tv [untitled] October 1, 2011 5:30pm-6:00pm PDT
5:30 pm
to allow them to not be part of the herd, so to speak, under pressure, as a staff with at the time necessary to walk them through what can be very daunting process. i have a four plan and a map of where the services occur. since it is not a simple square or rectangle and there is a disconnect between service areas, a map would be very helpful. we would like to include that in the package for customers. additional sign it right now, it would go a long ways in directing customers who have not been here before too not wander in the wrong direction.
5:31 pm
also, another suggestion i had more combat a programs related. if our plan review provider is able to service customers who have been there for an extended period time, the idea was perhaps flashes that were read. the point is to bring attention to staff to deal with that, or supervisors, to see what we can do, to make adjustments, if necessary, to employ additional resources. with that, i am open to any questions commissioners might have.
5:32 pm
>> thank you. of like to thank you and the acting director for kicks starting this. i had been pretty skeptical with all of these different departments. but you somewhat convinced me the other day that you could probably iron out all of this. also, this system will be shellshocked to a lot of people when they first come in there. they will be screaming and kicking. they are not going to like it. the part that i like about it is that it will identify people in this department also. people over the last year or two.
5:33 pm
one is producing more than the other, this system will identify who is producing into is not. we will have to get a report on that and that's why. i am pleasantly optimistic that we can implement this. it annoys me a bit that we have had this for so long and dragged our butts without getting going, so i commend you for getting it going. >> i know that this has been a project that the director and staff have been working on for a long time. the details have been very important. it is good to see all of this falling in line. one of the things that i've
5:34 pm
brought up was the ability for the q-matic to record needed information into the tracking system. to save keystrokes, if nothing else. if the project leaves its station, the q-matic, it would be nice to have it record that into the system. it may be that it can serve as an audit on a daily basis. not just a number of products -- projects that the station has, but you need to look at extending the projects that people are doing in the station. i do not necessarily think that the number of permits issued to a certain station should be an
5:35 pm
indicator of whether they are doing a good job or not. projects, in that are more complicated. i think that how we have laid out the department now is really good. i think that the >> q-matic -- -- q-matic will help. silage should be above all i level. whenever the silage, it should be viewable from far away. you cannot see through people to see them, so hopefully we can get some help to identify the station and put the q-matic signs up. i appreciate the work that
5:36 pm
you're doing in the stead of our director, was off on medical leave, stepping in with these projects is really important. thank you for the work you are doing. >> i want to congratulate you and the department. i think that this system will go a long way to address several issues. the chief being everything transparent. everything time. keeping the process moving, so to speak. reducing waste, it will help management, you see, with what is going on. we will learn about how things are going on in certain sections. but will not go so far to say that this will show where we are not performing. it may show them what we need in terms of resources as well.
5:37 pm
for that, in the stem that there may be some great group of customers that might be used to the old way of doing things. i hope that they will keep an open mind, open their eyes, seeing that this is good for the entire industry. meaning that they will no longer have to say that i need to do this and this, they can said that they will be treated the same way, and fairly, moving through the system quickly. so, thank you. >> i really appreciate the discussion as well. and the introduction by also appreciate the way that the department went about implementing it, even if it was slower than what we wanted. a think that was very informational for me.
5:38 pm
that is maybe not the way it was set up in other cities. we heard about that from different advisory board people who came to that meeting. that is the way san francisco is. when the walked into that building, there was innovation with planning, the fire department, puc, multiple things. we're trying to do it right the first time. i do want to echo the thing about the data. i would appreciate having a look at that. maybe not so much as other commissioners have said looking at performance by our staff, but also what we need. if we need more staff, we can go to the mayor's office and human resources and say this is where the gridlock is. we could use more, with averages. to me, the date that is not only something the staff should be
5:39 pm
added thing. this is where we could go and ask for more. we need more help in these areas. so i think the data is going to be a real plus for us. i was wondering that hopefully the step will keep us informed. it starts in october. within a couple of months of the new year, we will start being able to look at that data. >> i would also like to commend both acting director sweeney and the staff that basically made this happen. it has been far too long that it took, but at the same time we are here now. the category of the metrics this provides is on the staff and technology that brings us up to speed. it will help with the work flow. it is good for the public and staff.
5:40 pm
that, the challenge will be the acceptance of staff and the public on certain sectors. but i think let us give it the due process and do time to see if it does work. also, hoping to navigate the coordination of multiple departments is point to be huge. also, the metric of tracking it all the way through is going to be good. but we need some tweaking that will happen along the way. one of those i see it right off the bat is the multiple permits, especially on the category of windows, where at times applying for multiple permits and, all of the windows are basically all metal or a category that does not fit in certain types of buildings. it would not be appropriate i think that is something to
5:41 pm
really flag, if it flags that a metal window does not go into a historical building it should raise that as a red flag. all told, i am just elated that we are finally here. >> i would like to say one more thing. i would like the director to direct that it is brought to the meeting and let the stake holders get their feedback on this. at the end of the day, they are the ones who are paying the bill. >> thank you very much. >> commissioners, thank you for the sentiments. i think staff appreciates those sentiments. we are looking forward to utilizing as a management tool to do some long-range planning, strategic planning, founded on the demand for our services, and
5:42 pm
not just, right now, doing with clipboards and having a staff member just how things with checkmarks and stuff. it is cumbersome. it is not accurate. hopefully this system will be accurate. it would give us the data on the spot for providing services that can be adjusted as the demand changes from day to day and hour to hour. in terms of additional staff for justification, i think this is the kind of data we need to develop to support, especially requests for clerks. i know in the past it has been difficult for our customers, who have had a long day and have had a difficult time paying for their services. it takes time. there are multiple departments to collect fees for. it is a longer process than simply collecting one check or
5:43 pm
credit card action. it does take a lot of work from our clerks. they are always under the gun. so we appreciate the sentiments from the commissioners. thank you very much. >> item eight e, update on other technology projects. >> we have been doing some web enhancements. we now have plumbing inspection scheduling on line. we have a soft relief -- release of permits to activate boilers. we are working on the program to schedule electrical inspections over the web. we are working on the testing for requesting 3r over the web. we are also working on what we
5:44 pm
call our server refresh project. that is a project we budgeted for in this fiscal year, because most of our servers are going to be out of useful life at the end of this year, this calendar year. we are working with the department of technology on getting approval to replace those. we are working on a project with the treasure tax collector on replacement of our cash management system. this will hopefully speed up the time it takes to use the existing cash register system to hopefully speed up that process, so that maybe it can reduce the amount of time it takes for our customers to pay. we are continuing to do a refresh of our pc's.
5:45 pm
we have a replacement plan in our department. we got behind on that because of funding, but we have about 80% of its complete and are in the final 20%. we have ongoing projects. one is with the department of technology and other entities that use the addressing system, having that integrate with our addressing system. also, puc wants us to do some programming to incorporate some of their ordinances into our permitting process. we continue to work on other projects other than the permit tracking system in terms of our technology. president hechanova: thank you. >> thanks. >> item eight f, update on new hires.
5:46 pm
>> commissioner sweeney, acting director. since july 2011, we have hired approximately 22 -- we fired for it -- we have hired 14 new employees. we have eight under recruitment. the 14 we hired, eight would be clerks, three inspectors, one engineer, one of the secretary, and one administrative analyst. the eight positions we are currently under recruitment, three are engineers. one is an electrical inspector. one is business analysis. one is senior account clerk. a project manager and an account in turn. they are all in various stages of being hired. any questions? >> what about mechanical engineer? >> that would be one of the engineers we are talking about.
5:47 pm
the 52 07 -- there are too mechanical engineers. the other is -- the 5207, there are two mechanical engineers. at the end of october, there will be another list and we will have more people to pick from. >> if they were to be hired, will they come on board in october? is that the portal? >> the 207's, the interviews have already occurred. so six weeks. the hardest thing is to get the interview and get the list. president hechanova: thank you. >> is the public comment on the director's report, items eight a through f th? seeing none, item nine,
5:48 pm
commissioners' questions and matters. at this time, commissioners may make inquiries to staff the regarding documents and procedures of interest to the commission. >> if somebody applies for a permit to do foundation termite work, which is very common after a termite inspection, why does the planning department get a big portion of that feat? they do not seem to do anything. i did not want to ask that question when there are people here who would not know. maybe you know. >> i would venture that it would have to do with stucco repair, so it is visible from the street. therefore, it would have to go under the planning review, probably in the first floor, straight over the counter.
5:49 pm
>> could you maybe do a little research on that and a more definitive answer maybe next time? thanks. >> item eight b, future meetings are agendas. the commission might take action to set the date of a special meeting or determine items that could be placed on the agendas of future meetings of the building inspection commission. the next regularly scheduled meeting is october 19. >> i really would like to get a constant update from the caps extension. we have important programs and other relevant stuff that need to be ongoing. i think the more that we can find out what is up --
5:50 pm
>> they are not under our jurisdiction anymore. >> request it. we are all working together. we also have the standards of repair. there is a lot of stuff that is still loose ends of the caps work we did. i think the more that we have them tell us about it, the more we will be ready for it. thank you. >> is there anything else to add for the future meeting or business? as i mentioned, the next meeting is october 19. is there public comment on item nine a or b? seeing none, item 10, review and approval of the meetings -- of the minutes of the regular meeting of february 16, 2011. >> move to approve. >> are all on favor -- are all in favor? the minutes are approved.
5:51 pm
item 11, review and approval of the minutes of the regular meeting of march 16, 2011. >> move to approve. >> second. >> public comment? there is no public. >> aye. i also want to thank you for catching up on those minutes. i know we are behind and it is a hassle. thank you very much. >> item 12, adjournment. is there a motion to adjourn? >> i will make that motion. >> i will second that. aye. >> now adjourned, 1:13 pm >> where is our trash can?
5:52 pm
♪ >> hello, and welcome to the department of elections right choice voting instructional video. it is part of the department of elections right choice voting outreach campaign and is designed to educate san francisco rig franciscoht choice voting. today we will learn what it is and who is elected using this voting method. we will also talk about with the ranked joyce l. looks like and how to market correctly. finally, we will see how the
5:53 pm
ranked joyce voting process works and to you an example of an election using ranked choice of voting. so, what is ranked joyce voting? in march 2002 san francisco voters adopted a charter to implement ranked choice of voting, also known as instant runoff voting. san francisco voters will use it to elect most local officials by selecting a first choice candidate in the first column on the ballot and deborah second and third choice candidates in the second and third columns resect to do -- respectively. this makes it possible to elect local officials with the majority of votes. more than 50% without the need for a second runoff election. in san francisco, ranked choice of voting is for the election of members of the board of supervisors, the mayor, sharon, just -- district attorney, city
5:54 pm
attorney, treasurer, this is a recorder, and public defender. ranked joyce voting does not apply to elections for local school and community college board members. number the election of state or federal officials. ranked choice of voting does not affect the adoption ballot measures. when voters received their ballot, either at a polling place or an absentee ballot in the mail, it will consist of multiple cards. voters will receive cards with contests for federal and state offices, as well as for state propositions and local ballot measures. for ranked choice voting contest, voters will receive a separate ranked choice ballot card. it will have instructions to rank three choices, which is new. the ranked choice ballot is designed in the side by side column format that lists the names of all candidates in each of the three columns.
5:55 pm
when marking the ranked choice ballot, voters elect their first choice in the first column by completing the aero pointing to their choice. for their second choice, voters selected different wind by completing the arab pointing to their choice in the second column. for their third choice, voters elect a different candidate by completing the arrow pointing to their choice. voters wishing to vote for qualified write-in candidate can write it in on the line provided. and they must complete the arrow pointing to their choice. keep in mind, it voters should select a different candidate for each of the three columns of the ranked choice ballot card. if the voters elect the same candidate in more than one column, his or her vote for that candidate will count only once. also, a voter's second choice will be counted only if his or her first choice candidate has
5:56 pm
been eliminated. and a voter's third choice will be counted only if both his or her first and second choice candidates have been eliminated. we have talked about how to mark the ranked choice ballot. now let's look at how ranked choice of voting works. initially, every first choice vote is a candidate. any candidate that receives a majority, more than 50% of the first choice to vote, is determined to be the winner. if no candidate receives more than 50% of the first choice votes, a process of eliminating candidates and transferring votes begins. first, the candidate who received the fewest numbers of first choice votes is eliminated from the race. second, voters who selected the eliminated candidate as their first choice will have their vote to transfer to their second choice. there, all the votes are recounted.
5:57 pm
fourth, if any candidate receives more than 50% of the votes, he/she is declared the winner. if no candidate receives more than 50% of the vote, the process of eliminating candidates and transferring votes is repeated until one candidate has a winning majority. now let's look at an example of an election using ranked choice of voting. in this example, we have three candidates. candidate a, b, and c. after all the first choice votes are counted, none of the three candidates has received more than 50%, or a majority of the first choice vote cast. candidate a g-205% ofb the votes% received 40%. and c received 35% of the boats. because no candidate received a majority, the candidate who received the fewest number of
5:58 pm
first choice votes, a candidate a, is eliminated from the race. voters to pick a candidate a as their first choice candidate will have their but transferred to their second choice. and the voters to pick and a, 15% chose candidate b as their second choice, and 10% chose c as their second choice. these votes are then applied to b and c, and the votes are recounted. candidate b now has 55% of the votes. candidate c as 45%. candidate b has more than 50% of the votes and is determined as the winner. >> thank you for watching. we hope you have ranked choice learned ranked choice of voting and was elected. you have seen the ballot, learned how to market, and learned how the voting process works. if you have any further questions about ranked choice
5:59 pm
78 Views
IN COLLECTIONS
SFGTV: San Francisco Government Television Television Archive Television Archive News Search ServiceUploaded by TV Archive on