Skip to main content

tv   [untitled]    July 29, 2011 3:30pm-4:00pm PDT

3:30 pm
receive a penny from local power. there is no relationship like that. to get to some specifics about the work itself, just to put it in context the first part that june referred to that we need the sfpuc is largely a task of gathering information, voluminous information about pg & e and sfpuc and its rate pairs, etc., so that it's a huge amount of information that has to be crunched and then more work needs to be done to scope out the entire -- they were talking about scoping out the entire city for a full buildout of renewable and hundreds of efficiencies in hundreds of mega watts. in sonoma county, just that beginning part of getting rate
3:31 pm
pair information and analyzing that data that component all in itself cost $300,000. and sonoma has a similar size rate base as san francisco does. so i know you got sticker shock on this but the reality is this is what it takes to have a plan on a buildout an entire city. it's vital that you move forward this today so we can send the message to the is sfpuc so they can do their bigger part and get this done. and i've got be clear, advocates are not going to support a c.c.a. program that does not fully flush out the buildout like this. it will not be viable economically. it will have problems and it will not give us the green jobs and the ability to have a strong impact on the climate crisis that we must have.
3:32 pm
we absolutely must have a big program moving forward na's actually building and installing renewable efficiency to the tune of hundreds of mega watts or this is not worth the paper that it's written on. so commissioners need to understand that it's vital that we get this work done and that amount of money is what it costs. as council miller said to you, actually from the meetings we've had local power said, well, it would actually cost more but since there is 398 left, that's what we have to go with and that's the only reason that's the number. as to any relationships that might exist -- >> thank you. >> between activists an others i would like to see any proof that any commission would like to put forward so that we can have a real conversation about it. >> next speaker. >> commissioner josh r., brightline defense. and i would actually encourage
3:33 pm
the commission to go forward with staff recommendation. and i'll tell you why. just a couple of new items from a couple of speakers. the puc has expressly extended the contract to do this buildout because one of the things that hasn't been stated that we've had seven meetings that resulted in near armageddon with the puc and community advocates about the fact that the program was you moving forward without a plan without a local buildout. without local buildout, the program does not work. i say that because we've gone out over the past few months to test that proposition and we find it to be true. so i don't know -- i don't even know what the tasks are other than if the tassbs are no move the conversation and move the plan to do a local build wouth this program then that's what we need to do. the scope that nancy mentioned,
3:34 pm
you know, we've had seven meetings with the contracter, the sfpuc staff maybe 14 hours of dialogue that led to the scope that's before you. yes, the p.u.c. did put out its own scope believed what it is the local buildout. but when we tested it, it was a failure. it went nowhere. and so the scope that's been developed now and i suppose there could be more conversation in the next couple of weeks is calculated to work. when we took that as a community group and said this is the plan to build if your neighborhood to deliver tangible results after we begin with this kind of first flavor of this program, that gets people excited. so if you don't have this buildout, if you don't have the plan if you don't start doing the work and don't get it done, the plan is not calculated to succeed because if you don't
3:35 pm
have a local buildout there's no plan. this is what we're most excited about and we've been here on these two parallel tracks. we want to do this type of work, to have the local 3wil8dout. i'm sure you'll have these conversations with your local vendor. other than having these conversations with barbara heal, well, the first one he blessed them with his hand. that's how this scope is formed. it's feedback. it's exciting. so we've got to have a plan for local buildout. it will's move forward to do that. and i think that's the decision for you. supervisor campos: thank you. is there any other member of the public? >> good afternoon, commissioners jeremiah dean, sierra club. i don't have much more to add to what my fellow advocates have said today. they pretty much laid out the
3:36 pm
plan why it's beneficial to the community, to california, to sacramento, to san francisco. everyone needs to know that clean power is the way to go. we need to get to renewables. i would love to see san francisco get to 100% as soon as possible. and not 100% green to just 70,000 customers. i would like to see everybody in san francisco have the ability to have 100% clean renewable energy. and the way to get to that zpwole through this scope of work. we need that local buildout. it's going bring jobs. it's going to bring an amazing boom to green technology. we're going to see that if we get this scope to move forward. sierra club, san francisco would like to see the resolution today from ms. miller move forward. thank you. supervisor campos: thank you. is there any other member of the public that would like to speak? seeing nothing, public comment
3:37 pm
is closed? commissioner america rimmy? -- merkarimi. >> i'm supportive that we do this on an increment staff recommendation. based on the conversations that took place before public comment, you know, i think it's important as what we're buying here. i've become accustomed to how they write and what they propose and what the product is based on what's been contracted. and so i'm very clear that what i think we invest in, we should be able to insist with high expectation with -- what that work product should be. when i see that the eight key points in their treatise in their percent speckive to us,
3:38 pm
one involving wholesale procurement. number two, data collection and analysis. number three program financial analysis. number five risk review. number five, regulatory and policy review. number six contract term sheets. number seven, development of proposals. and number eight developing r.f.p. really none of this speaks to green jobs. and in this development proposal right now if that is one of the primary goals then there needs to be, i think a more robust expectation that that's something that we need to see spoken to. because i don't think the city does a very good job with green
3:39 pm
jobs whatsoever. and the reliances on this program to deliver green jobs then i would hope that that component be well applied to this particular contract or with another contractor. ms. miller? >> yeah, there is a co ponent of the development of green -- component of the development of green jobs that was submitted and is part of task seven and eight. so it's in the body of the -- of the document. it's not a separate line item. it wasn't separately numbered. >> but what i'm saying is it didn't wow me. it didn't wow me at all. we have gone through p.u.c. we've gone through recurrent energy. we've gone through the solar city contracts. we have gone through -- i cannot tell you how many dozens and dozens of hours of debate through the budget committee and board of supervisors and
3:40 pm
being with the understanding that this would yield green jobs. and i still don't think the city has come to scratching the surface of yielding jobs for disadvantaged communities. it's frankly underwhemming. so in this case what i read beyond the eight key points of this percent speck us to, same thing. i don't see it, i don't feel it. so i want to make sure that if we invest in this, that we're getting something that we absolutely need and they absolutely can deliver on so that it is a quality prict. not just to satisfy but poll dicks or the advocacy because i feel the same need. and if it's local hiring, i mean, then, it's double, i think the standard since this is not a local company. it's not fran-based. so i would expect -- san
3:41 pm
francisco-based. so i would expect there would have to be double the expectations that gives us something that we hope that they deliver. since we're only talking to one company in this case, an a company that we're familiar with. then we should see a brokering of what should come out in the final reporting. >> ok. we have a motion to continue. i don't know if it's been seconded. let me say that now that we have a full compliment of the commission. i was open to the idea of continuing but again i believe that it's important for us to move this forward. i appreciate the comments from the commissioner. i think it's important to be dealt with every penny that we spend and that we provide
3:42 pm
specificity in terms of the deliverables and that we don't spend anymore than we need to. to strike a balance in terms of moving forward with the understanding that we will not spend more than what is needed. and with the understanding that it's been agreed that the p.u.c. will do this work. i would ask for a motion to accept staff's recommendation to aprove, give the executive officer approval or authority to enter into a contract up to an amount of 100,000 but that's not necessarily the amount that will be spent. so is there a motion? motion by commissioner avalos. is there a second. >> second by commissioner
3:43 pm
mikarimi. [voting] >> mr. chair, we have three ayes and one no. >> the motion passes. madam clerk can you call item number five? >> item number five, executive officer's report. >> ms. miller? >> i have no report, thank you. >> but, i'm sorry, i do want to introduce -- i'm going to have jason interview our new intern. i just wanted to get the opportunity to introduce our intern for the summer. last summer, she had different
3:44 pm
tasks to do. she is currently going to u.c. davis and is looking to do green type work in her future. i just wanted to welcome her do our internship program. thank you. >> thank you very much. >> colleagues, any questions? is there any public comment on this item? any money -- body wanting to speak? public comment is closed. madam, can you call item number six. it's within the jurisdiction of the commissioner. seeing none public bhick comment is closed. item seven? >> item number seven, future agenda items." >> colleagues any member of the public that would like to speak? seeing none, public comment was closed. >> just a quick question in terms oaf the join meeting with the -- of the joint meeting
3:45 pm
with the p.u.c., do you need specific dates for us. >> i want to know if you want to meet in august as well. a regular meeting is the fourth friday which is august 26th. so i'll potentially try for a joint meeting on that date. >> so if people have any concerns if you can let ms. miller know. >> thank you. >> man clerk, final item. >> item number eight adjournment. thank you. meeting is adjourned. nice weekend.
3:46 pm
>> this is a dpw corporation
3:47 pm
yard. i work for the bureau of street environmental services used to be street cleaning. we are a new age. >> here we are. >> here we are. >> clean. >> these are our communications dispatchers. hi. okay, no problem. you are welcome. bye-bye. >> all the information about the location, the nature of the complaint and we dispatch it. >> near the steps. >> by new they have started a hundred calls for dispatchers. >> once a get a request if they are not on the air i will page that unit. these are the radio channels. we have 14 channels. i will give a service request. >> there is a lot of expertise that goes into a call.
3:48 pm
i think we can have you dispatch and track. >> 448. >> 448. >> 19th at california. >> can you give us a little bit of a view. >> we have the city broken up to different districts. we will go to zone e. we will go to iowa street. put me to work. >> okay. >> bend it over like that. we chop it.
3:49 pm
>> while you do this if you come across something that looks hazardous, material wise, >> like this paint? >> you can't take paint. >> that gets dealt with by? >> we have a patrol truck thal pick up the paint. >> we have tv monitors and tires. you want to look for needles we don't mix needles with the garbage. >> you have to be a positive person in a way to deal with this job. you are dealing with areas you know it's been cleaned. >> basically it happens a lot where you clean up an area. you come back a couple of days later and it's back to that again. we more or less are used to it.
3:50 pm
that's -- it's our job. you have to get used to it. it's a fact. that's the way it is. >> sure. yeah. >> okay. >> what do you think, are you ready to sign up? >> totally. i'm over dressed. >> a little warm? must be the sweat. >> part of the daily routine is george our steamer. you see the wall people urinate on the and the sidewalk. a trick. i get it up like this. somebody got to do it. the bigger they --
3:51 pm
>> pull the trigger. >> careful, the water's really hot, too. >> i have been on a packer truck. i painted removed graffiti. my favorite. >> what's that smell? pine. one of my favorite, a guy got his head stuck in a trash can. we had to get vasoline and rub his ears. [laughter]. what goes on here we will empty out and clear this area. >> ever find stuff like drugs or anything? do you deal with that. >> i don't know, do you find
3:52 pm
anything? >> everything's trash. >> dave, let's get a little of that. >> the way to do it easier without opening the can is push off the debris off the top and you are topping off the can. we are not supposed to empty the can. there is a can on every corner. sometimes we get calls the majority of my work is done on eyesight if i see it i do it. downtown we fill up 3 or 4 times a day. >> daily it could change and be various different assignments that come up. we can swing by, we see some of the trucks unloading in the area. >> this is our dump site, this is where we dump the debris.
3:53 pm
we come twice a day to unload all the trucks. i need you to go on up there and he will assist you to unloading the mattress and the futons. >> okay. okay. >> sometimes you see it popping out. you have to be very careful. pushing in and down. pull it out. >> you have been here once earlier? >> did you have as much stuff? >> more. >> oh , my god. >> did you survive your day in
3:54 pm
dpw? >> i did i learned quite a bit. the packing truck. shovelling stuff. the steamer i thought i was a candidate for an industrial accident. >> we have 340 employees. most of the people out there do it every day. >> i'm ready to turn in my vest. >> did a good job today. >> would you pass him on probation. >> yes. see you tomorrow at 6
3:55 pm
3:56 pm
3:57 pm
3:58 pm
3:59 pm