tv [untitled] June 7, 2011 1:00am-1:30am PDT
1:00 am
processing the application. this has already happened with the cruise terminal in the early commission. that application is in process and would have its public hearing in october of this year with possible action on the amendment itself in the early 2012. the america's cup related amendment proposals have not done in the brief description of this form yet. we expect that that what happened in june. again, commission action in early 2012. we think that there is an intervening step, particularly for the cruise terminal [no audio] over the course of the fall. we need to consult more with bcdc and the stakeholders themselves. we are not sure that the
1:01 am
workshop setting is the right way to approach this, but we hope to use the time between now and over the course of the summer to build more consensus about the actual form of the final amendment. so, that is my presentation. i will open it up to the commission for an questions. >> thank you. is there any public comment on this item? commissioners? comments? questions? >> one question in terms of the floating docks. is there any reason it could not be located along pier 1 as opposed to horizontal leave bursas vertically? blacks are you talking about the area that should go between 14th and 22 m behalf?
1:02 am
that structure is pier 14, the public what way to the south of the ferry building the. my understanding is that that appear does not have enough strength to be able to support more than the breakwater function is conducting right now. that if you been tempted to hook up to it, docs or other facilities, for the morning of these super-vessels, that you would run into a problem. we have been looking at whether or not the boats themselves need to be that close to shore. the floating docks could be moved out over 100 feet from the shoreline, something that is being examined. >> that would then reduce the amount of dredging needed? >> it would reduce the amount of dredging needed. much of this is driven by
1:03 am
operational needs for the large spectator vessels. also, currents in the area. the currents are quite small outside the bright water structure. you would have to take good advantage of the protection that the break water provides. >> commissioner? >> other than peter 27, which we would have had to do because we are pursuing a cruise terminal, these others with the do seem to be related to the america's cup. if we are going to deliver on the promise, i assume we are talking about some fairly intense negotiations. >> that is one reason why we are proposing three separate amendment considerations and negotiations that might be
1:04 am
different for the different locations. certainly, we laid a lot of ground work with these interviews related to the amendment. the public has had less of a chance to live up to the proposals. and these are so temporary. through 2014 to remove any improvements that have been made. they really are different proposals. >> any other questions or comments? >> in terms of the feedback that has been given, you indicated bcdc was not enamored of some of these efforts. would that impact the timing of
1:05 am
moving forward on provisions for the america's cup? >> one thing that i will say is that everybody bcdc, and this is true of all of the regulatory agencies that we have brought issues to, everyone is engaged. a really great staff at all of the regulatory agencies. we have been able to meet on a regular basis. one thing that we went over in the staff report that i did not go over in my presentation was putting together an area for the working group. kelly is an environmental planner on loan from the puc and has organized that effort. everyone gets the sense that the america's cup is happening out a
1:06 am
press time schedule. working quickly to come up with alternate approaches where required. yes, there is a risk of the leg. i think that everyone understands the events are planned for what they are planned for. let's thank you. we really appreciate it. >> item 9b, request approval to execute agreement with the u.s. army corps of engineers for staffing costs associated with expect -- expedited regulatory review for the proposed terminal and the 34th america's cup for costs not to exceed $157,703. >> the army corps of engineers
1:07 am
one, they will be an agency that will support the work of other federal agencies through their process. the item i am here to present today, kelly actually prepared. she has been negotiating based on a template that was first trail blazed by the puc, entering into a memorandum of agreement to get dedicated staff who are there to address the permit issues that you have on a timely basis. physically the proposal is to provide staff and support. for the city to provide staffing support.
1:08 am
we estimate that about 80% of these costs are america's cup related. 20% are related to the cruise terminal. the other federal agencies that would be reimbursed through this effort include the know and national fisheries, who are doing an endangered species act consultation. in addition to pulling the mark, construction by peers will play a role in processing the national environmental protection act. we are requesting that the port
1:09 am
enter into this memorandum of agreement on behalf of the city. and that when the office of economic or workforce development gets appropriate authority, we either transfer the memorandum of agreement to wewd, or we transfer it to the air -- to their budget billing code. that is something that elaine has negotiated with cfo for owe d. off we are confident that we will not be paying these expenses on behalf of the america's cup. i think that i lost a couple of people in the process. kelly, whom i had mentioned before, is a superstar. we have a dream team for permitting on this project.
1:10 am
and they work through very complicated permit processes that will stretch through the rest of the year. on behalf of support staff, i would like to say how much we appreciate everything. are there any questions on this memorandum of agreement? >> thank you. >> second. >> is there any public comment on this item? pop all in favor? resolution 1135 has been approved. >> item 9c, request approval to execute memorandum of agreement with the association of bay area governments for staffing costs up to $260,340 associated with expedited regulatory review for the proposed pier 27 cruise
1:11 am
terminal and the 34th america's cup. >> this item is the state equivalent of the federal and l.a. that we just discussed. the two state agencies or to play in the cruise terminal. they have jurisdiction over 401 certification. also looking at ways to discharge. and then there is the bay conservation development committee. the commission had previously approved a memorandum of agreement. the cdc will have to permit all of the floating docks and construction activities happening up and down the
1:12 am
waterfront. the workload for both agencies is quite high. in this case we have a slightly different approach other than factoring in with both of those agencies. payback would be the employer for this that that would be processing permits on behalf of those agencies we are estimating a similar cost split. the arrangement would again be the same regarding transferring an l.a. to them -- transferring mla to them. in the dream team, our environmental planner on loan from the planning department. he is helping out a lot with
1:13 am
kermit issues. if there are any questions on this, but would be happy to answer them. let's second. >> is there any public comment on this item? those in favor? resolution 1136 has been approved. item 9d, informational presentation on the draft people plan for the 34th america's cup event. >> hello. this is michael martin. he is the proud owner of all of the city's obligations under the america's cup. the hosting the new agreement,. you cannot tell by looking at him, but for a time he was a securities bond lawyer.
1:14 am
so, we are recycling at our very best, just moving around. he actually joined the office of economic and workforce development, where he was most recently a project manager and most well known to commissioner foley. he has agreed to be here today so that you can meet him, engage with him, and most importantly hear about one of the city's obligations, which is to create and manage a people plan. as you know, there was a preliminary people plan as of march 31. you will recall that in the final version it is required to roll into part of the e i are by the end of september.
1:15 am
>> that hit everything i had planned for my introduction. i am the america's cup project director. i really appreciated the directors reference to the owner of the city's obligations, because that is how i feel. in many ways i am coordinating across a wide range of staff. not only on the things required of the agreement, but also the promise of white people wanted to bring this here in the first place. economic, maritime history, all of those things. it has been an exciting and challenging ride so far. this place is already a major center of activity and we are blessed to have so many good people working on it already. hopefully i will be able to be
1:16 am
helpful is the strategy for moving tens of hundreds of thousands of people to be very scenic but also not easily and often constructed areas along the waterfront where we can watch these spectacular events. as mentioned, the people plan is called for and the initial draft was issued for feedback at the end of march. as accepted by the city of kent authorities and we cannot say that we are actually doing this until we have the proper view, but the hope is to have a clear strategy with the help of the
1:17 am
feedback from the public and it turned out to be very fortuitous. what we heard, especially in the early public scope meetings in the amendment, that this was the people, these visitors, these residents, wanted to know how the event would impact their lives if they were not interested. they just live in san francisco. since march we have been to 24 public meetings. cuff i believe that we have six more scheduled through the middle of june. we are receiving comments on line, as well as from anyone that we can talk to, to get as much of the good thinking out there as we can. one last piece on the schedule.
1:18 am
we just released from the office of economic workforce development web site, not a catchy name, but that is what it is, a status report on the people plan. we are inviting comments from the public through the end of the month. if you do not see your comments here, please get it in. we will have another project status update in june along with transit project providers that will help us to strategizing on a bay area level. tying it all together so that people can see what is coming in the september timeframe. a quick overview that i am sure you have seen that your meetings before, in terms of the schedules of the meetings that are coming, the first is due next year in the summer of 2012. we have mid-august and mid-
1:19 am
september. the window was really july through september. we are working to figure out the specific dates. those are one of events. nine days of sailing each. sort of their own format. the champion of those sorts of events are not actually related to 2013. once we get to 2013, there is the cup challenge series between july and the beginning of september that will, perhaps, be interspersed with the defender series. otherwise it will simply be the challenges facing off for a chance to go against the offender in the america's cup final. moving to the people plan itself, the way it was structured in march, it jumped from an initial decision to work
1:20 am
from the -- from these guiding principles. resource efficiency was the primary one. it had to do with looking at the building blocks that we had in figuring out the best way to deploy those instead of building whole new system is out whole cloth. here we have had the benefit of having the minister of transport -- municipal transportation agency being at the forefront in terms of what they have control of and what they can help us to plan across many platforms in ways that many cities cannot. he is not here right now, but i would like to extol the virtues of peter albert. he has done a fantastic job of getting us to a place where we have some fantastic strategies. environmental sustainability, it goes without saying that we want
1:21 am
to have this great event on the bay that respects the beautiful environment that we brought it to. including the very sensitive areas along the bay that people are going to want to watch from. obviously, we feel the transportation strategies have a park could play. getting people out of their private automobiles and into more environmentally friendly modes of transit. whether it is pedestrians or other forms of high-volume. thinking about that in a top down way allowed us to build strategies that support the environmental goals of the event. the third guiding principle can be looked out from a few different angles. this is really the first time that the america's cup has been visible from shore in a very urban environment. in some ways we have no
1:22 am
projections of what this event but brought in terms of people. we need to understand that if there is a peak day on late weekend, we are able to bring the resources necessary. but that we are also able to tone it down on a day without a visitor interest. build a plant that allows us to write the sides as we learn more. learning more as the other angle. 2012 events will have a different visitor profile. across a lot of different fields, the 2012 events are really a test brown to say -- where are the strategies that with it work? where are the ones that do not work pelops in 2013 with a more adaptable governor, those events will come to san francisco more.
1:23 am
as a product -- positive legacy across the planning peace is it will be a missed a maternity if it does not also bring legacy benefits to san francisco. transportation, and legacy benefits could be brick and mortar specific, trendlines, facilities that help us, but it is also things like information strategies. whether it is advanced information getting people to choose things other than cars, real time information about traffic. it allowed people to make strategic decisions on an individual basis that will support our overall goal of not having a congested area. hopefully, having the free movement of people to see all the benefits we are bringing to the waterfront, as well at no. waterfront. another approach in terms of
1:24 am
positive legacy, operational strategies. thing that mta can do to move people around the waterfront better and create benefits for the people that stay here beyond just the events themselves. this slide is a little dense, an overview of the people plan itself. the one thing i want to pull out of it, towards the end of the second line. it says "the people." it is important that we recognize it is not just the people related to the events, teams, spectators. as i mentioned earlier, it is the people of san francisco that want to get near to where the events are, try to do that in an efficient way, or they are just going from their home to where they want to shop, and they do not want to be complete impacted by all of these resources focused on that day. that is something that we are
1:25 am
taking to heart in our service plan, as well as conversations with regional transit providers. we want to do this in a way that allows someone to take an effective trip to the events that enhances their experience, but also, continue the bay area and its needs for the people, continue the economy, bring the resident experience, without having the negative experience of having all of the people come to this unique event. here is a slide that shows the race area. this is obvious the well- publicized. generally spanning between treasure island and a little bit away under the golden gate bridge. obviously, creating a lot of u corridors. a quick summary of the event
1:26 am
locations proposed for 2012. their focus is primarily along the northern waterfront as well as locations in the north bay, alcatraz. this is also focused on the fact that a lot of the port facilities, should they be approved, would still be under construction. aside from pier i-80, which would be a team activity, it is really on the spectator areas that would not require those construction time mind. moving on to 2013 on this slide, saying spectator locations as well as pork locations that have now sprung forward, constructive hopefully by 2013. mr. bentsen discussed a number of these in conjunction with prior items. the team based at 30 and 32, being the centerpiece. with that being our canvas, we
1:27 am
focused primarily on how do we rightsize our strategy to move people to these locations? part of the basis of all this focus on using existing lines that people are familiar with, but figuring out ways to augment service, established limited stop service, other methods to move people quickly along these corridors. so that while they are on the corridor, they are enjoying better service, but we are also allowing more capacity to get to the waterfront, as well as northern new locations and park lands. the primary backbone for this service are the three bus lines you see here. the 47, going along van ness, a limited stop service. that would incorporate a terminus event launched site that would allow connections to
1:28 am
bart, parking at civic center garage, and other locations to get people focused on staying out of the downtown congestion, which may occur due to so many interesting attractions. the other two bus lines are the 30 and 30x. 30 would include potential limited stop service to allow it to bolster service through what is whatgenerally a slow ride through chinatown. we spoke to poke through the chinatown development center to see how we could make this service work better. not only as a benefit to the residence, but this will be running from the caltrain area through union square, up to the northern waterfront, and even having a quarter leg near the f line at jones street.
1:29 am
that would be a key backbone for the effort. 30x starts further downtown and gives a more speedy route out to the western end of the spectator areas. one other item to show, the e line. that has drawn a lot of attention from folks in the area. that is one idea that lends itself well to how we want to move people to and from this event. by connecting the caltrain terminal, this building at the ferry terminal, and at the fisherman's wharf. we hope that people enjoy themselves through the america's cup village, wharf area. we are looking at ways to bring that online to ensure that it is effectively interspersed with the f line.