number of bomb stations on the island today. president vietor: so, waste water will not be replaced runaway, did you said? >> existing waste water plants being operated by the puc is on behalf of the navy. president vietor: that will stay until -- >> the plan is it will be replaced by the p u state. president vietor: at some point
10:41 am
in the development process that the next three, five, 10 years? >> when will the rate being be sufficient to cover those kinds of costs? to make it worth your while and make sure you have other ratepayers not being satisfied? that is the question. it really does have to wait until the bill doubt occurs sufficiently to have it covered. -- build out occurs sufficiently to have it covered. president vietor: when is the projection for that build out? >> it really becomes of to the puc when it is ready to be changed -- up to the puc when it is ready to be changed out. president vietor: when with the
10:42 am
project be built? >> is a 25-year -- it is a 25- year project. >> 2025. something like that. it is unclear whether it will need all new construction. president vietor: what about the backflow issues? i have climate change, mind. -- on my mind. would we need to do some adaptive measures as it relates to sea level rise? >> the existing plant that is there today operates as a pump station for your outflow into the bay. that is going to provide protection for the sea water coming back. it is probably at an elevation of about 11.
10:43 am
>> this is a separate waste water and storm water system. we talk about the ducks -- ducts. it drains to a low point. it comes to the plant. we can talk about that. president vietor: and 11 inches, approximately, today? >> 11 inches. so, as michael pointed out, you already have that separation. the high tide back water is coming back in. we are going to replace that over time. president vietor: thank you. >> recycled water? >> to recycled water system -- the recycled water system. we will be building a new recycled water system for the
10:44 am
island. it will be constructed by the waste water treatment plant. we will not be in stalling on yvi, because there is not that much demand on yvi as compared to the rest of the development. tri-utility systems. the whole system will be replaced over time. the navy system has to be maintained by the puc from oakland. then, it is picked up by the navy through the port of oakland property of the island. that will be transferred, just like the island, once the navy transfer occurs, and then to the puc and other power providers.
10:45 am
>> ok. president vietor are we going to have a decision at some point as to whether to take this on? when would that come before us? >> the timing of that -- >> prior to approval, we would pause for the feasibility study to be done, code 99. prior to the formal approval. next month. >> it is our working assumption that you would want us to propose to do that. president vietor: i think also, you know, with cca, it is an interesting opportunity being on model clinton climate project.
10:46 am
so, would that be addressed in the disability -- feasibility study? >> yes. president vietor: it would? that would be great if it could be. >> yes. president vietor: some kind of distributed generation of around grenoble's, the local build up, that would be great. if we could make an informed decision. if that makes sense. thank you. >> coming back to the storm drain. the whole system will be replaced. the gravity system, the initial construction. we are working through some of the details with staff now on those systems, and the intent
10:47 am
is we will of all on-site treatment before we go into the bay. chris is here to run through the treatment strategy. >> good afternoon, commissioners. i would like to start by noting that puc is the city agency responsible for meeting the state regulatory requirements for water quality control in the bay, and this project is unique in the opportunity we have to really integrate the way we deal with storm water management and integrate it with both infrastructure planning and the open face and open design. we have been able to do that throughout the process. there are a couple of key points. the idea that the system be flexible and allow for potential changes under state regulations, said the island would be able to accommodate that. second, the planning work we
10:48 am
have done is consistent with the puc storm water design guidelines, that it takes a multi-benefit approach to storm water treatment, which means there is a high level of treatments and ecological benefits that are combined throughout the island. third, that esthetics and community greening are part of the storm water treatment program. with that, i am going to turn to yvi -- yerba buena island first. it is a very different situation between the two islands, would yerba buena being at very steep. there are four different distinct watersheds a different phases of the -- at different phases of the program there. next, on treasure island proper,
10:49 am
we have analyzed conclusions of concern for each difference land use and adapted our treatment to each of those different areas. and then we had divided the island further into different watersheds, based on the phasing, the soil and other issues, we can link the treatment with the infrastructure development. vice president moran: so your role is a consultant to the development? >> that is correct. vice president moran: where else have you applied for this advice? -- where else have you provided this advice? >> we have worked elsewhere in san francisco. we have helped several other large water treatment facilities within the bay area. vice president moran: right.
10:50 am
so your expertise is really the bay area then? >> right. the bay area. vice president moran: and you think we are ok now? >> in terms of the treatment measures? vice president moran: are we taking the appropriate steps here in san francisco to do with the issue? >> yes. i think the city has made major strides. vice president moran: what are the unique characteristics u.s. found as opposed to other projects to work on? >> i think it is the question of being able to integrate at a large scale the strategies we have. so, the puc has identified a number of treatment measures,
10:51 am
and these treatment measures are wide-rangingly selected. i will identify a few here. there are permeable pacing systems. there is a large wetland system that is proposed for the large part area in the northwest corner of the island and the north east. the idea is we can provide habitat creation and apology for visitors for bird watching and other things. there is rain gardens and flood service infiltration areas in more urban, developed areas. vice president moran: you know we have a problem in this city, between birds and dogs, especially in relation to the federal proposal. what would happen here with birds and dogs? >> that is a good question. i colleague who works in the field, and it is likely we would
10:52 am
develop in areas where the habitat is, something similar to what was done -- >> in 2015, i am an incredible dog lover. you are going to tell me where i can take my dog for walks, etc.? >> in a very limited way, yes. [laughter] vice president moran: -- commissioner torres: a limited way? >> the streets, typically, and ian an environment like this -- on all the streets, there are streets bio-filters that serve the first flush treatment measure. lastly, on a large park, we have
10:53 am
allocated space for a waste- water treatment program. we looked at it, studied it in the eir, should the puc decided to include that as part of the waste water treatment system. president vietor: thank you. i am excited and appreciate your efforts. particularly, the wetlands peace. we've been talking about doing some kind of pilot for demonstration or program, like public, treating our waste water. i think it will be a lost opportunity. i have been reading about climate change legislation. and i would include the clinton climate challenge, or what ever it is, to be able to factor that in and create a base line before it goes in and around what
10:54 am
wetlands may be able to sequester as far as becoming carbon positive. because i have been reading more and more about the possibility of wetlands. >> i believe the initial inventory we have done has looked the that. i do not know if we got down to that. wetlands for says the habitats on -- versus the habitats of yvi. president vietor: it may be interesting as an urban mitigation strategy for climate change in the city overall. >> one last slide. just to discuss briefly the next steps. next week, april 21, we will be before the title board and planning commission for the certification of the eir, as well as the general plan and zoning codes, the planning
10:55 am
amendment that would need to be done by the planning commission for the approval of the development agreement and other supporting documents and title approval of the development agreement and all the support and assistance to go along with that. all subject to the eir being certified. then it would be back before you on april 26 for the adoption of the ceqa findings, the mitigation and monitoring development plan, the approval of the ica, and by attachment, the infrastructure plan. in the final board of supervisors approval is anticipated for early june. with that, i would open it up to any discussion. president vietor: commissioner courtney? commissioner courtney: if it is not too much trouble, could you repeat the jobs data?
10:56 am
what classification would you consider them to be -- whether they are construction jobs or retail jobs or just general maintenance jobs? >> sure. the first component would be construction jobs through the buildup of the development program over 20 years, and that is anticipated to be 2000 annual jobs in construction trades, various trades, starting first with infrastructure, and in typical trades we would think of as building trades, we would think of as it relates to building development. i do not have specific answers on the full-time jobs or the permanent jobs, but they would be comprised of maintenance jobs for the parks and open space. they would be common area maintenance jobs for the hoa. retail component, the hotel jobs, that sort of job sector. we have also cleared up to 100,000 square feet of commercial office. that is not currently a
10:57 am
component of the program, but we have given ourselves the flexibility to attract a tenant that would find the site suitable. it is generally in the retail and service industries. commissioner moran: if you had to assign a number, the value of the project, a ball park. >> in terms of the total number of jobs created? i will say 40,000 to 45,000 jobs. construction, and the need permanent jobs at around 2000 or 3000. we can get your specific numbers as part of the fiscal analysis that was done. commissioner vietor: are there questions or comments? >> commissioners, we are still working with various folks. we have been working with a lot
10:58 am
of people with the mayor's office over the last several years. mike martin was the lead for it. he is now working on the america's cup. we have staff still discussing things as esoteric to most of us as the death of the pipe, compared to the waste water levels. so we can bring that back to you and ask if this is an appropriate briefing here cost, and appropriate cost for the connection fees and capacity charges and for the developers, so you get a sense of what that might be. >> do you have any further comments? >> this is going to seem very complex, but your comments and questions were very good, so we think we can distill it down, so when we do our presentation to you, hopefully we can answer some of your questions.
10:59 am
as the general manager stated, a lot of it comes down to what side of the legislature the costs actually come down on. that is the big decision you will need to make in two weeks. we will have that information for you in advance. >> is it too early to put together the dry utilities as well? i do not know what that means. i think it means the energy service, right? what it might mean for the puc to take on. >> we can actually run some quick and dirty analysis. we had so many customers, we charge them at an equivalent to a pg&e kind of rate. what it would take us to recover. whatever infrastructure we are putting in. we actually have some costs associated with all three of our enterprises, that you have in your existing budget that